Difference between revisions of "Pikka Oil Field"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) |
||
(5 intermediate revisions by the same user not shown) | |||
Line 10: | Line 10: | ||
=== Description === | === Description === | ||
− | * The development will consist of a single-drill site | + | * The development will consist of a single-drill site and a production facility with 80,000 barrels of oil per day (bopd) capacity |
* The project will utilise existing infrastructure, including the Kuparuk transportation pipeline and the [[Trans-Alaska Pipeline System]] | * The project will utilise existing infrastructure, including the Kuparuk transportation pipeline and the [[Trans-Alaska Pipeline System]] | ||
Line 17: | Line 17: | ||
=== History === | === History === | ||
+ | * 2013 - Oil was discovered | ||
+ | * 2017 - Oil Search announces the acquisition of 25.5% of the field | ||
+ | * 2021 - Project FEED is started | ||
+ | * 2021 - Santos and Oil Search merged making Santos operator | ||
* 2022 - Santos announces Pikka FID | * 2022 - Santos announces Pikka FID | ||
Line 22: | Line 26: | ||
* | * | ||
− | === Links === | + | === Links === |
+ | # [https://abarrelfull.blogspot.com/2022/08/oil-search-acquires-world-class-oil.html Oil Search acquires world class oil assets in the prolific Alaska North Slope] | ||
+ | # [https://abarrelfull.blogspot.com/2022/08/pikka-project-enters-feed.html Pikka Project Enters FEED] | ||
# [https://a-barrel-full.blogspot.com/2022/08/santos-announces-pikka-fid.html Santos announces Pikka FID] | # [https://a-barrel-full.blogspot.com/2022/08/santos-announces-pikka-fid.html Santos announces Pikka FID] | ||
− | + | # [https://abarrelfull.blogspot.com/2023/10/santos-and-oil-search-merger-becomes.html Santos And Oil Search Merger Becomes Effective] | |
[[category:Field]] | [[category:Field]] | ||
[[category:USA]] | [[category:USA]] | ||
[[category:Santos]] | [[category:Santos]] |
Latest revision as of 15:42, 31 October 2023
Summary Information
- Operator: Santos
- Country: USA
- Location: North Slope of Alaska
- Production start: Scheduled 2026
- Partners: Santos 51%, Repsol 49%
- Type: Oil
- Estimated Reserves:
- Production Volume: 80,000 bpd in phase one
Description
- The development will consist of a single-drill site and a production facility with 80,000 barrels of oil per day (bopd) capacity
- The project will utilise existing infrastructure, including the Kuparuk transportation pipeline and the Trans-Alaska Pipeline System
Contractors
- -
History
- 2013 - Oil was discovered
- 2017 - Oil Search announces the acquisition of 25.5% of the field
- 2021 - Project FEED is started
- 2021 - Santos and Oil Search merged making Santos operator
- 2022 - Santos announces Pikka FID