Difference between revisions of "Barracuda P-43 FPSO"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) (Created page with "Summary Information * Name: Barracuda P 43 FPSO * Field: Barracuda Oil Field * Country: Brazil * Ownership: Petrobras * Website: * Field Operated By: Petrobras * Capacit...") |
Abarrelfull (talk | contribs) |
||
| Line 18: | Line 18: | ||
* **KBR:** Lump Sum EPC contract | * **KBR:** Lump Sum EPC contract | ||
* **Jurong Shipyard:** | * **Jurong Shipyard:** | ||
| − | + | ** FPSO conversion | |
| − | + | ** Fabrication of topside production modules | |
| − | + | ** Integration of the Barracuda topside production modules with its newly-converted hull | |
* **ABB:** Electrical Systems | * **ABB:** Electrical Systems | ||
* **Jotun:** Painting | * **Jotun:** Painting | ||
Revision as of 15:25, 9 January 2024
Summary Information
- Name: Barracuda P 43 FPSO
- Field: Barracuda Oil Field
- Country: Brazil
- Ownership: Petrobras
- Website:
- Field Operated By: Petrobras
- Capacity: 150,000 bpd
- Year of Completion:
+++ Brief Description
- The vessel has capacity to produce 150,000 barrels per day of oil plus gas compression capacity of 6 million m3/d. It is equipped with water injection capacity of 40,000 m3/d and can accommodate 100 personnel offshore.
- The P-43 project involved the conversion of the 270,000 dwt VLCC Stena Continent
+++ Contractors
- **KBR:** Lump Sum EPC contract
- **Jurong Shipyard:**
- FPSO conversion
- Fabrication of topside production modules
- Integration of the Barracuda topside production modules with its newly-converted hull
- **ABB:** Electrical Systems
- **Jotun:** Painting
+++ Status
- In operation
+++ History
- 2001 - Jurong Shipyard secured the FPSO conversion project
- 2005 - Production began
+++ Other Information
- -
+++ Links