| + | # [[Schwechat Refinery]] | ||
| + | #* Replacement of several plant components in the catalytic part of the FCC plant; process engineering carried out by licensor UOP, process optimization (stripper incl. reactor compensator) | ||
| + | #* Client: OMV | ||
| + | #* Location: Schwechat/ Austria | ||
| + | #* Scope of work: Study and execution phase (assess, select, define, execution), Detail engineering, Procurement support, Project management, Scheduling, Construction supervision | ||
| + | #* Commissioning: 2023 | ||
| + | # [[Petrobrazi Ploiesti Refinery]] | ||
| + | #* Evaluation of approx. 70 tanks including infrastructure (pumps, pipelines, foundations, etc.) at the Petrobrazi refinery. Evaluation with 3D laser scans. Shutdown, revitalization or new construction according to economical, safety-related and environmental criteria. Construction of a new 10,000 m3 storage tank for heavy reformate with an aluminum dome. | ||
| + | #* Client: OMV Petrom SA | ||
| + | #* Location: Petrobrazi / Romania | ||
| + | #* Scope of work: Authority engineering, Detail engineering, Procurement, Construction management, HSE responsibility on site, Authority documentation, Commissioning | ||
| + | #* Commissioning: 2022 | ||
| + | # [[Schwechat Refinery]] | ||
| + | #* Retrofitting of the existing HDS1 high-pressure desulfurization plant; replacement of the reactor, heat exchangers and connecting pipelines | ||
| + | #* Client: OMV Refining & Marketing | ||
| + | #* Location: Schwechat / Austria | ||
| + | #* Scope of work: Study, FEED, Detail engineering, Construction supervision, Commissioning support | ||
| + | #* Commissioning: 2020 | ||
| + | # [[Schwedt Refinery]] | ||
| + | #* Modification of the existing Arosolvan plant: replacement of N-methyl-2-pyrrolidone (NMP) by the less toxic solvent tetraethylene glycol (TTEG), minimization of energy and utilities consumption | ||
| + | #* Client: PCK Raffinerie GmbH Schwedt | ||
| + | #* Location: Schwedt / Germany | ||
| + | #* Scope of work: Extended basic engineering, Detail engineering, Procurement, Construction supervision | ||
| + | #* Commissioning: 2020 | ||
| + | # [[Schwedt Refinery]] | ||
| + | #* Revamp of existing crude oil distillation plant with replacement of two side strippers, pre-column and liquid gas column with associated reboilers during compound shutdown ‘Step2’ | ||
| + | #* Client: PCK Raffinerie GmbH Schwedt | ||
| + | #* Location: Schwedt / Germany | ||
| + | #* Scope of work: Detail engineering, Authority engineering support, Procurement, expediting, Construction supervision | ||
| + | #* Commissioning: 2019 | ||
| + | # [[GS-Caltex Yeosu Refinery]] | ||
| + | #* Extension of the existing measuring, dosing and blending systems to improve plant flexibility and to double capacity. | ||
| + | #* Client: GS Caltex Corporation | ||
| + | #* Location: Seoul / South Korea | ||
| + | #* Scope of work: Delivery of equipment, Construction supervision, Commissioning support | ||
| + | #* Commissioning: 2019 | ||
| + | # [[Hamburg Ölwerke Schindler Refinery]] | ||
| + | #* Conversion of the propane deasphalting plant (PDA plant) engineered and installed by EDL in 2011 incl. use of solvent mixture instead of propane | ||
| + | #* Client: H&R Ölwerke Schindler GmbH | ||
| + | #* Location: Hamburg / Deutschland | ||
| + | #* Scope of services: Basic engineering, Detail engineering, Authority engineering, Procurement, Construction supervision, Commissioning support | ||
| + | #* Commissioning: 2018 | ||
| + | # [[Miro Karlsruhe Refinery]] | ||
| + | #* Optimization of the coker unit with replacement of two coke drums; weight per coke drum: 400 mt, height per coke drum: 35 m | ||
| + | #* Client: Mineraloel Raffinerie Oberrhein GmbH | ||
| + | #* Location: Karlsruhe / Germany | ||
| + | #* Scope of services: Detail engineering, Field engineering | ||
| + | #* Commissioning: 2018 | ||
| + | # [[Schwechat Refinery]] | ||
| + | #* Revamp of the FCC Unit in several projects like, optimization of the main column condensation, replacement of the main valves, dismantling of the old and installation of a new modified waste heat boiler. Finalization during TAR 2017. | ||
| + | #* Client: OMV Refining & Marketing GmbH | ||
| + | #* Location: Schwechat / Österreich | ||
| + | #* Scope of work: FEED, Basic Engineering, Detail Engineering, Procurement assistance, Site and construction supervision, Scheduling support for TAR 2017, Commissioning support | ||
| + | #* Commissioning: 2017 | ||
| + | # [[Novopolotsk Refinery]] | ||
| + | #* Modernization of a PDA plant in cooperation with Sulzer Chemtech (internals) and Kremsmüller (columns). | ||
| + | #* Client: OAO Naftan | ||
| + | #* Location: Novopolozk / Belarus | ||
| + | #* Scope of work: Pilot tests in company owned pilot plant, Technological design, Delivery of 2 extraction columns | ||
| + | #* Commissioning: 2016 | ||
| + | # [[Schwechat Refinery]] | ||
| + | #* Replacement of the HDS3 reactor in the plant for desulfurisation and denitrification of vacuum gasoil; the technical configuration of the reactor: 465°C and 80bar, 25m high and 382t | ||
| + | #* Client: OMV Refining & Marketing GmbH | ||
| + | #* Location: Schwechat / Austria | ||
| + | #* Scope of work: FEED, Basic engineering, Detail engineering, Procurement, Site and construction supervision, Commissioning support | ||
| + | #* Commissioning: 2016 | ||
| + | # [[Schwechat Refinery]] | ||
| + | #* Revamp of the crude oil distillation RD-4 for yield improvement and enhanced plant operation mode | ||
| + | #* Client: OMV Refining & Marketing GmbH | ||
| + | #* Location: Schwechat / Austria | ||
| + | #* Scope of work: FEED, Detail engineering, Procurement, Construction supervision, Commissioning support | ||
| + | #* Commissioning: 2016 | ||
| + | # [[Schwechat Refinery]] | ||
| + | #* DEA plant, yield improvement and enhanced plant operation mode, replacement of column and key equipment | ||
| + | #* Client: OMV Refining & Marketing GmbH | ||
| + | #* Location: Schwechat / Austria | ||
| + | #* Scope of work: FEED, Basic engineering, Detail engineering, Procurement, Site and construction supervision, Commissioning support | ||
| + | #* Commissioning: 2016 | ||
| + | # [[Schwedt Refinery]] | ||
| + | #* Revamp of the crude oil distillation unit 1 with replacement of the vacuum column and a stripper column, mounted by modules; finalized at the shut-down "kleiner 16"; the vacuum column is 71 m high and one the the biggest refinery buildings | ||
| + | #* Client: PCK Raffinerie GmbH Schwedt | ||
| + | #* Location: Schwedt, Germany | ||
| + | #* Scope of work: Basic engineering, Detail engineering, Procurement, Construction supervision | ||
| + | #* Commissioning: 2016 | ||
| + | # [[Schwedt Refinery]] | ||
| + | #* Replacement of the regenerator in the FCC unit; because of the heavy weight (648 t) it was delivered in three segments and was completed together with the LCO recovery project during the shutdown "kleiner 16" | ||
| + | #* Client: PCK Raffinerie GmbH Schwedt | ||
| + | #* Location: Schwedt, Germany | ||
| + | #* Scope of work: Detail engineering, Procurement, Construction and mounting supervision | ||
| + | #* Commissioning: 2016 | ||
| + | # [[Buna SOW Leuna Refinery]] | ||
| + | #* Reconstruction of the FCC-Reactor | ||
| + | #* Client: TOTAL Raffinerie Mitteldeutschland GmbH | ||
| + | #* Location: Leuna, Germany | ||
| + | #* Scope of work: Detail engineering, Procurement, Construction and assembling supervision, Commissioning | ||
| + | #* Commissioning: 2014 | ||
| + | # [[Buna SOW Leuna Refinery]] | ||
| + | #* Reconstruction of the FCC-Gas Postprocessing Unit to increase the yield composition | ||
| + | #* Client: TOTAL Raffinerie Mitteldeutschland GmbH | ||
| + | #* Location: Leuna, Germany | ||
| + | #* Scope of work: Detail engineering, Procurement, Construction and assembling supervision, Commissioning | ||
| + | #* Commissioning: 2014 | ||
# [[Schwedt Refinery]] | # [[Schwedt Refinery]] | ||
#* Desulphurization plant - hazop findings dk2 | #* Desulphurization plant - hazop findings dk2 | ||
| Line 20: | Line 122: | ||
#* Scope of work: Project management, Basic engineering, Detailed engineering, Procurement, Site and construction supervision, Commissioning assistance | #* Scope of work: Project management, Basic engineering, Detailed engineering, Procurement, Site and construction supervision, Commissioning assistance | ||
#* Commissioning: 2014 | #* Commissioning: 2014 | ||
| − | + | # [[Schwechat Refinery]] | |
| − | butadiene production unit | + | #* butadiene production unit |
| − | + | #* EPCM-Contractor for capacity extensions to Butadiene production unit | |
| − | EPCM-Contractor for capacity extensions to Butadiene production unit | + | #* Client: OMV AG |
| − | Client: OMV AG | + | #* Location: Schwechat / Austria |
| − | Location: Schwechat / Austria | + | #* Scope of work: |
| − | Scope of work: | + | #** Project management, Basic engineering, Detailed engineering, Procurement, Site and construction supervision, Commissioning assistance, |
| − | Project management | + | #* Commissioning: 2014 |
| − | Basic engineering | + | # [[Schwedt Refinery]] |
| − | Detailed engineering | + | #* revamp vacuum plant |
| − | Procurement | + | #* Exchange of the vacuum column of the vacuum plant based on the modern deep-cut process |
| − | Site and construction supervision | + | #* Client: PCK Raffinerie GmbH Schwedt |
| − | Commissioning assistance | + | #* Location: Schwedt / Germany |
| − | Commissioning: 2014 | + | #* Scope of work: Basic engineering, Detailed engineering, Procurement, Construction and installation supervision, Commissioning support |
| − | revamp vacuum plant | + | #* Commissioning: 2013 |
| − | + | # [[Hamburg Ölwerke Schindler Refinery]] | |
| − | Exchange of the vacuum column of the vacuum plant based on the modern deep-cut process | + | #* propane deasphalting plant (pda) |
| − | Client: PCK Raffinerie GmbH Schwedt | + | #* The new PDA plant is to obtain deasphalted oil from vacuum residue by propane extraction. |
| − | Location: Schwedt / Germany | + | #* Client: H&R Ölwerke Schindler GmbH |
| − | Scope of work: | + | #* Location: Hamburg / Germany |
| − | Basic engineering | + | #* Scope of work: Basic engineering, Detailed engineering, Procurement, Construction supervision, Commissioning |
| − | Detailed engineering | + | #* Commissioning: 2011 |
| − | Procurement | + | # [[Schwechat Refinery]] |
| − | Construction and installation supervision | + | #* crude oil distillation plant 4 schwechat |
| − | Commissioning support | + | #* EPCM-Contractor for modernizing the crude oil distillation plant 4 (RD4) in Schwechat including the modernization of the lower circulation return lines of the distillation plant |
| − | Commissioning: 2013 | + | #* Client: OMV |
| − | propane deasphalting plant (pda) | + | #* Location: Schwechat / Austria |
| − | + | #* Scope of work: Detailed engineering, Procurement and expediting, Construction and installation supervision, Commissioning, | |
| − | The new PDA plant is to obtain deasphalted oil from vacuum residue by propane extraction. | + | #* Commissioning: 2010 |
| − | Client: H&R Ölwerke Schindler GmbH | + | # [[Schwedt Refinery]] |
| − | Location: Hamburg / Germany | + | #* revamp crude oil distillation plant top1 |
| − | Scope of work: | + | #* Replacement of the main column for improvement of MD recovery and for production of a jet fuel component; replacement of column with a 1350t crane and assembly of column parts on site |
| − | Basic engineering | + | #* Client: PCK Raffinerie Schwedt |
| − | Detailed engineering | + | #* Location: Schwedt / Germany |
| − | Procurement | + | #* Scope of work: Detailed engineering, Construction and installation supervision, Procurement, Expediting |
| − | Construction supervision | + | #* Commissioning: 2010 |
| − | Commissioning | + | # [[Schwedt Refinery]] |
| − | Commissioning: 2011 | + | #* revamp fcc gas concentration plant |
| − | crude oil distillation plant 4 schwechat | + | #* Revamp of the stripping column with further peripheral equipment to improve the propene recovery process |
| − | + | #* Client: PCK Raffinerie Schwedt | |
| − | EPCM-Contractor for modernizing the crude oil distillation plant 4 (RD4) in Schwechat including the modernization of the lower circulation return lines of the distillation plant | + | #* Location: Schwedt / Germany |
| − | Client: OMV | + | #* Scope of work: Basic engineering, Detailed engineering, Procurement and expediting, Construction and installation supervision, Commissioning |
| − | Location: Schwechat / Austria | + | #* Commissioning: 2010 |
| − | Scope of work: | + | # [[Schwechat Refinery]] |
| − | Detailed engineering | + | #* revamp of hds plant |
| − | Procurement and expediting | + | #* Complete revamp of the desulfurization plant HDS-1 in Schwechat to reduce the sulfur production to less than 10ppm and triple the capacity from 1000 t/d to 3500 t/d by EDL |
| − | Construction and installation supervision | + | #* Client: OMV |
| − | Commissioning | + | #* Location: Schwechat / Austria |
| − | Commissioning: 2010 | + | #* Scope of work: Project management, Detailed engineering, Procurement, Construction supervision, Commissioning |
| − | revamp crude oil distillation plant top1 | + | #* Commissioning: 2008 |
| − | + | # Puralube Zeitz Refinery | |
| − | Replacement of the main column for improvement of MD recovery and for production of a jet fuel component; replacement of column with a 1350t crane and assembly of column parts on site | + | #* used oil re- refining plant |
| − | Client: PCK Raffinerie Schwedt | + | #* Planning and erection of a new used oil re-refining plant (Hylube2) based on UOP technology |
| − | Location: Schwedt / Germany | + | #* Client: Puralube Raffinerie GmbH |
| − | Scope of work: | + | #* Location: Zeitz, Germany |
| − | Detailed engineering | + | #* Scope of work: Basic engineering, Detailed engineering, Procurement support, Commissioning support |
| − | Construction and installation supervision | + | #* Commissioning: 2008 |
| − | Procurement | + | # [[Schwedt Refinery]] |
| − | Expediting | + | #* fcc-overcracking-plant |
| − | Commissioning: 2010 | + | #* FCC overcracking plant with C3 splitter process stage as the core part of the plant (diameter 5.2 m, total height 84 m) to produce propylene in polymer grade quality |
| − | revamp fcc gas concentration plant | + | #* Client: PCK Raffinerie GmbH, Schwedt |
| − | + | #* Location: Schwedt, Germany | |
| − | Revamp of the stripping column with further peripheral equipment to improve the propene recovery process | + | #* Scope of work: Detailed engineering, Procurement, Construction supervision |
| − | Client: PCK Raffinerie | + | #* Commissioning: 2007 |
| − | Location: Schwedt / Germany | + | # [[Burghausen Refinery]] |
| − | Scope of work: | + | #* Debottlenecking of refinery gas plant |
| − | Basic engineering | + | #* Client: OMV Deutschland GmbH |
| − | Detailed engineering | + | #* Location: Burghausen, Germany |
| − | Procurement and expediting | + | #* Scope of work: Detailed engineering, Procurement, Construction supervision, Site management |
| − | Construction and installation supervision | + | #* Commissioning: 2007 |
| − | Commissioning | + | # [[Schwedt Refinery]] |
| − | Commissioning: 2010 | + | #* revamp hf alkylation |
| − | revamp of hds plant | + | #* Revamp of existing HF alkylation |
| − | + | #* Client: PCK Raffinerie GmbH, Schwedt | |
| − | Complete revamp of the desulfurization plant HDS-1 in Schwechat to reduce the sulfur production to less than 10ppm and triple the capacity from 1000 t/d to 3500 t/d by EDL | + | #* Location: Schwedt, Germany |
| − | Client: OMV | + | #* Scope of work: Basic engineering (UOP Schedule A), Detailed engineering, Procurement, Construction supervision |
| − | Location: Schwechat | + | #* Commissioning: 2007 |
| − | Scope of work: | + | # [[Buna SOW Leuna Refinery]] |
| − | Project management | + | #* ok 95 - transfer line |
| − | Detailed engineering | + | #* Transfer line OK 95 (with/without ETBE) |
| − | Procurement | + | #* Client: TOTAL Raffinerie Mitteldeutschland GmbH |
| − | Construction supervision | + | #* Location: Leuna, Germany |
| − | Commissioning | + | #* Scope of work: Detailed engineering, Procurement, Construction supervision |
| − | Commissioning: 2008 | + | #* Commissioning: 2006 |
| − | used oil re- refining plant | + | # [[Burghausen Refinery]] |
| − | + | #* Revamp of HDS-1 plant | |
| − | Planning and erection of a new used oil re-refining plant (Hylube2) based on UOP technology | + | #* Client: OMV Deutschland GmbH |
| − | Client: Puralube Raffinerie GmbH | + | #* Location: Burghausen, Germany |
| − | Location: Zeitz, Germany | + | #* Scope of work: Detailed engineering, Procurement, Construction supervision |
| − | Scope of work: | + | #* Commissioning 2006 |
| − | Basic engineering | + | # [[Bayernoil Ingolstadt Refinery]] |
| − | Detailed engineering | + | #* new refinery gas plant |
| − | Procurement support | + | #* New refinery gas plant Modification of associated existing units |
| − | Commissioning support | + | #* Client: BAYERNOIL Raffineriegesellschaft |
| − | Commissioning: 2008 | + | #* Location: Ingolstadt, Germany |
| − | + | #* Scope of work: Detailed engineering, Procurement (support), Authority engineering, Investment cost estimate, Construction supervision (piping), Acceptance tests/Tests, Start-up assistance | |
| − | fcc-overcracking-plant | + | #* Commissioning: 2005 |
| − | + | # [[Emsland Lingen Refinery]] | |
| − | FCC overcracking plant with C3 splitter process stage as the core part of the plant (diameter 5.2 m, total height 84 m) to produce propylene in polymer grade quality | + | #* revamp of coking plant |
| − | Client: PCK Raffinerie GmbH, Schwedt | + | #* Project: Revamp of coking plant with capacity increase |
| − | Location: Schwedt, Germany | + | #* Client: BP Erdöl-Raffinerie-Emsland |
| − | Scope of work: | + | #* Location: Lingen, Germany |
| − | Detailed engineering | + | #* Scope of work: Detailed engineering, Procurement, Construction supervision |
| − | Procurement | + | #* Commissioning: 2004 |
| − | Construction supervision | + | # [[Schwedt Refinery]] |
| − | Commissioning: 2007 | + | #* Replacement of existing FCC main column by a larger (diameter of 6.2 m) and higher (height of 54 m) one |
| − | + | #* Client: Raffinerie GmbH, Schwedt | |
| − | + | #* Location: Schwedt, Germany | |
| − | + | #* Scope of work: Basic engineering, Detailed engineering, Procurement, Construction supervision, Acceptance tests/Tests, Start-up assistance | |
| − | Debottlenecking of refinery gas plant | + | #* Commissioning: 2004 |
| − | Client: OMV Deutschland GmbH | + | # [[Emsland Lingen Refinery]] |
| − | Location: Burghausen, Germany | + | #* Revamp of UOP reformer for isomerization of light gasoline based on UOP-Par Isom technology and a UOP reactor design package |
| − | Scope of work: | + | #* Location: Lingen, Germany |
| − | Detailed engineering | + | #* Scope of work: Extended basic engineering, Authority engineering, Investment cost estimate, Procurement support , Detailed engineering |
| − | Procurement | + | #* Commissioning: 2002 |
| − | Construction supervision | + | # [[Schwechat Refinery]] |
| − | Site management | + | #* desulphurization unit |
| − | Commissioning: 2007 | + | #* Desus 2 |
| − | revamp hf alkylation | + | #* Project: Increase of throughput of desulphurization unit DESUS 2 to 140 tph |
| − | + | #* Client: PCK Raffinerie GmbH | |
| − | Revamp of existing HF alkylation | + | #* Location: Schwedt, Germany |
| − | Client: PCK Raffinerie GmbH, Schwedt | + | #* Scope of work: Basic engineering, Detailed engineering, Procurement, Construction supervision, Start-up assistance |
| − | Location: Schwedt, Germany | + | #* Commissioning: 2002 |
| − | Scope of work: | ||
| − | Basic engineering | ||
| − | Detailed engineering | ||
| − | Procurement | ||
| − | Construction supervision | ||
| − | Commissioning: 2007 | ||
| − | ok 95 - transfer line | ||
| − | |||
| − | Transfer line OK 95 (with/without ETBE) | ||
| − | Client: TOTAL Raffinerie Mitteldeutschland GmbH | ||
| − | Location: Leuna, Germany | ||
| − | Scope of work: | ||
| − | Detailed engineering | ||
| − | Procurement | ||
| − | Construction supervision | ||
| − | Commissioning: 2006 | ||
| − | |||
| − | |||
| − | Revamp of HDS-1 plant | ||
| − | Client: OMV Deutschland GmbH | ||
| − | Location: Burghausen, Germany | ||
| − | Scope of work: | ||
| − | Detailed engineering | ||
| − | Procurement | ||
| − | Construction supervision | ||
| − | Commissioning 2006 | ||
| − | new refinery gas plant | ||
| − | |||
| − | New refinery gas plant Modification of associated existing units | ||
| − | Client: BAYERNOIL Raffineriegesellschaft | ||
| − | |||
| − | Scope of work: | ||
| − | Detailed engineering | ||
| − | Procurement (support) | ||
| − | Authority engineering | ||
| − | Investment cost estimate | ||
| − | Construction supervision (piping) | ||
| − | Acceptance tests/Tests | ||
| − | Start-up assistance | ||
| − | Commissioning: 2005 | ||
| − | |||
| − | revamp of coking plant | ||
| − | Project: Revamp of coking plant with capacity increase | ||
| − | Client: BP Erdöl-Raffinerie-Emsland | ||
| − | Location: Lingen, Germany | ||
| − | Scope of work: | ||
| − | Detailed engineering | ||
| − | Procurement | ||
| − | Construction supervision | ||
| − | Commissioning: 2004 | ||
| − | |||
| − | |||
| − | Replacement of existing FCC main column by a larger (diameter of 6.2 m) and | ||
| − | Client: Raffinerie GmbH, Schwedt | ||
| − | Location: Schwedt, Germany | ||
| − | Scope of work: | ||
| − | Basic engineering | ||
| − | Detailed engineering | ||
| − | Procurement | ||
| − | Construction supervision | ||
| − | Acceptance tests/Tests | ||
| − | Start-up assistance | ||
| − | Commissioning: 2004 | ||
| − | |||
| − | |||
| − | Revamp of UOP reformer for isomerization of light gasoline based on UOP-Par Isom technology and a UOP reactor design package | ||
| − | Location: Lingen, Germany | ||
| − | Scope of work: | ||
| − | Extended basic engineering | ||
| − | Authority engineering | ||
| − | Investment cost estimate | ||
| − | Procurement support | ||
| − | Detailed engineering | ||
| − | Commissioning: 2002 | ||
| − | desulphurization unit | ||
| − | Desus 2 | ||
| − | |||
| − | Project: Increase of throughput of desulphurization unit DESUS 2 to 140 tph | ||
| − | Client: PCK Raffinerie GmbH | ||
| − | Location: Schwedt, Germany | ||
| − | Scope of work: | ||
| − | Basic engineering | ||
| − | Detailed engineering | ||
| − | Procurement | ||
| − | Construction supervision | ||
| − | Start-up assistance | ||
| − | Commissioning: 2002 | ||
Latest revision as of 11:29, 20 November 2023
- Schwechat Refinery
- Replacement of several plant components in the catalytic part of the FCC plant; process engineering carried out by licensor UOP, process optimization (stripper incl. reactor compensator)
- Client: OMV
- Location: Schwechat/ Austria
- Scope of work: Study and execution phase (assess, select, define, execution), Detail engineering, Procurement support, Project management, Scheduling, Construction supervision
- Commissioning: 2023
- Petrobrazi Ploiesti Refinery
- Evaluation of approx. 70 tanks including infrastructure (pumps, pipelines, foundations, etc.) at the Petrobrazi refinery. Evaluation with 3D laser scans. Shutdown, revitalization or new construction according to economical, safety-related and environmental criteria. Construction of a new 10,000 m3 storage tank for heavy reformate with an aluminum dome.
- Client: OMV Petrom SA
- Location: Petrobrazi / Romania
- Scope of work: Authority engineering, Detail engineering, Procurement, Construction management, HSE responsibility on site, Authority documentation, Commissioning
- Commissioning: 2022
- Schwechat Refinery
- Retrofitting of the existing HDS1 high-pressure desulfurization plant; replacement of the reactor, heat exchangers and connecting pipelines
- Client: OMV Refining & Marketing
- Location: Schwechat / Austria
- Scope of work: Study, FEED, Detail engineering, Construction supervision, Commissioning support
- Commissioning: 2020
- Schwedt Refinery
- Modification of the existing Arosolvan plant: replacement of N-methyl-2-pyrrolidone (NMP) by the less toxic solvent tetraethylene glycol (TTEG), minimization of energy and utilities consumption
- Client: PCK Raffinerie GmbH Schwedt
- Location: Schwedt / Germany
- Scope of work: Extended basic engineering, Detail engineering, Procurement, Construction supervision
- Commissioning: 2020
- Schwedt Refinery
- Revamp of existing crude oil distillation plant with replacement of two side strippers, pre-column and liquid gas column with associated reboilers during compound shutdown ‘Step2’
- Client: PCK Raffinerie GmbH Schwedt
- Location: Schwedt / Germany
- Scope of work: Detail engineering, Authority engineering support, Procurement, expediting, Construction supervision
- Commissioning: 2019
- GS-Caltex Yeosu Refinery
- Extension of the existing measuring, dosing and blending systems to improve plant flexibility and to double capacity.
- Client: GS Caltex Corporation
- Location: Seoul / South Korea
- Scope of work: Delivery of equipment, Construction supervision, Commissioning support
- Commissioning: 2019
- Hamburg Ölwerke Schindler Refinery
- Conversion of the propane deasphalting plant (PDA plant) engineered and installed by EDL in 2011 incl. use of solvent mixture instead of propane
- Client: H&R Ölwerke Schindler GmbH
- Location: Hamburg / Deutschland
- Scope of services: Basic engineering, Detail engineering, Authority engineering, Procurement, Construction supervision, Commissioning support
- Commissioning: 2018
- Miro Karlsruhe Refinery
- Optimization of the coker unit with replacement of two coke drums; weight per coke drum: 400 mt, height per coke drum: 35 m
- Client: Mineraloel Raffinerie Oberrhein GmbH
- Location: Karlsruhe / Germany
- Scope of services: Detail engineering, Field engineering
- Commissioning: 2018
- Schwechat Refinery
- Revamp of the FCC Unit in several projects like, optimization of the main column condensation, replacement of the main valves, dismantling of the old and installation of a new modified waste heat boiler. Finalization during TAR 2017.
- Client: OMV Refining & Marketing GmbH
- Location: Schwechat / Österreich
- Scope of work: FEED, Basic Engineering, Detail Engineering, Procurement assistance, Site and construction supervision, Scheduling support for TAR 2017, Commissioning support
- Commissioning: 2017
- Novopolotsk Refinery
- Modernization of a PDA plant in cooperation with Sulzer Chemtech (internals) and Kremsmüller (columns).
- Client: OAO Naftan
- Location: Novopolozk / Belarus
- Scope of work: Pilot tests in company owned pilot plant, Technological design, Delivery of 2 extraction columns
- Commissioning: 2016
- Schwechat Refinery
- Replacement of the HDS3 reactor in the plant for desulfurisation and denitrification of vacuum gasoil; the technical configuration of the reactor: 465°C and 80bar, 25m high and 382t
- Client: OMV Refining & Marketing GmbH
- Location: Schwechat / Austria
- Scope of work: FEED, Basic engineering, Detail engineering, Procurement, Site and construction supervision, Commissioning support
- Commissioning: 2016
- Schwechat Refinery
- Revamp of the crude oil distillation RD-4 for yield improvement and enhanced plant operation mode
- Client: OMV Refining & Marketing GmbH
- Location: Schwechat / Austria
- Scope of work: FEED, Detail engineering, Procurement, Construction supervision, Commissioning support
- Commissioning: 2016
- Schwechat Refinery
- DEA plant, yield improvement and enhanced plant operation mode, replacement of column and key equipment
- Client: OMV Refining & Marketing GmbH
- Location: Schwechat / Austria
- Scope of work: FEED, Basic engineering, Detail engineering, Procurement, Site and construction supervision, Commissioning support
- Commissioning: 2016
- Schwedt Refinery
- Revamp of the crude oil distillation unit 1 with replacement of the vacuum column and a stripper column, mounted by modules; finalized at the shut-down "kleiner 16"; the vacuum column is 71 m high and one the the biggest refinery buildings
- Client: PCK Raffinerie GmbH Schwedt
- Location: Schwedt, Germany
- Scope of work: Basic engineering, Detail engineering, Procurement, Construction supervision
- Commissioning: 2016
- Schwedt Refinery
- Replacement of the regenerator in the FCC unit; because of the heavy weight (648 t) it was delivered in three segments and was completed together with the LCO recovery project during the shutdown "kleiner 16"
- Client: PCK Raffinerie GmbH Schwedt
- Location: Schwedt, Germany
- Scope of work: Detail engineering, Procurement, Construction and mounting supervision
- Commissioning: 2016
- Buna SOW Leuna Refinery
- Reconstruction of the FCC-Reactor
- Client: TOTAL Raffinerie Mitteldeutschland GmbH
- Location: Leuna, Germany
- Scope of work: Detail engineering, Procurement, Construction and assembling supervision, Commissioning
- Commissioning: 2014
- Buna SOW Leuna Refinery
- Reconstruction of the FCC-Gas Postprocessing Unit to increase the yield composition
- Client: TOTAL Raffinerie Mitteldeutschland GmbH
- Location: Leuna, Germany
- Scope of work: Detail engineering, Procurement, Construction and assembling supervision, Commissioning
- Commissioning: 2014
- Schwedt Refinery
- Desulphurization plant - hazop findings dk2
- Revamp of medium-pressure desulphurization plant DK2 with replacement of stripping column including foundation
- Client: PCK Raffinerie GmbH Schwedt
- Location: Schwedt, Germany
- Scope of work: Basic engineering, Detail engineering, Procurement, Construction supervision
- Commissioning: 2014
- Buna SOW Leuna Refinery
- alkylation plant
- Revamp of alkylation plant to increase alkylate yield
- Client: TOTAL Raffinerie Mitteldeutschland GmbH
- Location: Leuna, Germany
- Scope of work: Detail engineering, Procurement, Construction supervision, Commissioning
- Commissioning: 2014
- Schwechat Refinery
- rd4 program
- EPCM-Contractor for modernization of the crude oil distillation plant4 (RD4), distillation plant1 (DEA1), distillation plant2 (DEA2), new residue cooling system (RSK) to increase cooling capacity at residue line
- Client: OMV AG
- Location: Schwechat / Austria
- Scope of work: Project management, Basic engineering, Detailed engineering, Procurement, Site and construction supervision, Commissioning assistance
- Commissioning: 2014
- Schwechat Refinery
- butadiene production unit
- EPCM-Contractor for capacity extensions to Butadiene production unit
- Client: OMV AG
- Location: Schwechat / Austria
- Scope of work:
- Project management, Basic engineering, Detailed engineering, Procurement, Site and construction supervision, Commissioning assistance,
- Commissioning: 2014
- Schwedt Refinery
- revamp vacuum plant
- Exchange of the vacuum column of the vacuum plant based on the modern deep-cut process
- Client: PCK Raffinerie GmbH Schwedt
- Location: Schwedt / Germany
- Scope of work: Basic engineering, Detailed engineering, Procurement, Construction and installation supervision, Commissioning support
- Commissioning: 2013
- Hamburg Ölwerke Schindler Refinery
- propane deasphalting plant (pda)
- The new PDA plant is to obtain deasphalted oil from vacuum residue by propane extraction.
- Client: H&R Ölwerke Schindler GmbH
- Location: Hamburg / Germany
- Scope of work: Basic engineering, Detailed engineering, Procurement, Construction supervision, Commissioning
- Commissioning: 2011
- Schwechat Refinery
- crude oil distillation plant 4 schwechat
- EPCM-Contractor for modernizing the crude oil distillation plant 4 (RD4) in Schwechat including the modernization of the lower circulation return lines of the distillation plant
- Client: OMV
- Location: Schwechat / Austria
- Scope of work: Detailed engineering, Procurement and expediting, Construction and installation supervision, Commissioning,
- Commissioning: 2010
- Schwedt Refinery
- revamp crude oil distillation plant top1
- Replacement of the main column for improvement of MD recovery and for production of a jet fuel component; replacement of column with a 1350t crane and assembly of column parts on site
- Client: PCK Raffinerie Schwedt
- Location: Schwedt / Germany
- Scope of work: Detailed engineering, Construction and installation supervision, Procurement, Expediting
- Commissioning: 2010
- Schwedt Refinery
- revamp fcc gas concentration plant
- Revamp of the stripping column with further peripheral equipment to improve the propene recovery process
- Client: PCK Raffinerie Schwedt
- Location: Schwedt / Germany
- Scope of work: Basic engineering, Detailed engineering, Procurement and expediting, Construction and installation supervision, Commissioning
- Commissioning: 2010
- Schwechat Refinery
- revamp of hds plant
- Complete revamp of the desulfurization plant HDS-1 in Schwechat to reduce the sulfur production to less than 10ppm and triple the capacity from 1000 t/d to 3500 t/d by EDL
- Client: OMV
- Location: Schwechat / Austria
- Scope of work: Project management, Detailed engineering, Procurement, Construction supervision, Commissioning
- Commissioning: 2008
- Puralube Zeitz Refinery
- used oil re- refining plant
- Planning and erection of a new used oil re-refining plant (Hylube2) based on UOP technology
- Client: Puralube Raffinerie GmbH
- Location: Zeitz, Germany
- Scope of work: Basic engineering, Detailed engineering, Procurement support, Commissioning support
- Commissioning: 2008
- Schwedt Refinery
- fcc-overcracking-plant
- FCC overcracking plant with C3 splitter process stage as the core part of the plant (diameter 5.2 m, total height 84 m) to produce propylene in polymer grade quality
- Client: PCK Raffinerie GmbH, Schwedt
- Location: Schwedt, Germany
- Scope of work: Detailed engineering, Procurement, Construction supervision
- Commissioning: 2007
- Burghausen Refinery
- Debottlenecking of refinery gas plant
- Client: OMV Deutschland GmbH
- Location: Burghausen, Germany
- Scope of work: Detailed engineering, Procurement, Construction supervision, Site management
- Commissioning: 2007
- Schwedt Refinery
- revamp hf alkylation
- Revamp of existing HF alkylation
- Client: PCK Raffinerie GmbH, Schwedt
- Location: Schwedt, Germany
- Scope of work: Basic engineering (UOP Schedule A), Detailed engineering, Procurement, Construction supervision
- Commissioning: 2007
- Buna SOW Leuna Refinery
- ok 95 - transfer line
- Transfer line OK 95 (with/without ETBE)
- Client: TOTAL Raffinerie Mitteldeutschland GmbH
- Location: Leuna, Germany
- Scope of work: Detailed engineering, Procurement, Construction supervision
- Commissioning: 2006
- Burghausen Refinery
- Revamp of HDS-1 plant
- Client: OMV Deutschland GmbH
- Location: Burghausen, Germany
- Scope of work: Detailed engineering, Procurement, Construction supervision
- Commissioning 2006
- Bayernoil Ingolstadt Refinery
- new refinery gas plant
- New refinery gas plant Modification of associated existing units
- Client: BAYERNOIL Raffineriegesellschaft
- Location: Ingolstadt, Germany
- Scope of work: Detailed engineering, Procurement (support), Authority engineering, Investment cost estimate, Construction supervision (piping), Acceptance tests/Tests, Start-up assistance
- Commissioning: 2005
- Emsland Lingen Refinery
- revamp of coking plant
- Project: Revamp of coking plant with capacity increase
- Client: BP Erdöl-Raffinerie-Emsland
- Location: Lingen, Germany
- Scope of work: Detailed engineering, Procurement, Construction supervision
- Commissioning: 2004
- Schwedt Refinery
- Replacement of existing FCC main column by a larger (diameter of 6.2 m) and higher (height of 54 m) one
- Client: Raffinerie GmbH, Schwedt
- Location: Schwedt, Germany
- Scope of work: Basic engineering, Detailed engineering, Procurement, Construction supervision, Acceptance tests/Tests, Start-up assistance
- Commissioning: 2004
- Emsland Lingen Refinery
- Revamp of UOP reformer for isomerization of light gasoline based on UOP-Par Isom technology and a UOP reactor design package
- Location: Lingen, Germany
- Scope of work: Extended basic engineering, Authority engineering, Investment cost estimate, Procurement support , Detailed engineering
- Commissioning: 2002
- Schwechat Refinery
- desulphurization unit
- Desus 2
- Project: Increase of throughput of desulphurization unit DESUS 2 to 140 tph
- Client: PCK Raffinerie GmbH
- Location: Schwedt, Germany
- Scope of work: Basic engineering, Detailed engineering, Procurement, Construction supervision, Start-up assistance
- Commissioning: 2002