Abarrelfull (talk | contribs) (Created page with "=== Summary Information === * Operator: Lundin Petroleum * Country: Norway * Location: 180 km west of Stavanger * Production start: 2015 * Partners: Lundin - 50%, Statoil- 15%...") |
Abarrelfull (talk | contribs) |
||
| (2 intermediate revisions by the same user not shown) | |||
| Line 1: | Line 1: | ||
=== Summary Information === | === Summary Information === | ||
| − | * Operator: | + | * Operator: AkerBP |
* Country: Norway | * Country: Norway | ||
* Location: 180 km west of Stavanger | * Location: 180 km west of Stavanger | ||
| Line 9: | Line 9: | ||
* Production Volume: | * Production Volume: | ||
| − | + | === Description === | |
* The Edvard Grieg field was discovered in 2007 and is located in PL338 in block 16/1 in the North Sea, approximately 180 km west of Stavanger | * The Edvard Grieg field was discovered in 2007 and is located in PL338 in block 16/1 in the North Sea, approximately 180 km west of Stavanger | ||
* The Edvard Grieg platform substructure consists of a four legged launch-installed jacket steel structure with a vertical clean face towards platform south to allow access for a jack-up drilling unit. | * The Edvard Grieg platform substructure consists of a four legged launch-installed jacket steel structure with a vertical clean face towards platform south to allow access for a jack-up drilling unit. | ||
* The topside is a modularized processing plant, consisting of a main deck frame with equipment (C00), a process module (P00) with separately installed flare stack (F00) and a utility module with integrated living quarters (U00). | * The topside is a modularized processing plant, consisting of a main deck frame with equipment (C00), a process module (P00) with separately installed flare stack (F00) and a utility module with integrated living quarters (U00). | ||
* 15 wells will be drilled, of which 12 will target the Luno area and three will target the Tellus area | * 15 wells will be drilled, of which 12 will target the Luno area and three will target the Tellus area | ||
| − | + | ** In the Luno area, nine oil producing wells and three wells that can alternate between gas injectors and water injectors are planned | |
| − | + | ** In the Tellus area, there will be two oil producers and a single water alternating gas well | |
| − | + | ** Seven oil producing wells will be drilled horizontally in the reservoir section | |
| − | + | ** The longest well will be an estimated 5.5 km in length | |
| − | + | ** In total the 15 wells will require 61 km of drilling | |
| − | * The oil transport system includes a 43-kilometre long 28-inch pipeline between the Edvard Grieg platform and a new Y-connection point, which has been installed on the | + | * The oil transport system includes a 43-kilometre long 28-inch pipeline between the Edvard Grieg platform and a new Y-connection point, which has been installed on the [[Grane Oil Field | Grane oil pipeline]] about 4 kilometres from Grane and from here oil is transported by pipeline to the Sture terminal for sale |
| − | * The gas transport system includes a 94-kilometre long 16-inch pipeline from the Edvard Grieg platform to an underwater connection point (T-connection) on the | + | * The gas transport system includes a 94-kilometre long 16-inch pipeline from the Edvard Grieg platform to an underwater connection point (T-connection) on the [[Beryl Oil Field | Beryl pipeline]]. This, in turn, is connected to the [[[Scottish Area Gas Evacuation (SAGE) Pipeline]]] in the UK sector. |
| − | + | === Contractors === | |
| − | * | + | * '''Aker Solutions:''' Engineering, procurement and construction (EPC) contract for the topside for the Edvard Grieg platform |
| − | * | + | * '''Kvaerner:''' |
| − | + | ** Engineering, procurement, construction, load-out and sea-fastening of the jacket and associated piles | |
| − | + | ** Offshore hook-up and commissioning assistance | |
| − | * | + | * '''Emtunga:''' Fabrication of LQ Level 3 & 4. |
| − | + | === History === | |
* 2007 - Edvard Grieg Oil And Gas Field Discovered | * 2007 - Edvard Grieg Oil And Gas Field Discovered | ||
* 2012 - Statoil acquires a stake in the field | * 2012 - Statoil acquires a stake in the field | ||
* 2012 - Plan for development and operation (PDO) approved | * 2012 - Plan for development and operation (PDO) approved | ||
* 2015 - First oil produced | * 2015 - First oil produced | ||
| + | * 2022 - AkerBP became operator after acquiring Lundin Petroleum | ||
| − | + | === Geology === | |
* The Luno and Tellus oil discoveries covers a wide range of reservoirs of different ages and qualities. The different sub-reservoirs represent one discovery of a single accumulation with a common oil-water contact. | * The Luno and Tellus oil discoveries covers a wide range of reservoirs of different ages and qualities. The different sub-reservoirs represent one discovery of a single accumulation with a common oil-water contact. | ||
* The oldest reservoir on the Edvard Grieg field is found in the northern segment – the Tellus area. Well 16/1-15 drilled through a thin sandstone followed by more than 200 m with 440 million year old fractured and weathered basement rock of which almost 50 m is in the oil column. | * The oldest reservoir on the Edvard Grieg field is found in the northern segment – the Tellus area. Well 16/1-15 drilled through a thin sandstone followed by more than 200 m with 440 million year old fractured and weathered basement rock of which almost 50 m is in the oil column. | ||
| Line 57: | Line 58: | ||
# [http://killajoules.wikidot.com/blog:4729 Technip awarded important contract by Statoil for subsea project related to the Edvard Grieg field] | # [http://killajoules.wikidot.com/blog:4729 Technip awarded important contract by Statoil for subsea project related to the Edvard Grieg field] | ||
# [http://killajoules.wikidot.com/blog:6109 Edvard Grieg on stream] | # [http://killajoules.wikidot.com/blog:6109 Edvard Grieg on stream] | ||
| + | # [https://abarrelfull.blogspot.com/2023/08/aker-bp-acquires-lundin-energys-oil-and.html Aker BP acquires Lundin Energy’s oil and gas business] | ||
| + | |||
| + | [[category:Field]] | ||
| + | [[category:Norway]] | ||
| + | [[category:AkerBP]] | ||
Latest revision as of 09:13, 8 August 2023
Summary Information
- Operator: AkerBP
- Country: Norway
- Location: 180 km west of Stavanger
- Production start: 2015
- Partners: Lundin - 50%, Statoil- 15%, Wintershall - 15%, OMV - 20%
- Type: Oil & Gas
- Estimated Reserves:
- Production Volume:
Description
- The Edvard Grieg field was discovered in 2007 and is located in PL338 in block 16/1 in the North Sea, approximately 180 km west of Stavanger
- The Edvard Grieg platform substructure consists of a four legged launch-installed jacket steel structure with a vertical clean face towards platform south to allow access for a jack-up drilling unit.
- The topside is a modularized processing plant, consisting of a main deck frame with equipment (C00), a process module (P00) with separately installed flare stack (F00) and a utility module with integrated living quarters (U00).
- 15 wells will be drilled, of which 12 will target the Luno area and three will target the Tellus area
- In the Luno area, nine oil producing wells and three wells that can alternate between gas injectors and water injectors are planned
- In the Tellus area, there will be two oil producers and a single water alternating gas well
- Seven oil producing wells will be drilled horizontally in the reservoir section
- The longest well will be an estimated 5.5 km in length
- In total the 15 wells will require 61 km of drilling
- The oil transport system includes a 43-kilometre long 28-inch pipeline between the Edvard Grieg platform and a new Y-connection point, which has been installed on the Grane oil pipeline about 4 kilometres from Grane and from here oil is transported by pipeline to the Sture terminal for sale
- The gas transport system includes a 94-kilometre long 16-inch pipeline from the Edvard Grieg platform to an underwater connection point (T-connection) on the Beryl pipeline. This, in turn, is connected to the [[[Scottish Area Gas Evacuation (SAGE) Pipeline]]] in the UK sector.
Contractors
- Aker Solutions: Engineering, procurement and construction (EPC) contract for the topside for the Edvard Grieg platform
- Kvaerner:
- Engineering, procurement, construction, load-out and sea-fastening of the jacket and associated piles
- Offshore hook-up and commissioning assistance
- Emtunga: Fabrication of LQ Level 3 & 4.
History
- 2007 - Edvard Grieg Oil And Gas Field Discovered
- 2012 - Statoil acquires a stake in the field
- 2012 - Plan for development and operation (PDO) approved
- 2015 - First oil produced
- 2022 - AkerBP became operator after acquiring Lundin Petroleum
Geology
- The Luno and Tellus oil discoveries covers a wide range of reservoirs of different ages and qualities. The different sub-reservoirs represent one discovery of a single accumulation with a common oil-water contact.
- The oldest reservoir on the Edvard Grieg field is found in the northern segment – the Tellus area. Well 16/1-15 drilled through a thin sandstone followed by more than 200 m with 440 million year old fractured and weathered basement rock of which almost 50 m is in the oil column.
- The main part of the Luno discovery is conglomerates and sandstones deposited during the Triassic period, around 210 million years ago. A 50 m thick Triassic Aeolian sandstone of excellent reservoir quality was encountered in well 16/1-13 in the central part of the Luno basin.
- More than 50% of the Edvard Grieg reserves are from this sandstone.
- The youngest part of the Edvard Grieg field is a shell-rich sandstone deposited in the lower Cretaceous period, around 140 million years ago.
- In summary, the reservoir rocks on the Edvard Grieg field spans an age range from 440 to 140 million years, representing a range from porous basement and conglomerates to high quality sandstone with excellent properties.
Links
- The Edvard Grieg field, Lundin Petroleum
- Emtunga Offshore Platform References
- Kvaerner Platform References
- Leirvik Living quarters and extensions References
- Kvaerner wins Luno jacket EPC contract
- Kvaerner awarded Edvard Grieg topside EPC contract
- Exploration Well In Pl359 Spudded, Offshore Norway
- Aker Solutions to deliver engineering and fabrication services to Kvaerner's Edvard Grieg contract
- Kvaerner to perform Edvard Grieg offshore hook-up and commissioning assistance
- Transaction to realise value and secure long-term growth on the NCS
- Transaction with Wintershall on Norwegian continental shelf now completed
- Technip awarded important contract by Statoil for subsea project related to the Edvard Grieg field
- Edvard Grieg on stream
- Aker BP acquires Lundin Energy’s oil and gas business