Difference between revisions of "Kitina and Djambala Oil Fields"

From A Barrel Full
Jump to navigation Jump to search
(Created page with "Summary Information * Operator: ENI * Country: Congo * Location: * Production start: * Partners: * Type: Oil / Gas * Estimated Reserves: * Production Volume: +++ Descri...")
 
 
Line 14: Line 14:
 
+++ Contractors
 
+++ Contractors
 
* **Saipem:**
 
* **Saipem:**
* Kitina EPC Project - platform and sealines
+
** Kitina EPC Project - platform and sealines
* Transport & Installation of Kitina Platform Topsides  
+
** Transport & Installation of Kitina Platform Topsides  
 
* **FMC:**
 
* **FMC:**
* Seven horizontal 3"x2" 5,000 psi subsea trees
+
** Seven horizontal 3"x2" 5,000 psi subsea trees
 
  * Conversion kits to existing wellheads
 
  * Conversion kits to existing wellheads
* Two pipeline end manifolds
+
** Two pipeline end manifolds
* Tree to PLEM jumpers (as kits for local fabrication)
+
** Tree to PLEM jumpers (as kits for local fabrication)
* Workover umbilicals
+
** Workover umbilicals
* Electro-hydraulic subsea controls
+
** Electro-hydraulic subsea controls
* Topside controls for platform
+
** Topside controls for platform
* Refurbishment and reuse of customer-owned installation tooling including workover HPU, subsea test tree, tree and tubing hanger running tools, ROV intervention tooling
+
** Refurbishment and reuse of customer-owned installation tooling including workover HPU, subsea test tree, tree and tubing hanger running tools, ROV intervention tooling
* System integration testing, installation assistance, service and maintenance
+
** System integration testing, installation assistance, service and maintenance
 
* **BiFab:** Design and Fabricate 2 No Manifolds for Kitina
 
* **BiFab:** Design and Fabricate 2 No Manifolds for Kitina
 
* **FoundOcean:** Djambala & Sounda pipeline stabilisation
 
* **FoundOcean:** Djambala & Sounda pipeline stabilisation

Latest revision as of 13:18, 22 October 2023

Summary Information

  • Operator: ENI
  • Country: Congo
  • Location:
  • Production start:
  • Partners:
  • Type: Oil / Gas
  • Estimated Reserves:
  • Production Volume:

+++ Description

  • The field development consists of three independent reservoirs, namely, Kitina, Djambala and Sounda. The initial contract for the Djambala and Sounda Fields was for two subsea wells at each location. However Sounda was not developed

+++ Contractors

  • **Saipem:**
    • Kitina EPC Project - platform and sealines
    • Transport & Installation of Kitina Platform Topsides
  • **FMC:**
    • Seven horizontal 3"x2" 5,000 psi subsea trees
* Conversion kits to existing wellheads
    • Two pipeline end manifolds
    • Tree to PLEM jumpers (as kits for local fabrication)
    • Workover umbilicals
    • Electro-hydraulic subsea controls
    • Topside controls for platform
    • Refurbishment and reuse of customer-owned installation tooling including workover HPU, subsea test tree, tree and tubing hanger running tools, ROV intervention tooling
    • System integration testing, installation assistance, service and maintenance
  • **BiFab:** Design and Fabricate 2 No Manifolds for Kitina
  • **FoundOcean:** Djambala & Sounda pipeline stabilisation
  • **JP Kenny:** workscope included two pipeline end manifolds (PLEM), PLEMs named Sounda and Djambala, tie-ins for three trees at each PLEM, two 6" pipelines with a piggable loop, several service and gas lift 2" lines, remote controlled gate valves with ROV overrides, umbilical tie-in to a subsea distribution unit (SDU)

+++ History

  • 1997 - Production begins in the Kitina field
  • 2000 - Production begins in the Djambala field

+++ Geology

+++ Links

  1. FMC, Eni (Agip) Djambala Sounda
  2. Saipem Fixed Offshore Production Facilities Project References
  3. Saipem Africa Pipeline References
  4. BiFab Subsea References
  5. FoundOcean Subsea References
  6. J P Kenny Subsea References