Abarrelfull (talk | contribs) (Created page with "Summary Information * Operator: Petronas * Country: Malaysia * Location: Offshore Sarawak * Production start: * Partners: * Type: Gas & Condensate * Estimated Reserves: *...") |
Abarrelfull (talk | contribs) |
||
Line 13: | Line 13: | ||
* Phase 1 consists of **F9**, **Kumang** and **Kanowit** fields. | * Phase 1 consists of **F9**, **Kumang** and **Kanowit** fields. | ||
* It comprises a central processing platform (CPP) at Kanowit field (KAKG-A) and drilling platform for F9 (F9JT-A) and Kumang (KUJT-A). | * It comprises a central processing platform (CPP) at Kanowit field (KAKG-A) and drilling platform for F9 (F9JT-A) and Kumang (KUJT-A). | ||
− | * | + | * The Kumang Cluster facilities originally supplied gas to [[Malaysia Satu FLNG Terminal]] in Bintulu. |
+++ Contractors | +++ Contractors |
Revision as of 06:55, 26 October 2023
Summary Information
- Operator: Petronas
- Country: Malaysia
- Location: Offshore Sarawak
- Production start:
- Partners:
- Type: Gas & Condensate
- Estimated Reserves:
- Production Volume:
+++ Description
- The Kumang Cluster field located about 250km offshore Bintulu
- Phase 1 consists of **F9**, **Kumang** and **Kanowit** fields.
- It comprises a central processing platform (CPP) at Kanowit field (KAKG-A) and drilling platform for F9 (F9JT-A) and Kumang (KUJT-A).
- The Kumang Cluster facilities originally supplied gas to Malaysia Satu FLNG Terminal in Bintulu.
+++ Contractors
- **Aker Solutions:**
* Supply subsea production system and services for the Kanowit field * 5600 metres of subsea umbilicals that tie back the Kanowit subsea wells
- **Subsea 7:** Transportation and installation of subsea structures, 5km of umbilical cable, pipeline jumpers and electrical flying leads
- **MMCOG:** Provision of Conceptual Design and Engineering Services
- **Global Industries:** Pipeline installation
- **Sime Darby Engineering:**
* Fabrication, engineering, procurement, testing and pre-commissioning, load-out and sea fastening of the platform * Procurement and construction of drilling platform topsides
- **Allied Marine & Equipment:** KAKG-A Jacket
* **Technip:** Procurement and installation of a 3.2 kilometers flexible flowline between the existing KAKG-A central processing platform in Kanowit field to the PFLNG1 riser. It also includes modification and tie-in works at KAKG-A
+++ History
- 2005 - Kanowit field discovered
- 2008 - Sime Darby awarded platform contract
- 2010 - Aker awarded Kanowit contract
- 2011 - Subsea 7 awarded subsea contract
- 2015 - Technip awarded contract to connect to FLNG
+++ Geology
+++ Links
- MMCOG Platform References
- FoundOcean Subsea References
- Serimax Asia Pipeline References
- Petronas Discovers Gas Offshore Sarawak
- Sime Darby Clinches Oil & Gas Contract Worth RM1 billion
- Petronas Carigali Awards RM2.8 Billion Worth Of Contracts To Local Fabricators
- Kanowit subsea project win
- Subsea 7 Wins Contract For Petronas Carigali In Malaysia
- Technip awarded offshore brownfield and subsea tie-backs for PETRONAS FLNG1