Difference between revisions of "Hangingstone Oil Sands Project"
		
		
		
		
		Jump to navigation
		Jump to search
		
Abarrelfull (talk | contribs)  | 
				Abarrelfull (talk | contribs)   | 
				||
| Line 1: | Line 1: | ||
| − | Summary Information  | + | === Summary Information ===  | 
* Operator: Japex  | * Operator: Japex  | ||
* Country: Canada  | * Country: Canada  | ||
| Line 9: | Line 9: | ||
* Production Volume: Production volume at the initial development will be approximately 20,000 barrels per day  | * Production Volume: Production volume at the initial development will be approximately 20,000 barrels per day  | ||
| − | + | === Description ===  | |
| − | * The McMurray   | + | * The McMurray formation, which contains the oil sands in the Hangingstone area, is too deep for surface mining. As a result, the crude oil (bitumen) must be recovered in place (in-situ).  | 
* Bitumen is therefore to be produced by the [[[Steam-Assisted Gravity Drainage (SAGD)]]] method    | * Bitumen is therefore to be produced by the [[[Steam-Assisted Gravity Drainage (SAGD)]]] method    | ||
* Project budget is 1.4 billion Canadian Dollars  | * Project budget is 1.4 billion Canadian Dollars  | ||
| Line 17: | Line 17: | ||
* The oil will be be transported to the Enbridge terminal in Cheecham by a new pipeline  | * The oil will be be transported to the Enbridge terminal in Cheecham by a new pipeline  | ||
| − | + | === Contractors ===  | |
* **Toyo:** Central Processing Facilities and Utilities & Infrastructure (Initial 20,000 bpsd production capacity expandable to 30,000 bpsd in the future / consisting of Steam Generator, water de-oiling, water treatment, product storage facilities), Scope: Detailed Engineering, Procurement and Construction    | * **Toyo:** Central Processing Facilities and Utilities & Infrastructure (Initial 20,000 bpsd production capacity expandable to 30,000 bpsd in the future / consisting of Steam Generator, water de-oiling, water treatment, product storage facilities), Scope: Detailed Engineering, Procurement and Construction    | ||
* **Aker Solutions:**    | * **Aker Solutions:**    | ||
| Line 23: | Line 23: | ||
** Two Oil Treatment Trains (FEED) for FWKO, CEC, and Treater  | ** Two Oil Treatment Trains (FEED) for FWKO, CEC, and Treater  | ||
| − | + | === History ===  | |
* 1999 - Demonstration project started producing bitumen  | * 1999 - Demonstration project started producing bitumen  | ||
* 2001 - Environmental Impact Assessment work and conceptual engineering was started  | * 2001 - Environmental Impact Assessment work and conceptual engineering was started  | ||
| Line 31: | Line 31: | ||
* 2013 - Toyo awarded detailed engineering  | * 2013 - Toyo awarded detailed engineering  | ||
* 2013 - Enbridge and JACOS signed a long term agreement for transportation services  | * 2013 - Enbridge and JACOS signed a long term agreement for transportation services  | ||
| + | * 2017 - Production started  | ||
| − | + | === Geology ===  | |
*    | *    | ||
| − | + | === Links ===  | |
# [http://www.japex.co.jp/english/newsrelease/pdf/20080507_JACOS_PDD.pdf Japan Canada Oil Sands Hangingstone SAGD Project]  | # [http://www.japex.co.jp/english/newsrelease/pdf/20080507_JACOS_PDD.pdf Japan Canada Oil Sands Hangingstone SAGD Project]  | ||
# [[Aker Solutions Oil And Gas Processing References]]  | # [[Aker Solutions Oil And Gas Processing References]]  | ||
| Line 43: | Line 44: | ||
# [http://killajoules.wikidot.com/blog:4520 EPC Contract for Oil Sands SAGD Facilities in Canada]  | # [http://killajoules.wikidot.com/blog:4520 EPC Contract for Oil Sands SAGD Facilities in Canada]  | ||
# [http://killajoules.wikidot.com/blog:4577 Enbridge to Connect JACOS Hangingstone Project to its Regional System]  | # [http://killajoules.wikidot.com/blog:4577 Enbridge to Connect JACOS Hangingstone Project to its Regional System]  | ||
| + | # [https://abarrelfull.blogspot.com/2023/11/cnooc-limited-announced-commencement-of.html CNOOC Limited announced the commencement of production of the Hangingstone Project]  | ||
Latest revision as of 07:57, 15 November 2023
Summary Information
- Operator: Japex
 - Country: Canada
 - Location: Alberta
 - Production start: Expected 2016
 - Partners: JACOS 75% (Operator) Nexen 25%
 - Type: Bitumen
 - Estimated Reserves:
 - Production Volume: Production volume at the initial development will be approximately 20,000 barrels per day
 
Description
- The McMurray formation, which contains the oil sands in the Hangingstone area, is too deep for surface mining. As a result, the crude oil (bitumen) must be recovered in place (in-situ).
 - Bitumen is therefore to be produced by the [[[Steam-Assisted Gravity Drainage (SAGD)]]] method
 - Project budget is 1.4 billion Canadian Dollars
 - JACOS’ current estimate of bitumen resource in the Hangingstone area is sufficient to support a project expansion of up to 35,000 barrels per day for a period of 25 to 30 years.
 - JACOS currently operates a Steam Assisted Gravity Drainage (SAGD) demonstration project on the northeast portion of lease 70. This project is in its tenth year of operation of a projected 20 to 25 year lifespan. It started producing bitumen in July 1999
 - The oil will be be transported to the Enbridge terminal in Cheecham by a new pipeline
 
Contractors
- **Toyo:** Central Processing Facilities and Utilities & Infrastructure (Initial 20,000 bpsd production capacity expandable to 30,000 bpsd in the future / consisting of Steam Generator, water de-oiling, water treatment, product storage facilities), Scope: Detailed Engineering, Procurement and Construction
 - **Aker Solutions:**
- CEC qualification testing
 - Two Oil Treatment Trains (FEED) for FWKO, CEC, and Treater
 
 
History
- 1999 - Demonstration project started producing bitumen
 - 2001 - Environmental Impact Assessment work and conceptual engineering was started
 - 2008 - Environmental Impact Assessment application made
 - 2010 - Application submitted to the Alberta Energy Resources Conservation Board (ERCB) and Alberta Environment (AENV)
 - 2012 - Japex announces final investment decision
 - 2013 - Toyo awarded detailed engineering
 - 2013 - Enbridge and JACOS signed a long term agreement for transportation services
 - 2017 - Production started
 
Geology
Links
- Japan Canada Oil Sands Hangingstone SAGD Project
 - Aker Solutions Oil And Gas Processing References
 - Environmental Impact Assessment of Hangingstone Oil Sands Expansion Project in the Province of Alberta, Canada
 - Submission of Application for Approval of the Hangingstone Oil Sands Expansion Project in the Province of Alberta, Canada
 - Final Investment Decision on Hangingstone Oil Sands Project in Alberta Province, Canada
 - EPC Contract for Oil Sands SAGD Facilities in Canada
 - Enbridge to Connect JACOS Hangingstone Project to its Regional System
 - CNOOC Limited announced the commencement of production of the Hangingstone Project