Difference between revisions of "NEXUS Gas Transmission (NGT) Pipeline"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) |
||
Line 1: | Line 1: | ||
− | Summary Information | + | === Summary Information === |
* Source: Ohio | * Source: Ohio | ||
Line 12: | Line 12: | ||
* Status: Planned | * Status: Planned | ||
− | + | === Details === | |
* The proposed NGT project will originate in northeastern Ohio, include approximately 250 miles of large diameter pipe, and be capable of transporting one billion cubic feet per day of natural gas. The line will follow existing utility corridors to an interconnect in Michigan and utilize the existing [[Vector Gas Pipeline]] system to reach the Ontario market | * The proposed NGT project will originate in northeastern Ohio, include approximately 250 miles of large diameter pipe, and be capable of transporting one billion cubic feet per day of natural gas. The line will follow existing utility corridors to an interconnect in Michigan and utilize the existing [[Vector Gas Pipeline]] system to reach the Ontario market | ||
* It will include interconnects with Michigan Consolidated Gas Company, Consumers Energy and, through the Vector Pipeline, the Enbridge Tecumseh Gas Storage facility and Union Gas’ [[Dawn Natural Gas Hub]], both in Ontario. | * It will include interconnects with Michigan Consolidated Gas Company, Consumers Energy and, through the Vector Pipeline, the Enbridge Tecumseh Gas Storage facility and Union Gas’ [[Dawn Natural Gas Hub]], both in Ontario. | ||
* Will carry gas from the [[Utica Shale Oil and Gas Field]] | * Will carry gas from the [[Utica Shale Oil and Gas Field]] | ||
− | + | === Contractors === | |
* **Fluor:** Engineering, procurement and construction management services | * **Fluor:** Engineering, procurement and construction management services | ||
− | + | === History === | |
* 2012 - Pipeline project announced | * 2012 - Pipeline project announced | ||
* 2015 - Fluor awarded construction contract | * 2015 - Fluor awarded construction contract | ||
* 2015 - Provincial Approval to Transport Natural Gas from Ohio to Ontario | * 2015 - Provincial Approval to Transport Natural Gas from Ohio to Ontario | ||
+ | * 2017 - Enbridge became a partner when it acquired Spectra | ||
− | + | === Other Information === | |
* - | * - | ||
− | + | === Links === | |
# [http://killajoules.wikidot.com/blog:3048 DTE Energy, Enbridge and Spectra Energy to Develop New Major Pipeline to Connect Utica Shale Gas Supplies to Premium Markets] | # [http://killajoules.wikidot.com/blog:3048 DTE Energy, Enbridge and Spectra Energy to Develop New Major Pipeline to Connect Utica Shale Gas Supplies to Premium Markets] | ||
# [http://killajoules.wikidot.com/blog:5749 Fluor Wins Major Contract for Natural Gas Transmission Project] | # [http://killajoules.wikidot.com/blog:5749 Fluor Wins Major Contract for Natural Gas Transmission Project] | ||
# [http://killajoules.wikidot.com/blog:6113 NEXUS Gas Transmission Customers Receive Provincial Approval to Transport Natural Gas from Ohio to Ontario] | # [http://killajoules.wikidot.com/blog:6113 NEXUS Gas Transmission Customers Receive Provincial Approval to Transport Natural Gas from Ohio to Ontario] | ||
+ | # [https://abarrelfull.blogspot.com/2023/09/enbridge-and-spectra-energy-complete.html Enbridge and Spectra Energy Complete Merger] | ||
+ | |||
+ | [[category:Pipeline]] | ||
+ | [[category:USA]] | ||
+ | [[category:Enbridge]] |
Revision as of 05:57, 21 September 2023
Summary Information
- Source: Ohio
- Destination: Michigan
- Ownership: DTE Energy, Enbridge and Spectra Energy
- Websites:
- Length: kilometres (250 miles)
- Capacity: one billion cubic feet per day
- Status: Planned
Details
- The proposed NGT project will originate in northeastern Ohio, include approximately 250 miles of large diameter pipe, and be capable of transporting one billion cubic feet per day of natural gas. The line will follow existing utility corridors to an interconnect in Michigan and utilize the existing Vector Gas Pipeline system to reach the Ontario market
- It will include interconnects with Michigan Consolidated Gas Company, Consumers Energy and, through the Vector Pipeline, the Enbridge Tecumseh Gas Storage facility and Union Gas’ Dawn Natural Gas Hub, both in Ontario.
- Will carry gas from the Utica Shale Oil and Gas Field
Contractors
- **Fluor:** Engineering, procurement and construction management services
History
- 2012 - Pipeline project announced
- 2015 - Fluor awarded construction contract
- 2015 - Provincial Approval to Transport Natural Gas from Ohio to Ontario
- 2017 - Enbridge became a partner when it acquired Spectra
Other Information
- -
Links
- DTE Energy, Enbridge and Spectra Energy to Develop New Major Pipeline to Connect Utica Shale Gas Supplies to Premium Markets
- Fluor Wins Major Contract for Natural Gas Transmission Project
- NEXUS Gas Transmission Customers Receive Provincial Approval to Transport Natural Gas from Ohio to Ontario
- Enbridge and Spectra Energy Complete Merger