Difference between revisions of "Sabal Trail Natural Gas Pipeline Project"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) |
||
Line 3: | Line 3: | ||
* Source: Tallapoosa County, Alabama | * Source: Tallapoosa County, Alabama | ||
* Destination: Central Florida Hub near Orlando | * Destination: Central Florida Hub near Orlando | ||
− | * Ownership: | + | * Ownership: Enbridge and NextEra Energy, Inc. |
* Website: http://www.sabaltrailtransmission.com/ | * Website: http://www.sabaltrailtransmission.com/ | ||
* Length: kilometres (462 miles) | * Length: kilometres (462 miles) |
Latest revision as of 21:25, 20 September 2023
Summary Information
- Source: Tallapoosa County, Alabama
- Destination: Central Florida Hub near Orlando
- Ownership: Enbridge and NextEra Energy, Inc.
- Website: http://www.sabaltrailtransmission.com/
- Length: kilometres (462 miles)
- Capacity: 1 billion cubic feet per day
- Status: Planned
+++ Details
- The Sabal Trail pipeline includes approximately 465 miles of interstate natural gas pipeline (55 miles in Alabama, 196 miles in Georgia, and 214 miles in Florida) and initially at least 2 compressor stations in Alabama and Florida.
- The pipeline is capable of transporting 1 billion cubic feet per day or more of natural gas to serve local distribution companies, industrial users and natural gas-fired power generators in the Southeast markets.
+++ History
- 2013 - Spectra Energy awarded pipeline contract
- 2017 - Enbridge became a partner when it acquired Spectra
- 2017 - Pipeline entered service
+++ Other Information
- -
+++ Links