Difference between revisions of "Sepetiba FPSO"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) (Created page with "=== Summary Information === * Name: * Field: * Country: * Ownership: * Website: * Field Operated By: * Capacity: bpd * Year of Completion: === Brief Description ===...") |
Abarrelfull (talk | contribs) |
||
(3 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
=== Summary Information === | === Summary Information === | ||
− | * Name: | + | * Name: Sepetiba FPSO |
− | * Field: | + | * Field: [[Mero Oil Field]] |
− | * Country: | + | * Country: Brazil |
− | * Ownership: | + | * Ownership: SBM Offshore |
− | * Website: | + | * Website: https://www.sbmoffshore.com/ |
− | * Field Operated By: | + | * Field Operated By: Sepetiba FPSO |
− | * Capacity: | + | * Capacity: 180,000 bpd |
− | * Year of Completion: | + | * Year of Completion: 2023 |
=== Brief Description === | === Brief Description === | ||
− | * | + | * Sepetiba FPSO is 333 meters long, 64 meters high and 60 meters wide, with a main deck area equivalent to about 3.5 standard football fields, an oil storage capacity of 2 million barrels and a maximum displacement of 450,000 tons |
+ | * The vessel has capacity to produce up to 180 thousand barrels of oil a day and compress up to 12 million cubic meters of gas. | ||
+ | * It is the second phase of the Mero development | ||
=== Contractors === | === Contractors === | ||
− | * | + | * '''SBM Offshore:''' Construction, lease and operation |
+ | * '''BOMESC:''' General contractor responsible for the construction of the upper module of the Project as well as the hull integration, final assembly and commissioning works. | ||
=== Status === | === Status === | ||
− | * | + | * In operation |
=== History === | === History === | ||
− | * - | + | * 2019 - Phase 2 of the Mero development launched |
+ | * 2023 - Vessel sails from China to Brazil | ||
+ | * 2023 - First oil produced | ||
=== Other Information === | === Other Information === | ||
Line 29: | Line 34: | ||
=== Links === | === Links === | ||
− | # [ ] | + | # [https://abarrelfull.blogspot.com/2024/01/sbm-offshore-signs-fpso-sepetiba.html Brazil: SBM Offshore signs FPSO Sepetiba contracts] |
+ | # [https://abarrelfull.blogspot.com/2024/01/fpso-sepetiba-set-sail-smoothly.html FPSO SEPETIBA Set Sail Smoothly] | ||
+ | # [https://a-barrel-full.blogspot.com/2024/01/petrobras-puts-platform-vessel-into-pre.html Petrobras puts platform vessel into pre-salt production] | ||
[[Category:FSPO]] | [[Category:FSPO]] | ||
− | [[Category: | + | [[Category:Brazil]] |
− | [[Category: | + | [[Category:Petrobras]] |
Latest revision as of 10:45, 2 January 2024
Contents
Summary Information
- Name: Sepetiba FPSO
- Field: Mero Oil Field
- Country: Brazil
- Ownership: SBM Offshore
- Website: https://www.sbmoffshore.com/
- Field Operated By: Sepetiba FPSO
- Capacity: 180,000 bpd
- Year of Completion: 2023
Brief Description
- Sepetiba FPSO is 333 meters long, 64 meters high and 60 meters wide, with a main deck area equivalent to about 3.5 standard football fields, an oil storage capacity of 2 million barrels and a maximum displacement of 450,000 tons
- The vessel has capacity to produce up to 180 thousand barrels of oil a day and compress up to 12 million cubic meters of gas.
- It is the second phase of the Mero development
Contractors
- SBM Offshore: Construction, lease and operation
- BOMESC: General contractor responsible for the construction of the upper module of the Project as well as the hull integration, final assembly and commissioning works.
Status
- In operation
History
- 2019 - Phase 2 of the Mero development launched
- 2023 - Vessel sails from China to Brazil
- 2023 - First oil produced
Other Information
- -