Difference between revisions of "Poerner Refinery References"

From A Barrel Full
Jump to navigation Jump to search
Line 57: Line 57:
 
#* Commissioning: 2010
 
#* Commissioning: 2010
 
# [[Schwedt Refinery]]
 
# [[Schwedt Refinery]]
revamp fcc gas concentration plant
+
#* revamp fcc gas concentration plant
 
#* Revamp of the stripping column with further peripheral equipment to improve the propene recovery process
 
#* Revamp of the stripping column with further peripheral equipment to improve the propene recovery process
 
#* Client: PCK Raffinerie Schwedt
 
#* Client: PCK Raffinerie Schwedt
Line 90: Line 90:
 
#* Scope of work: Detailed engineering, Procurement, Construction supervision, Site management
 
#* Scope of work: Detailed engineering, Procurement, Construction supervision, Site management
 
#* Commissioning: 2007
 
#* Commissioning: 2007
 
+
# [[Schwedt Refinery]]
 
+
#* revamp hf alkylation
revamp hf alkylation
+
#* Revamp of existing HF alkylation
 
+
#* Client: PCK Raffinerie GmbH, Schwedt
Revamp of existing HF alkylation
+
#* Location: Schwedt, Germany
Client: PCK Raffinerie GmbH, Schwedt
+
#* Scope of work: Basic engineering (UOP Schedule A), Detailed engineering, Procurement, Construction supervision
Location: Schwedt, Germany
+
#* Commissioning: 2007
Scope of work:
+
# [[Buna SOW Leuna Refinery]]
Basic engineering (UOP Schedule A)
+
#* ok 95 - transfer line
Detailed engineering
+
#* Transfer line OK 95 (with/without ETBE)
Procurement
+
#* Client: TOTAL Raffinerie Mitteldeutschland GmbH
Construction supervision
+
#* Location: Leuna, Germany
Commissioning: 2007
+
#* Scope of work: Detailed engineering, Procurement, Construction supervision
ok 95 - transfer line
+
#* Commissioning: 2006
 
+
# [[Burghausen Refinery]]
Transfer line OK 95 (with/without ETBE)
+
#* Revamp of HDS-1 plant
Client: TOTAL Raffinerie Mitteldeutschland GmbH
+
#* Client: OMV Deutschland GmbH
Location: Leuna, Germany
+
#* Location: Burghausen, Germany
Scope of work:
+
#* Scope of work: Detailed engineering, Procurement, Construction supervision
Detailed engineering
+
#* Commissioning 2006
Procurement
+
# [[Bayernoil Ingolstadt Refinery]]
Construction supervision
+
#* new refinery gas plant
Commissioning: 2006
+
#* New refinery gas plant Modification of associated existing units
revamp of hds-1 plant
+
#* Client: BAYERNOIL  Raffineriegesellschaft
 
+
#* Location: Ingolstadt, Germany
Revamp of HDS-1 plant
+
#* Scope of work: Detailed engineering, Procurement (support), Authority engineering, Investment cost estimate, Construction supervision (piping), Acceptance tests/Tests, Start-up assistance
Client: OMV Deutschland GmbH
+
#* Commissioning: 2005
Location: Burghausen, Germany
+
# [[Emsland Lingen Refinery]]
Scope of work:
+
#* revamp of coking plant
Detailed engineering
+
#* Project: Revamp of coking plant with capacity increase
Procurement
+
#* Client: BP Erdöl-Raffinerie-Emsland
Construction supervision
+
#* Location: Lingen, Germany
Commissioning 2006
+
#* Scope of work: Detailed engineering, Procurement, Construction supervision
new refinery gas plant
+
#* Commissioning: 2004
 
+
# [[Schwedt Refinery]]
New refinery gas plant Modification of associated existing units
+
#* Replacement of existing FCC main column by a larger (diameter of 6.2 m) and higher (height of 54 m) one  
Client: BAYERNOIL  Raffineriegesellschaft
+
#* Client: Raffinerie GmbH, Schwedt
LocationIngolstadt, Germany
+
#* Location: Schwedt, Germany
Scope of work:
+
#* Scope of work: Basic engineering, Detailed engineering, Procurement, Construction supervision, Acceptance tests/Tests, Start-up assistance
Detailed engineering
+
#* Commissioning: 2004
Procurement (support)
 
Authority engineering
 
Investment cost estimate
 
Construction supervision (piping)
 
Acceptance tests/Tests
 
Start-up assistance
 
Commissioning: 2005
 
 
revamp of coking plant
 
Project: Revamp of coking plant with capacity increase
 
Client: BP Erdöl-Raffinerie-Emsland
 
Location: Lingen, Germany
 
Scope of work:
 
Detailed engineering
 
Procurement
 
Construction supervision
 
Commissioning: 2004
 
fcc column
 
 
 
Replacement of existing FCC main column by a larger (diameter of 6.2 m) and higher (height of 54 m) one  
 
Client: Raffinerie GmbH, Schwedt
 
Location: Schwedt, Germany
 
Scope of work:
 
Basic engineering
 
Detailed engineering
 
Procurement
 
Construction supervision
 
Acceptance tests/Tests
 
Start-up assistance
 
Commissioning: 2004
 
revamp of light gasoline isomerization
 
 
# [[Emsland Lingen Refinery]]
 
# [[Emsland Lingen Refinery]]
 
#* Revamp of UOP reformer for isomerization of light gasoline based on UOP-Par Isom technology and a UOP reactor design package
 
#* Revamp of UOP reformer for isomerization of light gasoline based on UOP-Par Isom technology and a UOP reactor design package

Revision as of 07:47, 20 November 2023

  1. Schwedt Refinery
    • Desulphurization plant - hazop findings dk2
    • Revamp of medium-pressure desulphurization plant DK2 with replacement of stripping column including foundation
    • Client: PCK Raffinerie GmbH Schwedt
    • Location: Schwedt, Germany
    • Scope of work: Basic engineering, Detail engineering, Procurement, Construction supervision
    • Commissioning: 2014
  2. Buna SOW Leuna Refinery
    • alkylation plant
    • Revamp of alkylation plant to increase alkylate yield
    • Client: TOTAL Raffinerie Mitteldeutschland GmbH
    • Location: Leuna, Germany
    • Scope of work: Detail engineering, Procurement, Construction supervision, Commissioning
    • Commissioning: 2014
  3. Schwechat Refinery
    • rd4 program
    • EPCM-Contractor for modernization of the crude oil distillation plant4 (RD4), distillation plant1 (DEA1), distillation plant2 (DEA2), new residue cooling system (RSK) to increase cooling capacity at residue line
    • Client: OMV AG
    • Location: Schwechat / Austria
    • Scope of work: Project management, Basic engineering, Detailed engineering, Procurement, Site and construction supervision, Commissioning assistance
    • Commissioning: 2014
  4. Schwechat Refinery
    • butadiene production unit
    • EPCM-Contractor for capacity extensions to Butadiene production unit
    • Client: OMV AG
    • Location: Schwechat / Austria
    • Scope of work:
      • Project management, Basic engineering, Detailed engineering, Procurement, Site and construction supervision, Commissioning assistance,
    • Commissioning: 2014
  5. Schwedt Refinery
    • revamp vacuum plant
    • Exchange of the vacuum column of the vacuum plant based on the modern deep-cut process
    • Client: PCK Raffinerie GmbH Schwedt
    • Location: Schwedt / Germany
    • Scope of work: Basic engineering, Detailed engineering, Procurement, Construction and installation supervision, Commissioning support
    • Commissioning: 2013
  6. Hamburg Ölwerke Schindler Refinery
    • propane deasphalting plant (pda)
    • The new PDA plant is to obtain deasphalted oil from vacuum residue by propane extraction.
    • Client: H&R Ölwerke Schindler GmbH
    • Location: Hamburg / Germany
    • Scope of work: Basic engineering, Detailed engineering, Procurement, Construction supervision, Commissioning
    • Commissioning: 2011
  7. Schwechat Refinery
    • crude oil distillation plant 4 schwechat
    • EPCM-Contractor for modernizing the crude oil distillation plant 4 (RD4) in Schwechat including the modernization of the lower circulation return lines of the distillation plant
    • Client: OMV
    • Location: Schwechat / Austria
    • Scope of work: Detailed engineering, Procurement and expediting, Construction and installation supervision, Commissioning,
    • Commissioning: 2010
  8. Schwedt Refinery
    • revamp crude oil distillation plant top1
    • Replacement of the main column for improvement of MD recovery and for production of a jet fuel component; replacement of column with a 1350t crane and assembly of column parts on site
    • Client: PCK Raffinerie Schwedt
    • Location: Schwedt / Germany
    • Scope of work: Detailed engineering, Construction and installation supervision, Procurement, Expediting
    • Commissioning: 2010
  9. Schwedt Refinery
    • revamp fcc gas concentration plant
    • Revamp of the stripping column with further peripheral equipment to improve the propene recovery process
    • Client: PCK Raffinerie Schwedt
    • Location: Schwedt / Germany
    • Scope of work: Basic engineering, Detailed engineering, Procurement and expediting, Construction and installation supervision, Commissioning
    • Commissioning: 2010
  10. Schwechat Refinery
    • revamp of hds plant
    • Complete revamp of the desulfurization plant HDS-1 in Schwechat to reduce the sulfur production to less than 10ppm and triple the capacity from 1000 t/d to 3500 t/d by EDL
    • Client: OMV
    • Location: Schwechat / Austria
    • Scope of work: Project management, Detailed engineering, Procurement, Construction supervision, Commissioning
    • Commissioning: 2008
  11. Puralube Zeitz Refinery
    • used oil re- refining plant
    • Planning and erection of a new used oil re-refining plant (Hylube2) based on UOP technology
    • Client: Puralube Raffinerie GmbH
    • Location: Zeitz, Germany
    • Scope of work: Basic engineering, Detailed engineering, Procurement support, Commissioning support
    • Commissioning: 2008
  12. Schwedt Refinery
    • fcc-overcracking-plant
    • FCC overcracking plant with C3 splitter process stage as the core part of the plant (diameter 5.2 m, total height 84 m) to produce propylene in polymer grade quality
    • Client: PCK Raffinerie GmbH, Schwedt
    • Location: Schwedt, Germany
    • Scope of work: Detailed engineering, Procurement, Construction supervision
    • Commissioning: 2007
  13. Burghausen Refinery
    • Debottlenecking of refinery gas plant
    • Client: OMV Deutschland GmbH
    • Location: Burghausen, Germany
    • Scope of work: Detailed engineering, Procurement, Construction supervision, Site management
    • Commissioning: 2007
  14. Schwedt Refinery
    • revamp hf alkylation
    • Revamp of existing HF alkylation
    • Client: PCK Raffinerie GmbH, Schwedt
    • Location: Schwedt, Germany
    • Scope of work: Basic engineering (UOP Schedule A), Detailed engineering, Procurement, Construction supervision
    • Commissioning: 2007
  15. Buna SOW Leuna Refinery
    • ok 95 - transfer line
    • Transfer line OK 95 (with/without ETBE)
    • Client: TOTAL Raffinerie Mitteldeutschland GmbH
    • Location: Leuna, Germany
    • Scope of work: Detailed engineering, Procurement, Construction supervision
    • Commissioning: 2006
  16. Burghausen Refinery
    • Revamp of HDS-1 plant
    • Client: OMV Deutschland GmbH
    • Location: Burghausen, Germany
    • Scope of work: Detailed engineering, Procurement, Construction supervision
    • Commissioning 2006
  17. Bayernoil Ingolstadt Refinery
    • new refinery gas plant
    • New refinery gas plant Modification of associated existing units
    • Client: BAYERNOIL Raffineriegesellschaft
    • Location: Ingolstadt, Germany
    • Scope of work: Detailed engineering, Procurement (support), Authority engineering, Investment cost estimate, Construction supervision (piping), Acceptance tests/Tests, Start-up assistance
    • Commissioning: 2005
  18. Emsland Lingen Refinery
    • revamp of coking plant
    • Project: Revamp of coking plant with capacity increase
    • Client: BP Erdöl-Raffinerie-Emsland
    • Location: Lingen, Germany
    • Scope of work: Detailed engineering, Procurement, Construction supervision
    • Commissioning: 2004
  19. Schwedt Refinery
    • Replacement of existing FCC main column by a larger (diameter of 6.2 m) and higher (height of 54 m) one
    • Client: Raffinerie GmbH, Schwedt
    • Location: Schwedt, Germany
    • Scope of work: Basic engineering, Detailed engineering, Procurement, Construction supervision, Acceptance tests/Tests, Start-up assistance
    • Commissioning: 2004
  20. Emsland Lingen Refinery
    • Revamp of UOP reformer for isomerization of light gasoline based on UOP-Par Isom technology and a UOP reactor design package
    • Location: Lingen, Germany
    • Scope of work: Extended basic engineering, Authority engineering, Investment cost estimate, Procurement support , Detailed engineering
    • Commissioning: 2002
  21. Schwechat Refinery
    • desulphurization unit
    • Desus 2
    • Project: Increase of throughput of desulphurization unit DESUS 2 to 140 tph
    • Client: PCK Raffinerie GmbH
    • Location: Schwedt, Germany
    • Scope of work: Basic engineering, Detailed engineering, Procurement, Construction supervision, Start-up assistance
    • Commissioning: 2002