| Abarrelfull (talk | contribs)  (Created page with "Summary Information * Operator: ATP * Country: USA  * Location: Atwater Valley Block 63 * Production start: 2010 * Partners:  * Type: Oil & Gas * Estimated Reserves:  * Produc...") | Abarrelfull (talk | contribs)  | ||
| Line 12: | Line 12: | ||
| * The field was originally called Champlain | * The field was originally called Champlain | ||
| * The platform in the Telemark field acts as a production centre for a number of satellite fields | * The platform in the Telemark field acts as a production centre for a number of satellite fields | ||
| − | * These are the [[Mirage Oil  | + | * These are the [[Mirage Oil and Gas Field]] & Morgus Field | 
| * The production platform is designed for 25,000 BPD oil and 50MMscf/D gas, the unit will have expansion capability to 100MMscf/D gas.   | * The production platform is designed for 25,000 BPD oil and 50MMscf/D gas, the unit will have expansion capability to 100MMscf/D gas.   | ||
| * It incorporates six dry-tree wellheads with three pairs of future subsea flow lines | * It incorporates six dry-tree wellheads with three pairs of future subsea flow lines | ||
Latest revision as of 06:42, 5 September 2023
Summary Information
- Operator: ATP
- Country: USA
- Location: Atwater Valley Block 63
- Production start: 2010
- Partners:
- Type: Oil & Gas
- Estimated Reserves:
- Production Volume:
+++ Description
- The field was originally called Champlain
- The platform in the Telemark field acts as a production centre for a number of satellite fields
- These are the Mirage Oil and Gas Field & Morgus Field
- The production platform is designed for 25,000 BPD oil and 50MMscf/D gas, the unit will have expansion capability to 100MMscf/D gas.
- It incorporates six dry-tree wellheads with three pairs of future subsea flow lines
+++ Contractors
- **Mustang Engineering:** Detailed Design for Platform Topsides
- **Gulf Island Fabrication:** Hull & Topsides fabrication
- **Technip:**
- Design and manufacture of one high pressure flexible riser, approximately 3 kilometers long (2 miles),
- Engineering for the installation and welding of one oil and gas production flowline, approximately 21 km long (13 miles),
- Installation of the flowline and associated riser with an option to install an umbilical
- Fabrication and installation of subsea structures and a jumper, and pre-commissioning.
 
- **UniversalPegasus:** Detailed design of both flowline and umbilical, with associated catenary risers and the design of all subsea structures.
+++ History
- 2000 - Telemark Oil Field discovered
- 2005 - Norsk Hydro appointed operator
- 2005 - ERT acquired a 30% stake
- 2008 - Gulf Island Fabrication awarded hull & topsides contracts
- 2010 - First oil produced
+++ Geology
+++ Links
- Gulf Of Mexico Deepwater Natural Gas And Oil Qualified Fields
- Universalpegasus Subsea References
- Appointed operator in the Gulf of Mexico
- Cal Dive Acquires Working Interest in Deepwater Discovery
- Mustang Engineering Awarded Detailed Design for Mirage Topsides
- Gulf Island Fabrication, Inc. Announces The Award Of The Second Mindoc T3 Hull
- Technip awarded two contracts by Bluewater Industries in the Gulf of Mexico
- Gulf Island Fabrication, Inc. Announces Letter Of Intent For The Topsides On The Second Mindoc T3 Hull