Difference between revisions of "Rabi Oil Field"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) |
||
(One intermediate revision by the same user not shown) | |||
Line 13: | Line 13: | ||
* The oil is pumped to the coast via the [[Rabi to Gamba Crude Pipeline]] | * The oil is pumped to the coast via the [[Rabi to Gamba Crude Pipeline]] | ||
− | === Contractors | + | === Contractors === |
* **Mott MacDonald:** Installation of a gas injection system to maintain production despite depletion | * **Mott MacDonald:** Installation of a gas injection system to maintain production despite depletion | ||
Line 24: | Line 24: | ||
* 2018 - Assala Energy acquired stakes from both Shell and Total | * 2018 - Assala Energy acquired stakes from both Shell and Total | ||
− | === Geology | + | === Geology === |
* The hydrocarbons are contained within the highly permeable sands of the Gamba and Dentale formations which were deposited in a rift basin of early Cretaceous age, the Dianongo Basin. Trapping is provided by structural closure at the base of the Aptian Ezanga salt. | * The hydrocarbons are contained within the highly permeable sands of the Gamba and Dentale formations which were deposited in a rift basin of early Cretaceous age, the Dianongo Basin. Trapping is provided by structural closure at the base of the Aptian Ezanga salt. | ||
Latest revision as of 15:43, 5 December 2023
Summary Information
- Operator: Assala Energy
- Country: Gabon
- Location: Two degrees south of the equator in a remote, sparsely inhabited part of the primary rain forest of equatorial Africa, some 140 km south of Port-Gentil, the economic capital of Gabon
- Production start: 1989
- Partners: Assala Energy 100%
- Type: Rabi Light Crude Oil
- Estimated Reserves:
- Production Volume: 23,000 bbl/d in 2010 ( 217,000 bbl/d at its peak in 1997)
Description
- A Giant Oil Field in a Rift Basin, Onshore Gabon
- The oil is pumped to the coast via the Rabi to Gamba Crude Pipeline
Contractors
- **Mott MacDonald:** Installation of a gas injection system to maintain production despite depletion
History
- 1985 - The Rabi-Kounga Field discovered by Shell
- 1989 - The Field came on stream in January
- 2003 - TotalFinaElf announced the signature of an exploration and production sharing contract (ESPC) to replace the concession agreement
- 2009 - Shell increased it share from 44.3% to 94.3% in a Hess asset swap
- 2015 - Wood group awarded engineering, construction, maintenance contract
- 2018 - Assala Energy acquired stakes from both Shell and Total
Geology
- The hydrocarbons are contained within the highly permeable sands of the Gamba and Dentale formations which were deposited in a rift basin of early Cretaceous age, the Dianongo Basin. Trapping is provided by structural closure at the base of the Aptian Ezanga salt.
Links
- Mott MacDonald, Gas Reinjection, Rabi Field
- Discovery and Development of the Rabi-Kounga Field: a Giant Oil Field in a Rift Basin, Onshore Gabon
- Total Upstream History in Africa
- Shell in strategic asset swap with Hess
- Gabon: TotalFinaElf Announces the Signature of the Extension of the Rabi-Kounga License with Gabonese Republic
- Wood Group wins major Shell Gabon contract
- Assala Energy acquires Total Gabon’s remaining stake in the Rabi-Kounga Block