Difference between revisions of "Appaloosa Oil Field"
		
		
		
		
		Jump to navigation
		Jump to search
		
| Abarrelfull (talk | contribs)  (Created page with "Summary Information * Operator: ENI  * Country: USA * Location: Mississippi Canyon Blocks 459, 460, 503 and 504 * Production start: 2011 * Partners: * Type: Oil / Gas * Estima...") | Abarrelfull (talk | contribs)  | ||
| Line 1: | Line 1: | ||
| Summary Information | Summary Information | ||
| * Operator: ENI   | * Operator: ENI   | ||
| + | * [[ENI Oil and Gas Fields]] | ||
| * Country: USA | * Country: USA | ||
| * Location: Mississippi Canyon Blocks 459, 460, 503 and 504 | * Location: Mississippi Canyon Blocks 459, 460, 503 and 504 | ||
| Line 14: | Line 15: | ||
| +++ Contractors | +++ Contractors | ||
| * **Technip:**   | * **Technip:**   | ||
| − | + | ** Project Management and surveys | |
| − | + | ** Engineering, fabrication and installation of a 21-mile long (34-kilometer) production flowline(1), a riser(2) and subsea equipment,   | |
| − | + | ** Installation of free issued umbilical(3) and flying leads, | |
| − | + | ** Pre-commissioning and dewatering of the flowline. | |
| * **Manatee:** Subsea control system, umbilicals, subsea operating procedures, and created the B-MAP interactive manual. | * **Manatee:** Subsea control system, umbilicals, subsea operating procedures, and created the B-MAP interactive manual. | ||
| Line 31: | Line 32: | ||
| +++ Links | +++ Links | ||
| − | #  | + | # [[Gulf Of Mexico Deepwater Natural Gas And Oil Qualified Fields]] | 
| − | #  | + | # [[Manatee Offshore References]] | 
| # [http://killajoules.wikidot.com/archive:eni-sanctions-two-new-projects-in-the-greater-longho Eni sanctions two new projects in the Greater Longhorn Area] | # [http://killajoules.wikidot.com/archive:eni-sanctions-two-new-projects-in-the-greater-longho Eni sanctions two new projects in the Greater Longhorn Area] | ||
| # [http://killajoules.wikidot.com/archive:technip-awarded-a-subsea-contract-for-the-appaloosa Technip awarded a subsea contract for the Appaloosa development in the Gulf of Mexico] | # [http://killajoules.wikidot.com/archive:technip-awarded-a-subsea-contract-for-the-appaloosa Technip awarded a subsea contract for the Appaloosa development in the Gulf of Mexico] | ||
| # [http://killajoules.wikidot.com/blog:1023 Eni: first oil production from the Appaloosa field in the Gulf of Mexico] | # [http://killajoules.wikidot.com/blog:1023 Eni: first oil production from the Appaloosa field in the Gulf of Mexico] | ||
Latest revision as of 11:22, 17 July 2023
Summary Information
- Operator: ENI
- ENI Oil and Gas Fields
- Country: USA
- Location: Mississippi Canyon Blocks 459, 460, 503 and 504
- Production start: 2011
- Partners:
- Type: Oil / Gas
- Estimated Reserves:
- Production Volume:
+++ Description
- Appaloosa production is through a subsea development and a twenty-mile long flow line tied back to the Corral Platform
+++ Contractors
- **Technip:**
- Project Management and surveys
- Engineering, fabrication and installation of a 21-mile long (34-kilometer) production flowline(1), a riser(2) and subsea equipment,
- Installation of free issued umbilical(3) and flying leads,
- Pre-commissioning and dewatering of the flowline.
 
- **Manatee:** Subsea control system, umbilicals, subsea operating procedures, and created the B-MAP interactive manual.
+++ History
- 2007 - Appaloosa Oil Field discovered
- 2008 - Appaloosa development project sanctioned
- 2009 - Technip awarded a subsea contract
- 2011 - First oil produced
+++ Geology
+++ Links
- Gulf Of Mexico Deepwater Natural Gas And Oil Qualified Fields
- Manatee Offshore References
- Eni sanctions two new projects in the Greater Longhorn Area
- Technip awarded a subsea contract for the Appaloosa development in the Gulf of Mexico
- Eni: first oil production from the Appaloosa field in the Gulf of Mexico
