Difference between revisions of "Jackfish Thermal Heavy Oil Project"
		
		
		
		
		Jump to navigation
		Jump to search
		
Abarrelfull (talk | contribs)  | 
				Abarrelfull (talk | contribs)   | 
				||
| Line 1: | Line 1: | ||
| − | Summary Information  | + | === Summary Information ===  | 
* Operator: Canadian Natural Resources  | * Operator: Canadian Natural Resources  | ||
* Country: Canada    | * Country: Canada    | ||
| Line 9: | Line 9: | ||
* Production Volume: 35,000 bpd per phase  | * Production Volume: 35,000 bpd per phase  | ||
| − | + | === Description ===  | |
* The Jackfish Project uses Steam Assisted Gravity Drainage (SAGD) Technology  | * The Jackfish Project uses Steam Assisted Gravity Drainage (SAGD) Technology  | ||
* The combined fluids from the well pads is separated into bitumen, gas and water.    | * The combined fluids from the well pads is separated into bitumen, gas and water.    | ||
| Line 16: | Line 16: | ||
* The project is being developed in 3 phases, each with production capacity of 35,000 bpd  | * The project is being developed in 3 phases, each with production capacity of 35,000 bpd  | ||
| − | + | === Contractors ===  | |
* **WorleyParson:** Prefabrication and piperack and equipment module construction services for phase 2  | * **WorleyParson:** Prefabrication and piperack and equipment module construction services for phase 2  | ||
* **Aker Solutions:**    | * **Aker Solutions:**    | ||
| Line 22: | Line 22: | ||
** Phase 3 - FWKO Vessel c/w desand system; electrical heat tracing; insulation (vessel +	piping) & sample skid (c/w pump & cooler)  | ** Phase 3 - FWKO Vessel c/w desand system; electrical heat tracing; insulation (vessel +	piping) & sample skid (c/w pump & cooler)  | ||
| − | + | === History ===  | |
* 2004 - Approval given for phase 1 of the project  | * 2004 - Approval given for phase 1 of the project  | ||
* 2007 - First oil produced  | * 2007 - First oil produced  | ||
| Line 31: | Line 31: | ||
* 2019 - Devon Energy sells to CNR  | * 2019 - Devon Energy sells to CNR  | ||
| − | + | === Geology ===  | |
*    | *    | ||
| − | + | === Links ===  | |
# [[Aker Solutions Oil And Gas Processing References]]  | # [[Aker Solutions Oil And Gas Processing References]]  | ||
# [http://www.environment.alberta.ca/documents/Devon-Jackfish_PDD.pdf Jackfish 2 Project Public Disclosure Document]  | # [http://www.environment.alberta.ca/documents/Devon-Jackfish_PDD.pdf Jackfish 2 Project Public Disclosure Document]  | ||
Latest revision as of 08:01, 6 November 2023
Summary Information
- Operator: Canadian Natural Resources
 - Country: Canada
 - Location: Conklin, Alberta
 - Production start: 2007
 - Partners: Devon 100%
 - Type: Oil
 - Estimated Reserves: 300 Million per Phase
 - Production Volume: 35,000 bpd per phase
 
Description
- The Jackfish Project uses Steam Assisted Gravity Drainage (SAGD) Technology
 - The combined fluids from the well pads is separated into bitumen, gas and water.
 - Bitumen flows to a pipeline transportation system. The gas is combined with natural fuel gas and burned in the steam generators.
 - The water is transferred to the Water De-oiling System for further treatment.
 - The project is being developed in 3 phases, each with production capacity of 35,000 bpd
 
Contractors
- **WorleyParson:** Prefabrication and piperack and equipment module construction services for phase 2
 - **Aker Solutions:**
- Phase 2 - 1 FWKO Vessel c/w desand system; electrical heat tracing; insulation (vessel + piping) & sample skid (c/w pump & cooler) - 15 OD x 115
 - Phase 3 - FWKO Vessel c/w desand system; electrical heat tracing; insulation (vessel + piping) & sample skid (c/w pump & cooler)
 
 
History
- 2004 - Approval given for phase 1 of the project
 - 2007 - First oil produced
 - 2008 - Approval granted for Phase 2
 - 2010 - Investment decision for Phase 3
 - 2011 - First oil from phase 2
 - 2011 - Phase 3 received regulatory approval from the Alberta Energy Resources Conservation Board and Alberta Environment and Water
 - 2019 - Devon Energy sells to CNR
 
Geology
Links
- Aker Solutions Oil And Gas Processing References
 - Jackfish 2 Project Public Disclosure Document
 - Devon Energy Obtains Approval for Second Jackfish Oil Sands Production Project
 - Devon Energy awards Cord WorleyParsons Jackfish 2 Project contract
 - Devon Energy to Move Forward with Third Phase of Jackfish Oil Sands Project
 - Devon Energy Obtains Approval for Third Jackfish Oil Sands Project
 - Devon Energy Announces Strategic Exit of Canadian Business for CAD $3.8 Billion