Difference between revisions of "Poerner Refinery References"
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) |
||
| Line 75: | Line 75: | ||
#* Client: Puralube Raffinerie GmbH | #* Client: Puralube Raffinerie GmbH | ||
#* Location: Zeitz, Germany | #* Location: Zeitz, Germany | ||
| − | Scope of work: | + | #* Scope of work: Basic engineering, Detailed engineering, Procurement support, Commissioning support |
| − | Basic engineering | ||
| − | Detailed engineering | ||
| − | Procurement support | ||
| − | Commissioning support | ||
#* Commissioning: 2008 | #* Commissioning: 2008 | ||
| − | + | # [[Schwedt Refinery]] | |
| − | fcc-overcracking-plant | + | #* fcc-overcracking-plant |
| + | #* FCC overcracking plant with C3 splitter process stage as the core part of the plant (diameter 5.2 m, total height 84 m) to produce propylene in polymer grade quality | ||
| + | #* Client: PCK Raffinerie GmbH, Schwedt | ||
| + | #* Location: Schwedt, Germany | ||
| + | #* Scope of work: Detailed engineering, Procurement, Construction supervision | ||
| + | #* Commissioning: 2007 | ||
| + | # [[Burghausen Refinery]] | ||
| + | #* Debottlenecking of refinery gas plant | ||
| + | #* Client: OMV Deutschland GmbH | ||
| + | #* Location: Burghausen, Germany | ||
| + | #* Scope of work: Detailed engineering, Procurement, Construction supervision, Site management | ||
| + | #* Commissioning: 2007 | ||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
revamp hf alkylation | revamp hf alkylation | ||
| Line 110: | Line 98: | ||
Location: Schwedt, Germany | Location: Schwedt, Germany | ||
Scope of work: | Scope of work: | ||
| − | Basic engineering | + | Basic engineering (UOP Schedule A) |
Detailed engineering | Detailed engineering | ||
Procurement | Procurement | ||
Revision as of 07:38, 20 November 2023
- Schwedt Refinery
- Desulphurization plant - hazop findings dk2
- Revamp of medium-pressure desulphurization plant DK2 with replacement of stripping column including foundation
- Client: PCK Raffinerie GmbH Schwedt
- Location: Schwedt, Germany
- Scope of work: Basic engineering, Detail engineering, Procurement, Construction supervision
- Commissioning: 2014
- Buna SOW Leuna Refinery
- alkylation plant
- Revamp of alkylation plant to increase alkylate yield
- Client: TOTAL Raffinerie Mitteldeutschland GmbH
- Location: Leuna, Germany
- Scope of work: Detail engineering, Procurement, Construction supervision, Commissioning
- Commissioning: 2014
- Schwechat Refinery
- rd4 program
- EPCM-Contractor for modernization of the crude oil distillation plant4 (RD4), distillation plant1 (DEA1), distillation plant2 (DEA2), new residue cooling system (RSK) to increase cooling capacity at residue line
- Client: OMV AG
- Location: Schwechat / Austria
- Scope of work: Project management, Basic engineering, Detailed engineering, Procurement, Site and construction supervision, Commissioning assistance
- Commissioning: 2014
- Schwechat Refinery
- butadiene production unit
- EPCM-Contractor for capacity extensions to Butadiene production unit
- Client: OMV AG
- Location: Schwechat / Austria
- Scope of work:
- Project management, Basic engineering, Detailed engineering, Procurement, Site and construction supervision, Commissioning assistance,
- Commissioning: 2014
- Schwedt Refinery
- revamp vacuum plant
- Exchange of the vacuum column of the vacuum plant based on the modern deep-cut process
- Client: PCK Raffinerie GmbH Schwedt
- Location: Schwedt / Germany
- Scope of work: Basic engineering, Detailed engineering, Procurement, Construction and installation supervision, Commissioning support
- Commissioning: 2013
- Hamburg Ölwerke Schindler Refinery
- propane deasphalting plant (pda)
- The new PDA plant is to obtain deasphalted oil from vacuum residue by propane extraction.
- Client: H&R Ölwerke Schindler GmbH
- Location: Hamburg / Germany
- Scope of work: Basic engineering, Detailed engineering, Procurement, Construction supervision, Commissioning
- Commissioning: 2011
- Schwechat Refinery
- crude oil distillation plant 4 schwechat
- EPCM-Contractor for modernizing the crude oil distillation plant 4 (RD4) in Schwechat including the modernization of the lower circulation return lines of the distillation plant
- Client: OMV
- Location: Schwechat / Austria
- Scope of work: Detailed engineering, Procurement and expediting, Construction and installation supervision, Commissioning,
- Commissioning: 2010
- Schwedt Refinery
- revamp crude oil distillation plant top1
- Replacement of the main column for improvement of MD recovery and for production of a jet fuel component; replacement of column with a 1350t crane and assembly of column parts on site
- Client: PCK Raffinerie Schwedt
- Location: Schwedt / Germany
- Scope of work: Detailed engineering, Construction and installation supervision, Procurement, Expediting
- Commissioning: 2010
- Schwedt Refinery
revamp fcc gas concentration plant
- Revamp of the stripping column with further peripheral equipment to improve the propene recovery process
- Client: PCK Raffinerie Schwedt
- Location: Schwedt / Germany
- Scope of work: Basic engineering, Detailed engineering, Procurement and expediting, Construction and installation supervision, Commissioning
- Commissioning: 2010
- Schwechat Refinery
- revamp of hds plant
- Complete revamp of the desulfurization plant HDS-1 in Schwechat to reduce the sulfur production to less than 10ppm and triple the capacity from 1000 t/d to 3500 t/d by EDL
- Client: OMV
- Location: Schwechat / Austria
- Scope of work: Project management, Detailed engineering, Procurement, Construction supervision, Commissioning
- Commissioning: 2008
- Puralube Zeitz Refinery
- used oil re- refining plant
- Planning and erection of a new used oil re-refining plant (Hylube2) based on UOP technology
- Client: Puralube Raffinerie GmbH
- Location: Zeitz, Germany
- Scope of work: Basic engineering, Detailed engineering, Procurement support, Commissioning support
- Commissioning: 2008
- Schwedt Refinery
- fcc-overcracking-plant
- FCC overcracking plant with C3 splitter process stage as the core part of the plant (diameter 5.2 m, total height 84 m) to produce propylene in polymer grade quality
- Client: PCK Raffinerie GmbH, Schwedt
- Location: Schwedt, Germany
- Scope of work: Detailed engineering, Procurement, Construction supervision
- Commissioning: 2007
- Burghausen Refinery
- Debottlenecking of refinery gas plant
- Client: OMV Deutschland GmbH
- Location: Burghausen, Germany
- Scope of work: Detailed engineering, Procurement, Construction supervision, Site management
- Commissioning: 2007
revamp hf alkylation
Revamp of existing HF alkylation Client: PCK Raffinerie GmbH, Schwedt Location: Schwedt, Germany Scope of work: Basic engineering (UOP Schedule A) Detailed engineering Procurement Construction supervision Commissioning: 2007 ok 95 - transfer line
Transfer line OK 95 (with/without ETBE) Client: TOTAL Raffinerie Mitteldeutschland GmbH Location: Leuna, Germany Scope of work: Detailed engineering Procurement Construction supervision Commissioning: 2006 revamp of hds-1 plant
Revamp of HDS-1 plant Client: OMV Deutschland GmbH Location: Burghausen, Germany Scope of work: Detailed engineering Procurement Construction supervision Commissioning 2006 new refinery gas plant
New refinery gas plant Modification of associated existing units Client: BAYERNOIL Raffineriegesellschaft LocationIngolstadt, Germany Scope of work: Detailed engineering Procurement (support) Authority engineering Investment cost estimate Construction supervision (piping) Acceptance tests/Tests Start-up assistance Commissioning: 2005
revamp of coking plant Project: Revamp of coking plant with capacity increase Client: BP Erdöl-Raffinerie-Emsland Location: Lingen, Germany Scope of work: Detailed engineering Procurement Construction supervision Commissioning: 2004 fcc column
Replacement of existing FCC main column by a larger (diameter of 6.2 m) and higher (height of 54 m) one Client: Raffinerie GmbH, Schwedt Location: Schwedt, Germany Scope of work: Basic engineering Detailed engineering Procurement Construction supervision Acceptance tests/Tests Start-up assistance Commissioning: 2004 revamp of light gasoline isomerization
- Emsland Lingen Refinery
- Revamp of UOP reformer for isomerization of light gasoline based on UOP-Par Isom technology and a UOP reactor design package
- Location: Lingen, Germany
- Scope of work: Extended basic engineering, Authority engineering, Investment cost estimate, Procurement support , Detailed engineering
- Commissioning: 2002
- Schwechat Refinery
- desulphurization unit
- Desus 2
- Project: Increase of throughput of desulphurization unit DESUS 2 to 140 tph
- Client: PCK Raffinerie GmbH
- Location: Schwedt, Germany
- Scope of work: Basic engineering, Detailed engineering, Procurement, Construction supervision, Start-up assistance
- Commissioning: 2002