Difference between revisions of "Erskine Oil and Gas Field"

From A Barrel Full
Jump to navigation Jump to search
(Created page with "Summary Information * Operator: Chevron * Country: UK * Location: central North Sea * Production start: 1997 * Partners: * Type: Oil & Gas * Estimated Reserves: * Production...")
 
 
(3 intermediate revisions by the same user not shown)
Line 1: Line 1:
Summary Information
+
=== Summary Information ===
* Operator: Chevron
+
* Operator: Ithaca
 
* Country: UK
 
* Country: UK
 
* Location: central North Sea
 
* Location: central North Sea
Line 9: Line 9:
 
* Production Volume:  
 
* Production Volume:  
  
+++ Description
+
=== Description ===
* The field is both high temperature and high pressure
+
* Erskine is a complex high pressure/high-temperature (HP/HT) gas/condensate field located in Block 23/26b of the UK Central North Sea.
 
* The field utilises a small steel normally unmanned platform
 
* The field utilises a small steel normally unmanned platform
* Gas and liquids produced from the Erskine field are processed on the [[[Lomond Oil And Gas Field | Lomond platform]]], with gas then transported via the [[[CATS Central Area Transmission System Gas Pipeline]]] and liquids via [[[Forties Pipeline System]]].
+
* Gas and liquids produced from the Erskine field are processed on the [[Lomond Oil And Gas Field | Lomond platform]], with gas then transported via the [[CATS Central Area Transmission System Gas Pipeline]] and liquids via [[Forties Pipeline System]].
  
+++ Contractors
+
=== Contractors ===
 
* **Lewis Offshore:** Platform Construction
 
* **Lewis Offshore:** Platform Construction
 
* **Saipem:**  
 
* **Saipem:**  
* Platform Jacket EPIC
+
** Platform Jacket EPIC
* Pipelines T&I
+
** Pipelines T&I
 
* **McNulty:** Module construction
 
* **McNulty:** Module construction
 
* **McDermott-ETPM:** Erskine to Lomond installation
 
* **McDermott-ETPM:** Erskine to Lomond installation
Line 24: Line 24:
 
* **J P Kenny:** Review of the hydrate mitigation strategy for all anticipated operating scenarios
 
* **J P Kenny:** Review of the hydrate mitigation strategy for all anticipated operating scenarios
  
+++ History
+
=== History ===
 
* 1995 - Texaco receives approval for the project
 
* 1995 - Texaco receives approval for the project
 
* 1997 - First production
 
* 1997 - First production
 
* 2009 - BG Group acquired a stake from BP
 
* 2009 - BG Group acquired a stake from BP
 +
* 2015 - Shell becomes a partner after acquiring BG Group
 
* 2017 - Chrysaor acquired Shell's stake in the field.
 
* 2017 - Chrysaor acquired Shell's stake in the field.
 +
* 2019 - Ithaca energy acquired Chevron's stake
 +
* 2021 - Premier Oil and Chrysaor merge to create Harbour Energy
  
+++ Geology
+
=== Geology ===
 
*  
 
*  
  
Line 44: Line 47:
 
# [[Saipem Fixed Offshore Production Facilities Project References]]
 
# [[Saipem Fixed Offshore Production Facilities Project References]]
 
# [http://killajoules.wikidot.com/archive:bg-group-completes-uk-north-sea-asset-exchange-with BG Group completes UK North Sea asset exchange with BP]
 
# [http://killajoules.wikidot.com/archive:bg-group-completes-uk-north-sea-asset-exchange-with BG Group completes UK North Sea asset exchange with BP]
 +
# [https://abarrelfull.blogspot.com/2023/09/recommended-cash-and-share-offer-for-bg.html Recommended cash and share offer for BG Group by Royal Dutch Shell]
 
# [https://abarrelfull.blogspot.com/2021/11/shell-to-sell-package-of-uk-north-sea.html Shell to sell package of UK North Sea assets to Chrysaor for up to $3.8bn]
 
# [https://abarrelfull.blogspot.com/2021/11/shell-to-sell-package-of-uk-north-sea.html Shell to sell package of UK North Sea assets to Chrysaor for up to $3.8bn]
 +
# [https://abarrelfull.blogspot.com/2023/05/acquisition-of-chevron-north-sea-limited.html Acquisition Of Chevron North Sea Limited]
 +
# [https://abarrelfull.blogspot.com/2023/10/harbour-energy-to-be-admitted-to-trading.html Harbour Energy to be admitted to trading]
  
 
[[category:Field]]
 
[[category:Field]]
 
[[category:UK]]
 
[[category:UK]]
 +
[[category:Ithaca]]

Latest revision as of 15:34, 30 October 2023

Summary Information

  • Operator: Ithaca
  • Country: UK
  • Location: central North Sea
  • Production start: 1997
  • Partners:
  • Type: Oil & Gas
  • Estimated Reserves:
  • Production Volume:

Description

Contractors

  • **Lewis Offshore:** Platform Construction
  • **Saipem:**
    • Platform Jacket EPIC
    • Pipelines T&I
  • **McNulty:** Module construction
  • **McDermott-ETPM:** Erskine to Lomond installation
  • **BiFab:** Tie-In Spools
  • **J P Kenny:** Review of the hydrate mitigation strategy for all anticipated operating scenarios

History

  • 1995 - Texaco receives approval for the project
  • 1997 - First production
  • 2009 - BG Group acquired a stake from BP
  • 2015 - Shell becomes a partner after acquiring BG Group
  • 2017 - Chrysaor acquired Shell's stake in the field.
  • 2019 - Ithaca energy acquired Chevron's stake
  • 2021 - Premier Oil and Chrysaor merge to create Harbour Energy

Geology

Links

  1. UK Oil and Gas Fields by Approval Date]
  2. List Of Oil Production Platforms In The UK
  3. List Of Oil and Gas Production Platforms In The UK
  4. BiFab Subsea References
  5. J P Kenny Subsea References
  6. Serimax Pipeline References
  7. Saipem Europe Pipeline References
  8. International Protective Coatings Platform References
  9. Saipem Fixed Offshore Production Facilities Project References
  10. BG Group completes UK North Sea asset exchange with BP
  11. Recommended cash and share offer for BG Group by Royal Dutch Shell
  12. Shell to sell package of UK North Sea assets to Chrysaor for up to $3.8bn
  13. Acquisition Of Chevron North Sea Limited
  14. Harbour Energy to be admitted to trading