Abarrelfull (talk | contribs) (Created page with "Summary Information * Operator: Hess * Country: Malaysia * Location: PM 302, North Malay Basin * Production start: 2013 * Partners: * Type: Gas * Estimated Reserves: * Pro...") |
Abarrelfull (talk | contribs) |
||
(2 intermediate revisions by the same user not shown) | |||
Line 10: | Line 10: | ||
+++ Description | +++ Description | ||
− | * The field is one of nine in the North Malay Basin Integrated Gas Development Project | + | * The field is one of nine in the [[North Malay Basin Gas Fields | North Malay Basin Integrated Gas Development Project]] |
* The project will be implemented in two phases, namely the Early Production System (EPS) phase, to be followed by the Full Field Development (FFD) phase | * The project will be implemented in two phases, namely the Early Production System (EPS) phase, to be followed by the Full Field Development (FFD) phase | ||
* The field is to be operated using the [[Perisai Kamelia FPSO]] | * The field is to be operated using the [[Perisai Kamelia FPSO]] | ||
Line 23: | Line 23: | ||
* 2012 - Keppel awarded FPSO modification contract | * 2012 - Keppel awarded FPSO modification contract | ||
* 2013 - Production started | * 2013 - Production started | ||
+ | * 2023 - Chevron agreed to acquire Hess, becoming a partner | ||
+++ Geology | +++ Geology | ||
Line 33: | Line 34: | ||
# [http://killajoules.wikidot.com/blog:3647 Keppel’s new contracts bring total 2012 order wins to S$9.9 billion] | # [http://killajoules.wikidot.com/blog:3647 Keppel’s new contracts bring total 2012 order wins to S$9.9 billion] | ||
# [http://killajoules.wikidot.com/blog:4798 Ezra's EOC Starts Gas Production On FPSO Perisai Kamelia For Hess In Malaysia] | # [http://killajoules.wikidot.com/blog:4798 Ezra's EOC Starts Gas Production On FPSO Perisai Kamelia For Hess In Malaysia] | ||
+ | # [https://a-barrel-full.blogspot.com/2023/10/chevron-announces-agreement-to-acquire.html Chevron announces agreement to acquire Hess] | ||
+ | |||
+ | [[category:Field]] | ||
+ | [[category:Malaysia]] | ||
+ | [[category:Hess]] | ||
+ | [[category:Petronas]] |
Latest revision as of 06:21, 26 October 2023
Summary Information
- Operator: Hess
- Country: Malaysia
- Location: PM 302, North Malay Basin
- Production start: 2013
- Partners:
- Type: Gas
- Estimated Reserves:
- Production Volume:
+++ Description
- The field is one of nine in the North Malay Basin Integrated Gas Development Project
- The project will be implemented in two phases, namely the Early Production System (EPS) phase, to be followed by the Full Field Development (FFD) phase
- The field is to be operated using the Perisai Kamelia FPSO
+++ Contractors
- **Kencana:** Engineering, Procurement, Construction and Commissioning (“EPCC”) of Kamelia-A Wellhead Platform (“WHP”) for Early Production System (“EPS”)
- **Keppel:** FPSO modification
+++ History
- 2012 - Contract signed with Hess
- 2012 - Kencana awarded Wellhead Platform contract
- 2012 - Keppel awarded FPSO modification contract
- 2013 - Production started
- 2023 - Chevron agreed to acquire Hess, becoming a partner
+++ Geology
+++ Links
- Hess and PETRONAS Sign Partnership Agreements to Develop North Malay Basin
- EOC Secures Award From Hess For Its FPSO Lewek Arunothai
- Award Of Contract For The Provision Of Engineering, Procurement, Construction And Commissioning Of Kamelia-A Wellhead Platform
- Keppel’s new contracts bring total 2012 order wins to S$9.9 billion
- Ezra's EOC Starts Gas Production On FPSO Perisai Kamelia For Hess In Malaysia
- Chevron announces agreement to acquire Hess