Difference between revisions of "AURA Oil And Gas Processing References"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) (Created page with "# Liwan 3-1 Gas Field #* China #* CNOOC #* 4x12000kW - WHRU 3x8000kW Fired boiler CPE IRAQ Halfay Phase I 4x12000kW (3x41 MBtu/h) (Gas fired) CNOOC Indonesia Sumatra...") |
Abarrelfull (talk | contribs) |
||
Line 3: | Line 3: | ||
#* CNOOC | #* CNOOC | ||
#* 4x12000kW - WHRU | #* 4x12000kW - WHRU | ||
− | + | # [[Halfaya Oil Field]] | |
− | + | #* IRAQ | |
− | 3x8000kW | + | #* CPE - IRAQ |
− | Fired boiler | + | #* 3x8000kW - Fired boiler - Phase I |
− | |||
− | Phase I | ||
Revision as of 14:13, 11 December 2023
- Liwan 3-1 Gas Field
- China
- CNOOC
- 4x12000kW - WHRU
- Halfaya Oil Field
- IRAQ
- CPE - IRAQ
- 3x8000kW - Fired boiler - Phase I
4x12000kW (3x41 MBtu/h) (Gas fired)
CNOOC Indonesia Sumatra Gas Field 4x10000kW (4x34 MBtu/h) (Diesel, Crude Oil and Gas Fired)
CNOOC QHD326 FPSO
12000kW (41 MBtu/h) (Heavy Oil fired) Shanghai Petro-chemical, Polyester Production
- Beijing Yanshan Company Refinery
- China
- SINOPEC Yanshan Petro-chemical
- 2x3000kW (2x10 MBtu/h) (Diesel Oil, Gas fired)
2x6100kW (2x21 MBtu/h) (Gas fired) CNPC (International) Sudan Fula Oil Field
- Luda 27-2 And LD 32-2 Oil Fields
- China
- CNOOC
- 3x5000kW (3x17 MBtu/h) (WHRU)
2x4x13200kW (2x4x45 MBtu/h) (Diesel oil & Crude oil fired)
PDOC Sudan Block3-7
- Kela-2 Gas Field
- China
- CNPC
- 2x6700kW (2x23 MBtu/h) (Gas fired)
- Qinhuangdao Offshore Oil Field
- Nanbao Offshore Oil Field
- China
- CNOOC
- 3x5000kW (3x17 MBtu/h) (Gas,diesel oil & crude oil fired)
- Bozhong 28-2S Oil Fields
- China
- CNOOC
- 3x6000kW (3x20 MBtu/h) (WHRU)