Abarrelfull (talk | contribs) (Created page with "Summary Information * Operator: Conoco * Country: USA * Location: Garden Banks Blocks 782, 783 & 784, Central Gulf of Mexico * Production start: 2004 * Partners: * Type: Oil...") |
Abarrelfull (talk | contribs) |
||
| Line 1: | Line 1: | ||
| − | Summary Information | + | === Summary Information === |
| − | * Operator: | + | * Operator: W&T Offshore |
* Country: USA | * Country: USA | ||
* Location: Garden Banks Blocks 782, 783 & 784, Central Gulf of Mexico | * Location: Garden Banks Blocks 782, 783 & 784, Central Gulf of Mexico | ||
| Line 9: | Line 9: | ||
* Production Volume: | * Production Volume: | ||
| − | + | === Description === | |
| − | * The | + | * The was developed through a Tension Leg Platform (“TLP”) which currently includes six producing wells that are tied back to a regional production hub at the Enchilada Platform at Garden Banks 128 |
| − | * It is installed in 4,670 feet of water which at the time of installation | + | * It is installed in 4,670 feet of water which at the time of installation was the World’s Deepest TLP |
* Oil is transported via the [[Auger Crude Oil Pipeline]] and [[Garden Banks Gas Pipeline]] | * Oil is transported via the [[Auger Crude Oil Pipeline]] and [[Garden Banks Gas Pipeline]] | ||
| − | + | === Contractors === | |
* **Samsung Heavy Industries:** TLP Hull Construction | * **Samsung Heavy Industries:** TLP Hull Construction | ||
* **Alliance Engineering:** FEED, Detailed Engineering and Design, Procurement, and Construction Support | * **Alliance Engineering:** FEED, Detailed Engineering and Design, Procurement, and Construction Support | ||
| Line 20: | Line 20: | ||
* **Gulf Island Fabrication:** 96-man living quarters | * **Gulf Island Fabrication:** 96-man living quarters | ||
| − | + | === History === | |
* 1999 - Magnolia Oil And Gas Field discovered | * 1999 - Magnolia Oil And Gas Field discovered | ||
* 2004 - The Magnolia TLP was installed and production started | * 2004 - The Magnolia TLP was installed and production started | ||
* 2010 - BP acquires 25% stake from Devon | * 2010 - BP acquires 25% stake from Devon | ||
* 2010 - Marubeni acquires a 25% stake from BP | * 2010 - Marubeni acquires a 25% stake from BP | ||
| + | * 2019 - W&T Offshore acquired 75% stake from ConocoPhillips | ||
| − | + | === Geology === | |
* | * | ||
| − | + | === Links === | |
# [http://www.alliance-engineering.com/Projects/DeepwaterProjects/MagnoliaTLP.aspx Alliance - Magnolia TLP, ConocoPhillips] | # [http://www.alliance-engineering.com/Projects/DeepwaterProjects/MagnoliaTLP.aspx Alliance - Magnolia TLP, ConocoPhillips] | ||
# [[[Saipem Fixed Offshore Production Facilities Project References]] | # [[[Saipem Fixed Offshore Production Facilities Project References]] | ||
| Line 38: | Line 39: | ||
# [http://killajoules.wikidot.com/archive:bp-enters-deepwater-brazil-and-strengthens-core-port BP Enters Deepwater Brazil and Strengthens Core Portfolio] | # [http://killajoules.wikidot.com/archive:bp-enters-deepwater-brazil-and-strengthens-core-port BP Enters Deepwater Brazil and Strengthens Core Portfolio] | ||
# [http://killajoules.wikidot.com/blog:82 BP to Sell Interests in Four Gulf of Mexico Fields to Marubeni] | # [http://killajoules.wikidot.com/blog:82 BP to Sell Interests in Four Gulf of Mexico Fields to Marubeni] | ||
| + | # [https://abarrelfull.blogspot.com/2023/09/w-offshore-announces-acquisition-of-oil.html W&T Offshore Announces Acquisition of Oil-Weighted Producing Property in the Gulf of Mexico] | ||
Latest revision as of 17:27, 4 September 2023
Summary Information
- Operator: W&T Offshore
- Country: USA
- Location: Garden Banks Blocks 782, 783 & 784, Central Gulf of Mexico
- Production start: 2004
- Partners:
- Type: Oil / Gas
- Estimated Reserves:
- Production Volume:
Description
- The was developed through a Tension Leg Platform (“TLP”) which currently includes six producing wells that are tied back to a regional production hub at the Enchilada Platform at Garden Banks 128
- It is installed in 4,670 feet of water which at the time of installation was the World’s Deepest TLP
- Oil is transported via the Auger Crude Oil Pipeline and Garden Banks Gas Pipeline
Contractors
- **Samsung Heavy Industries:** TLP Hull Construction
- **Alliance Engineering:** FEED, Detailed Engineering and Design, Procurement, and Construction Support
- **Saipem:** Installation of Tendons and Integrated Platform & TLP Piles
- **Gulf Island Fabrication:** 96-man living quarters
History
- 1999 - Magnolia Oil And Gas Field discovered
- 2004 - The Magnolia TLP was installed and production started
- 2010 - BP acquires 25% stake from Devon
- 2010 - Marubeni acquires a 25% stake from BP
- 2019 - W&T Offshore acquired 75% stake from ConocoPhillips
Geology
Links
- Alliance - Magnolia TLP, ConocoPhillips
- [[[Saipem Fixed Offshore Production Facilities Project References]]
- International Protective Coatings Platform References
- Gulf Of Mexico Permanent Deepwater Structures
- Gulf Of Mexico Deepwater Natural Gas And Oil Qualified Fields
- Gulf Island Fabrication Platform References
- BP Enters Deepwater Brazil and Strengthens Core Portfolio
- BP to Sell Interests in Four Gulf of Mexico Fields to Marubeni
- W&T Offshore Announces Acquisition of Oil-Weighted Producing Property in the Gulf of Mexico