Difference between revisions of "Armada Olombendo FPSO"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) |
||
(2 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
=== Summary Information === | === Summary Information === | ||
− | * Name: Armada | + | * Name: Armada Olombendo FPSO |
* Field: [[East Hub Development Project Oil and Gas Fields]] | * Field: [[East Hub Development Project Oil and Gas Fields]] | ||
* Country: Angola | * Country: Angola | ||
Line 8: | Line 8: | ||
* Field Operated By: ENI | * Field Operated By: ENI | ||
* Capacity: 80,000 bpd | * Capacity: 80,000 bpd | ||
− | * Year of Completion: | + | * Year of Completion: 2016 |
− | + | === Brief Description === | |
* The FPSO, which will have a storage capacity of 1,700,000 barrels, will be able to handle up to 80,000 barrels of oil per day (bopd), 120,000 barrels per day (bpd) of water injection, and 120 million standard cubic feet per day (MMscfd) of gas handling | * The FPSO, which will have a storage capacity of 1,700,000 barrels, will be able to handle up to 80,000 barrels of oil per day (bopd), 120,000 barrels per day (bpd) of water injection, and 120 million standard cubic feet per day (MMscfd) of gas handling | ||
* The vessel is to be named the Armada Olombendo FPSO | * The vessel is to be named the Armada Olombendo FPSO | ||
− | + | === Contractors === | |
* **Bumi Armada:** Supply and operation of FPSO | * **Bumi Armada:** Supply and operation of FPSO | ||
* **Keppel:** FPSO conversion including refurbishment and life extension works, upgrading of living quarters to accommodate 100 personnel, installation and integration of an external turret mooring system and topside process modules | * **Keppel:** FPSO conversion including refurbishment and life extension works, upgrading of living quarters to accommodate 100 personnel, installation and integration of an external turret mooring system and topside process modules | ||
Line 21: | Line 21: | ||
* **ABB:** Electrification and automation systems | * **ABB:** Electrification and automation systems | ||
− | + | === Status === | |
− | * | + | * In operation |
− | + | === History | |
* 2014 - Bumi Armada awarded FPSO contract | * 2014 - Bumi Armada awarded FPSO contract | ||
+ | * 2016 - Keppel delivered the vessel | ||
− | + | === Other Information === | |
* - | * - | ||
=== Links === | === Links === | ||
− | + | # [[Dyna-Mac Topsides Module Business]] | |
# [http://killajoules.wikidot.com/blog:5383 Bumi Armada Signs FPSO Contract With ENI For The Chartering, Operations And Maintenance For Block 15/06, Angola] | # [http://killajoules.wikidot.com/blog:5383 Bumi Armada Signs FPSO Contract With ENI For The Chartering, Operations And Maintenance For Block 15/06, Angola] | ||
# [http://killajoules.wikidot.com/blog:5484 Keppel secures S$153 million in contracts from repeat customers] | # [http://killajoules.wikidot.com/blog:5484 Keppel secures S$153 million in contracts from repeat customers] |
Latest revision as of 17:39, 11 November 2023
Contents
Summary Information
- Name: Armada Olombendo FPSO
- Field: East Hub Development Project Oil and Gas Fields
- Country: Angola
- Ownership: Bumi Armada
- Website:
- Field Operated By: ENI
- Capacity: 80,000 bpd
- Year of Completion: 2016
Brief Description
- The FPSO, which will have a storage capacity of 1,700,000 barrels, will be able to handle up to 80,000 barrels of oil per day (bopd), 120,000 barrels per day (bpd) of water injection, and 120 million standard cubic feet per day (MMscfd) of gas handling
- The vessel is to be named the Armada Olombendo FPSO
Contractors
- **Bumi Armada:** Supply and operation of FPSO
- **Keppel:** FPSO conversion including refurbishment and life extension works, upgrading of living quarters to accommodate 100 personnel, installation and integration of an external turret mooring system and topside process modules
- **Dyna-Mac:** Construction of 6 units of FPSO topsides modules
- **ABB:** Electrification and automation systems
Status
- In operation
=== History
- 2014 - Bumi Armada awarded FPSO contract
- 2016 - Keppel delivered the vessel
Other Information
- -
Links
- Dyna-Mac Topsides Module Business
- Bumi Armada Signs FPSO Contract With ENI For The Chartering, Operations And Maintenance For Block 15/06, Angola
- Keppel secures S$153 million in contracts from repeat customers
- Dyna-Mac Secures S$60 Million Topside Module Fabrication Works From Armada Cabaca Ltd
- ABB to provide power and automation solutions for new Angolan oil field
- Keppel to deliver one of the world’s largest FPSOs to Bumi Armada