Abarrelfull (talk | contribs) (Created page with "Summary Information * Operator: Exxon * Country: Angola * Location: Block 15 * Production start: 2008 * Partners: Exxon - 40%, BP - 26.67%, Eni - 20%, Statoil - 13.33% * Typ...") |
Abarrelfull (talk | contribs) |
||
Line 11: | Line 11: | ||
+++ Description | +++ Description | ||
* The field is part of the Kizomba C Project, along with the [[Mondo Oil Field]] | * The field is part of the Kizomba C Project, along with the [[Mondo Oil Field]] | ||
− | * The Saxi-Batuque project will be developed using a the [[Saxi Batuque FPSO]] host with tie back of two drill centres for Batuque and two drill centres for Saxi. | + | * The Saxi-Batuque project will be developed using a the [[Saxi-Batuque FPSO]] host with tie back of two drill centres for Batuque and two drill centres for Saxi. |
+++ Contractors | +++ Contractors |
Latest revision as of 14:59, 18 December 2023
Summary Information
- Operator: Exxon
- Country: Angola
- Location: Block 15
- Production start: 2008
- Partners: Exxon - 40%, BP - 26.67%, Eni - 20%, Statoil - 13.33%
- Type: Oil / Gas
- Estimated Reserves:
- Production Volume:
+++ Description
- The field is part of the Kizomba C Project, along with the Mondo Oil Field
- The Saxi-Batuque project will be developed using a the Saxi-Batuque FPSO host with tie back of two drill centres for Batuque and two drill centres for Saxi.
+++ Contractors
- **Keppel:** FPSO conversion
- **Subsea 7:** Design, pipe fabrication and installation of 16 steel flowlines and their accompanying flowline terminations. In total, there will be 50km of flowlines ranging between 6” and 10” in diameter.
+++ History
- 2000 - Saxi oil field discovered
- 2006 - Subsea 7 awarded flowlines contract
- 2008 - FPSO conversion completed
+++ Geology
+++ Links