Difference between revisions of "Shin Oak NGL Pipeline"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) |
||
Line 21: | Line 21: | ||
* 2017 - Final investment decision | * 2017 - Final investment decision | ||
* 2019 - Pipeline enters operations | * 2019 - Pipeline enters operations | ||
+ | * 2019 - Altus Midstream acquired a 33% Stake | ||
=== Other Information === | === Other Information === | ||
Line 30: | Line 31: | ||
# [https://abarrelfull.blogspot.com/2023/09/enterprise-to-build-shin-oak-ngl.html Enterprise to Build Shin Oak NGL Pipeline from Permian Basin to Mont Belvieu, Texas] | # [https://abarrelfull.blogspot.com/2023/09/enterprise-to-build-shin-oak-ngl.html Enterprise to Build Shin Oak NGL Pipeline from Permian Basin to Mont Belvieu, Texas] | ||
# [https://abarrelfull.blogspot.com/2023/09/enterprise-begins-service-on-shin-oak.html Enterprise Begins Service on Shin Oak NGL Pipeline] | # [https://abarrelfull.blogspot.com/2023/09/enterprise-begins-service-on-shin-oak.html Enterprise Begins Service on Shin Oak NGL Pipeline] | ||
+ | # [https://abarrelfull.blogspot.com/2023/09/altus-midstream-acquires-stake-in.html Altus Midstream Acquires Stake in Enterprise’s Shin Oak Pipeline] | ||
[[category:Pipeline]] | [[category:Pipeline]] | ||
[[category:USA]] | [[category:USA]] | ||
[[category:Enterprise]] | [[category:Enterprise]] |
Revision as of 11:29, 22 September 2023
Contents
Summary Information
2019 - - * Source: Gaines County, Texas
- Destination: Mont Belvieu, Texas
- Ownership: Enterprise
- Website: https://www.enterpriseproducts.com/
- Length: kilometres (571 miles)
- Capacity: 250,000 barrels of oil per day
- Product Type: mixed NGLs
Brief Description
- The Shin Oak NGL pipeline originates at Hobbs NGL Fractionation Center in Gaines County, Texas. The 24-inch diameter pipeline has an initial design capacity of 250,000 barrels per day (“BPD”), expandable to 600,000 BPD.
- The pipeline is for NGL's from the Permian basin
Pipeline Status
- In operation
History
- 2017 - Final investment decision
- 2019 - Pipeline enters operations
- 2019 - Altus Midstream acquired a 33% Stake
Other Information
- -