=== Contractors ===
 
=== Contractors ===
* SBM Offshore: Construction, lease and operation
+
* '''SBM Offshore:''' Construction, lease and operation
 +
* '''BOMESC:''' General contractor responsible for the construction of the upper module of the Project as well as the hull integration, final assembly and commissioning works.
  
 
=== Status ===
 
=== Status ===
Line 24: Line 25:
 
=== History ===
 
=== History ===
 
* 2019 - Phase 2 of the Mero development launched
 
* 2019 - Phase 2 of the Mero development launched
 +
* 2023 - Vessel sails from China to Brazil
 
* 2023 - First oil produced
 
* 2023 - First oil produced
  
Line 33: Line 35:
  
 
# [https://abarrelfull.blogspot.com/2024/01/sbm-offshore-signs-fpso-sepetiba.html Brazil: SBM Offshore signs FPSO Sepetiba contracts]
 
# [https://abarrelfull.blogspot.com/2024/01/sbm-offshore-signs-fpso-sepetiba.html Brazil: SBM Offshore signs FPSO Sepetiba contracts]
 +
# [https://abarrelfull.blogspot.com/2024/01/fpso-sepetiba-set-sail-smoothly.html FPSO SEPETIBA Set Sail Smoothly]
 
# [https://a-barrel-full.blogspot.com/2024/01/petrobras-puts-platform-vessel-into-pre.html Petrobras puts platform vessel into pre-salt production]
 
# [https://a-barrel-full.blogspot.com/2024/01/petrobras-puts-platform-vessel-into-pre.html Petrobras puts platform vessel into pre-salt production]
  

Latest revision as of 10:45, 2 January 2024

Summary Information

Brief Description

  • Sepetiba FPSO is 333 meters long, 64 meters high and 60 meters wide, with a main deck area equivalent to about 3.5 standard football fields, an oil storage capacity of 2 million barrels and a maximum displacement of 450,000 tons
  • The vessel has capacity to produce up to 180 thousand barrels of oil a day and compress up to 12 million cubic meters of gas.
  • It is the second phase of the Mero development

Contractors

  • SBM Offshore: Construction, lease and operation
  • BOMESC: General contractor responsible for the construction of the upper module of the Project as well as the hull integration, final assembly and commissioning works.

Status

  • In operation

History

  • 2019 - Phase 2 of the Mero development launched
  • 2023 - Vessel sails from China to Brazil
  • 2023 - First oil produced

Other Information

  • -

Links

  1. Brazil: SBM Offshore signs FPSO Sepetiba contracts
  2. FPSO SEPETIBA Set Sail Smoothly
  3. Petrobras puts platform vessel into pre-salt production