(Created page with "Summary Information * Operator: ADMA OPCO * Country: UAE - Abu Dhabi * Location: 131 km northwest of Abu Dhabi * Production start: * Partners: * Type: Oil / Gas * Estimated R...")
 
 
Line 40: Line 40:
  
 
+++ Links
 
+++ Links
 +
# [[Shenzhen Chiwan Sembawang Engineering Platform References]]
 
# [http://killajoules.wikidot.com/blog:2153 AMEC awarded PMC services contract for ADMA OPCO’s multi-billion dollar Nasr and Umm Lulu fields, UAE]
 
# [http://killajoules.wikidot.com/blog:2153 AMEC awarded PMC services contract for ADMA OPCO’s multi-billion dollar Nasr and Umm Lulu fields, UAE]
 
# [http://killajoules.wikidot.com/blog:1441 Fluor Wins Offshore FEED Contract for Nasr Field in Abu Dhabi]
 
# [http://killajoules.wikidot.com/blog:1441 Fluor Wins Offshore FEED Contract for Nasr Field in Abu Dhabi]

Latest revision as of 08:35, 16 November 2023

Summary Information

  • Operator: ADMA OPCO
  • Country: UAE - Abu Dhabi
  • Location: 131 km northwest of Abu Dhabi
  • Production start:
  • Partners:
  • Type: Oil / Gas
  • Estimated Reserves:
  • Production Volume: 22,000 bpd

+++ Description

  • The Nasr Full Field Development Project includes seven wellhead towers, super complex facilities including gas processing and oil separation production facilities, utilities platform, living quarters, infield subsea pipelines and an export pipeline to Das Island
  • Phase II is designed to increase production to 65,000 bpd
  • It includes the addition of a gas treatment platform, a separation platform nad an accommodation platform as well as modifications to existing structures

+++ Contractors

++++ Phase II

  • **Fluor:** front-end engineering and design (FEED)
  • **AMEC:** Project Management Consultancy (PMC) services contract

++++ Phase II

  • **Technip:** Project management consultancy (PMC) services
  • **KBR:** Engineering design and support services
  • **HHI:** Engineering, procurement, construction, installation and commissioning work
    • Gas treatment platform, a separation platform, an accommodation platform;
    • laying 144 km subsea power and 55 km infield cables;
    • modifying an existing manifold tower and two wellhead towers

+++ History

  • 2011 - Fluor Wins Offshore FEED Contract
  • 2012 - AMEC awarded PMC services contract
  • 2014 - Project Management Consultancy services for the Nasr Phase II awarded to Technip
  • 2014 - Platforms EPC given to HHI

+++ Geology

+++ Links

  1. Shenzhen Chiwan Sembawang Engineering Platform References
  2. AMEC awarded PMC services contract for ADMA OPCO’s multi-billion dollar Nasr and Umm Lulu fields, UAE
  3. Fluor Wins Offshore FEED Contract for Nasr Field in Abu Dhabi
  4. KBR Awarded Major Engineering Design Contract by Hyundai Heavy Industries Co., Limited for the Al-Nasr Full Field Development Project
  5. ADMA-OPCO selects Technip for Project Management Consultancy services for the Nasr Phase II Full Field Development Project
  6. Hyundai Heavy Industries Wins $1.94 Billion Offshore Order in UAE
  7. ABB to provide power and automation solutions for oilfields off UAE coast