Difference between revisions of "Lancaster Oil Field"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) (Created page with "=== Summary Information === * Operator: * Country: * Location: * Production start: * Partners: * Type: Oil / Gas * Estimated Reserves: * Production Volume: === Descrip...") |
Abarrelfull (talk | contribs) |
||
| Line 1: | Line 1: | ||
=== Summary Information === | === Summary Information === | ||
| − | * Operator: | + | * Operator: Prax |
| − | * Country: | + | * Country: UK |
| − | * Location: | + | * Location: West of Shetland |
| − | * Production start: | + | * Production start: 2019 |
| − | * Partners: | + | * Partners: Prax 100% |
* Type: Oil / Gas | * Type: Oil / Gas | ||
* Estimated Reserves: | * Estimated Reserves: | ||
| Line 10: | Line 10: | ||
=== Description === | === Description === | ||
| − | * | + | * The Lancaster Field is located in blocks 205/21a, 205/22a and 205/26b, licence P1368 Central. |
| + | * It is the first basement reservoir development on the UK Continental Shelf, and sits in relatively shallow water of around 160 metres. | ||
| + | * The first phase of the development, the Early Production System (EPS), came on stream in June 2019. | ||
=== Contractors === | === Contractors === | ||
| Line 16: | Line 18: | ||
=== History === | === History === | ||
| − | * | + | * 2009 - The Lancaster Field was discovered by Hurricane |
| + | * 2017 - Approval granted for Lancaster field | ||
| + | * 2019 - First oil | ||
| + | * 2023 - Prax acquired Hurricane Energy | ||
=== Geology === | === Geology === | ||
| Line 22: | Line 27: | ||
=== Links === | === Links === | ||
| − | # | + | # [[UK Oil and Gas Fields by Approval Date]] |
[[category:Field]] | [[category:Field]] | ||
| − | [[category: | + | [[category:UK]] |
| − | [[category: | + | [[category:Prax]] |
Revision as of 16:47, 31 August 2023
Summary Information
- Operator: Prax
- Country: UK
- Location: West of Shetland
- Production start: 2019
- Partners: Prax 100%
- Type: Oil / Gas
- Estimated Reserves:
- Production Volume:
Description
- The Lancaster Field is located in blocks 205/21a, 205/22a and 205/26b, licence P1368 Central.
- It is the first basement reservoir development on the UK Continental Shelf, and sits in relatively shallow water of around 160 metres.
- The first phase of the development, the Early Production System (EPS), came on stream in June 2019.
Contractors
- -
History
- 2009 - The Lancaster Field was discovered by Hurricane
- 2017 - Approval granted for Lancaster field
- 2019 - First oil
- 2023 - Prax acquired Hurricane Energy