Difference between revisions of "Overland Pass NGL Pipeline"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) |
||
(2 intermediate revisions by the same user not shown) | |||
Line 12: | Line 12: | ||
* The Overland Pass Pipeline includes a 760-mile natural gas liquids (NGL) pipeline from Opal, Wyoming, to the Mid-Continent NGL market center in Conway, Kansas | * The Overland Pass Pipeline includes a 760-mile natural gas liquids (NGL) pipeline from Opal, Wyoming, to the Mid-Continent NGL market center in Conway, Kansas | ||
* In addition, the Piceance Lateral Pipeline, a 150-mile pipeline connecting the Piceance Basin to the Overland Pass Pipeline, and the D-J Basin Lateral Pipeline, a 125-mile pipeline connecting the Denver-Julesberg Basin with the Overland Pass Pipeline | * In addition, the Piceance Lateral Pipeline, a 150-mile pipeline connecting the Piceance Basin to the Overland Pass Pipeline, and the D-J Basin Lateral Pipeline, a 125-mile pipeline connecting the Denver-Julesberg Basin with the Overland Pass Pipeline | ||
+ | * The [[Bakken NGL Pipeline]] connects to the Overland Pass NGL Pipeline in northern Colorado. | ||
=== Pipeline Status === | === Pipeline Status === | ||
Line 21: | Line 22: | ||
* 2011 - Capacity increased from 109,800 b/d to 145,000 b/d | * 2011 - Capacity increased from 109,800 b/d to 145,000 b/d | ||
* 2012 - Capacity increased from 145,000 b/d to 175,000 b/d | * 2012 - Capacity increased from 145,000 b/d to 175,000 b/d | ||
+ | * 2013 - Capacity increased from 175,000 b/d to 245,000 b/d | ||
=== Other Information === | === Other Information === | ||
Line 34: | Line 36: | ||
[[category:Pipeline]] | [[category:Pipeline]] | ||
[[category:USA]] | [[category:USA]] | ||
+ | [[category:Oneok]] | ||
[[category:Williams]] | [[category:Williams]] |
Latest revision as of 15:35, 22 September 2023
Contents
Summary Information
- Source: Opal, Wyo
- Destination: Conway, Kan
- Ownership: ONEOK / Williams
- Website: http://www.oneokpartners.com/
- Length: kilometres (750 miles)
- Capacity: 245,000 barrels of oil per day
- Crude Type: Natural Gas Liquids
Brief Description
- The Overland Pass Pipeline includes a 760-mile natural gas liquids (NGL) pipeline from Opal, Wyoming, to the Mid-Continent NGL market center in Conway, Kansas
- In addition, the Piceance Lateral Pipeline, a 150-mile pipeline connecting the Piceance Basin to the Overland Pass Pipeline, and the D-J Basin Lateral Pipeline, a 125-mile pipeline connecting the Denver-Julesberg Basin with the Overland Pass Pipeline
- The Bakken NGL Pipeline connects to the Overland Pass NGL Pipeline in northern Colorado.
Pipeline Status
- In operation
History
- 2006 - ONEOK Affiliate Announces Joint Venture With Williams
- 2010 - ONEOK Partners Completes Overland Pass Pipeline Transaction With Williams Partners
- 2011 - Capacity increased from 109,800 b/d to 145,000 b/d
- 2012 - Capacity increased from 145,000 b/d to 175,000 b/d
- 2013 - Capacity increased from 175,000 b/d to 245,000 b/d
Other Information
- -