Difference between revisions of "Su Tu Den Oil Field"

From A Barrel Full
Jump to navigation Jump to search
(Created page with "Summary Information * Operator: * Country: Vietnam * Location: Block 15-1 * Production start: 2003 * Partners: * Type: Oil / Gas * Estimated Reserves: * Production Volume:...")
 
 
Line 10: Line 10:
  
 
+++ Description
 
+++ Description
* The field utilises the [[[Cuulong MV9 FPSO]]]
+
* The field utilises the [[Cuulong MV9 FPSO]]
 
* The Su Tu Den North East project consists of a wellhead platform, several infield pipelines and a composite power/fiber optic submarine cable. The facilities are tied back to existing infrastructure
 
* The Su Tu Den North East project consists of a wellhead platform, several infield pipelines and a composite power/fiber optic submarine cable. The facilities are tied back to existing infrastructure
  
Line 25: Line 25:
  
 
+++ Links
 
+++ Links
 +
# [[Sofec FPSO References‎‎]]
 
# [http://killajoules.wikidot.com/archive:conocophillips-announces-first-oil-from-sutu-den-fie ConocoPhillips Announces First Oil From Su Tu Den Field Offshore Vietnam]
 
# [http://killajoules.wikidot.com/archive:conocophillips-announces-first-oil-from-sutu-den-fie ConocoPhillips Announces First Oil From Su Tu Den Field Offshore Vietnam]
 
# [http://killajoules.wikidot.com/archive:j-ray-mcdermott-wins-vietnamese-engineering-procurem J. Ray McDermott Wins Vietnamese Engineering, Procurement, and Installation Contract]
 
# [http://killajoules.wikidot.com/archive:j-ray-mcdermott-wins-vietnamese-engineering-procurem J. Ray McDermott Wins Vietnamese Engineering, Procurement, and Installation Contract]
 
# [http://killajoules.wikidot.com/blog:2074 ConocoPhillips Announces Sale of Vietnam Business Unit]
 
# [http://killajoules.wikidot.com/blog:2074 ConocoPhillips Announces Sale of Vietnam Business Unit]

Latest revision as of 11:54, 13 November 2023

Summary Information

  • Operator:
  • Country: Vietnam
  • Location: Block 15-1
  • Production start: 2003
  • Partners:
  • Type: Oil / Gas
  • Estimated Reserves:
  • Production Volume:

+++ Description

  • The field utilises the Cuulong MV9 FPSO
  • The Su Tu Den North East project consists of a wellhead platform, several infield pipelines and a composite power/fiber optic submarine cable. The facilities are tied back to existing infrastructure

+++ Contractors

  • **J. Ray McDermott:** Engineering, procurement and installation of Su Tu Den North East project

+++ History

  • 2003 - First oil produced
  • 2008 - McDermott awarded contract for Su Tu Den North East
  • 2012 - ConocoPhillips sells stake to Perenco

+++ Geology

+++ Links

  1. Sofec FPSO References‎‎
  2. ConocoPhillips Announces First Oil From Su Tu Den Field Offshore Vietnam
  3. J. Ray McDermott Wins Vietnamese Engineering, Procurement, and Installation Contract
  4. ConocoPhillips Announces Sale of Vietnam Business Unit