Difference between revisions of "Shearwater-Elgin Area Line (SEAL) Gas Pipeline"

From A Barrel Full
Jump to navigation Jump to search
(Created page with "Summary Information * Source: * Destination: * Ownership: Shell * Website: * Length: 468 kilometres ( miles) * Capacity: per day * Status: Operating +++ Details * The...")
 
 
Line 1: Line 1:
 
Summary Information
 
Summary Information
  
* Source:  
+
* Source: Elgin Franklin platform
* Destination:  
+
* Destination: Bacton
 
* Ownership: Shell  
 
* Ownership: Shell  
 
* Website:   
 
* Website:   
* Length: 468 kilometres ( miles)  
+
* Length: 474 kilometres ( miles)  
 
* Capacity: per day  
 
* Capacity: per day  
 
* Status: Operating
 
* Status: Operating
  
 
+++ Details
 
+++ Details
* The Shearwater-Elgin Area Line (SEAL) Gas Pipeline, operated by Shell, transports gas from the Shearwater-Elgin area to the **[[Bacton Gas Plant]]**
+
* The pipeline is 474km long with a diameter of 34 inches and has been operational for more than 20 years. The SEAL pipeline transports sales quality gas from the Elgin Franklin platform in the Central Graben Area of the North Sea to the dedicated SEAL module at the [[Bacton Gas Plant]] on the Norfolk coast.
 +
 
  
 
++++ Related Gas Fields
 
++++ Related Gas Fields
  
* [[Elgin Franklin Gas Field]], [[Shearwater Gas And Condensate Field]]
+
* [[Elgin Franklin Gas Field]], [[Shearwater Gas and Condensate Field]]
  
 
+++ History
 
+++ History
* -  
+
* 2022 - PX Group takes over operations
  
 
+++ Other Information
 
+++ Other Information
Line 23: Line 24:
  
 
+++ Links
 
+++ Links
# []
+
# [https://abarrelfull.blogspot.com/2023/11/px-group-awarded-contract-to-operate.html PX Group Awarded Contract to Operate The SEAL Pipeline In The North Sea]

Latest revision as of 09:14, 8 November 2023

Summary Information

  • Source: Elgin Franklin platform
  • Destination: Bacton
  • Ownership: Shell
  • Website:
  • Length: 474 kilometres ( miles)
  • Capacity: per day
  • Status: Operating

+++ Details

  • The pipeline is 474km long with a diameter of 34 inches and has been operational for more than 20 years. The SEAL pipeline transports sales quality gas from the Elgin Franklin platform in the Central Graben Area of the North Sea to the dedicated SEAL module at the Bacton Gas Plant on the Norfolk coast.


++++ Related Gas Fields

+++ History

  • 2022 - PX Group takes over operations

+++ Other Information

  • -

+++ Links

  1. PX Group Awarded Contract to Operate The SEAL Pipeline In The North Sea