Difference between revisions of "Kodiak Oil Field"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) |
||
| Line 22: | Line 22: | ||
=== History === | === History === | ||
* 2014 - Technip awarded subsea contract | * 2014 - Technip awarded subsea contract | ||
| + | * 2018 - Kosmos became the operator after acquiring Deep Gulf Energy | ||
=== Geology === | === Geology === | ||
| Line 28: | Line 29: | ||
=== Links === | === Links === | ||
# [https://abarrelfull.blogspot.com/2023/07/technip-awarded-subsea-contract-for.html Technip awarded subsea contract for the Kodiak project in the Gulf of Mexico] | # [https://abarrelfull.blogspot.com/2023/07/technip-awarded-subsea-contract-for.html Technip awarded subsea contract for the Kodiak project in the Gulf of Mexico] | ||
| − | + | # [https://abarrelfull.blogspot.com/2023/07/kosmos-energy-completes-acquisition-of.html Kosmos Energy Completes Acquisition of Deep Gulf Energy] | |
[[category:Field]] | [[category:Field]] | ||
[[category:USA]] | [[category:USA]] | ||
[[category:Kosmos]] | [[category:Kosmos]] | ||
Latest revision as of 11:09, 17 July 2023
Summary Information
- Operator: Kosmos
- Country: USA
- Location: Mississippi Canyon Blocks 727 and 771, in the Gulf of Mexico
- Production start:
- Partners:
- Type: Oil / Gas
- Estimated Reserves:
- Production Volume:
Description
- The project consists of a subsea tie-back to the Devils Tower Truss Spar located in Mississippi Canyon Block 773
- The Kodiak field is high temperature and pressure
Contractors
- Technip:
- fabrication(2) and installation of more than 12 kilometers of reeled bi-metallic flowline and riser,
- installation of an 11-kilometer umbilical, associated terminations and flying leads,
- pre-commissioning and testing for the rigid line,
- crossings preparation along with pre-lay and post-lay survey.
History
- 2014 - Technip awarded subsea contract
- 2018 - Kosmos became the operator after acquiring Deep Gulf Energy