Difference between revisions of "Mariner Oil Field"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) (Created page with "Summary Information * Operator: Statoil * Country: UK * Location: East Shetland Platform of the UK North Sea * Production start: Expected 2017 * Partners: Statoil (70%), JX...") |
Abarrelfull (talk | contribs) |
||
(3 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
− | Summary Information | + | === Summary Information === |
− | * Operator: | + | * Operator: Equinor |
* Country: UK | * Country: UK | ||
* Location: East Shetland Platform of the UK North Sea | * Location: East Shetland Platform of the UK North Sea | ||
* Production start: Expected 2017 | * Production start: Expected 2017 | ||
− | * Partners: | + | * Partners: Equinor (65.11%), NEO (20%), Siccar Point (8.89%) and ONE-Dyas (6%) |
* Type: Oil | * Type: Oil | ||
* Estimated Reserves: | * Estimated Reserves: | ||
* Production Volume: | * Production Volume: | ||
− | + | === Description === | |
− | * The field | + | * The field was developed with a production, drilling and quarters (PDQ) platform, based on a steel jacket, with 50 active well slots, and a floating storage unit (FSU) of 850,000 bbls capacity. In addition a jack-up rig will be used for the first 4 - 5 years. |
− | * | + | * The field is estimated to produce for 30 years, with average production of around 55,000 barrels of oil per day over the plateau period |
− | + | === Contractors === | |
* **Aker Solutions:** | * **Aker Solutions:** | ||
− | + | ** The topside FEED (front-end engineering and design) | |
− | + | ** Delivery of a drilling equipment package for the production platform | |
− | + | ** Engineering, construction and commissioning services for the hook-up phase | |
* **Dragados Offshore:** Engineering, procurement and construction (EPC) of the steel jacket | * **Dragados Offshore:** Engineering, procurement and construction (EPC) of the steel jacket | ||
* **Daewoo Shipbuilding & Marine Engineering:** Contract award for the topside | * **Daewoo Shipbuilding & Marine Engineering:** Contract award for the topside | ||
Line 28: | Line 28: | ||
− | + | === History === | |
* 1981 - The Mariner field was discovered | * 1981 - The Mariner field was discovered | ||
* 2007 - Statoil entered the license as operator | * 2007 - Statoil entered the license as operator | ||
Line 36: | Line 36: | ||
* 2013 - CB&I awarded Topsides detailed engineering contract | * 2013 - CB&I awarded Topsides detailed engineering contract | ||
* 2013 - DECC approves Mariner field development plan | * 2013 - DECC approves Mariner field development plan | ||
+ | * 2019 - The field came on stream | ||
+ | * 2022 - NEO acquired a stake from JX Nippon | ||
+ | * 2022 - Ithaca became a partner after acquiring Siccar Point Energy | ||
− | + | === Geology === | |
* The Mariner Field consists of two shallow reservoirs, the Maureen Formation and the Heimdal Sandstones of the Lista Formation, with nearly 2 billion barrels of oil in place and expected reserves of more than 250 million barrels of oil. Both formations yield heavy oil of around 12 to 14 API. | * The Mariner Field consists of two shallow reservoirs, the Maureen Formation and the Heimdal Sandstones of the Lista Formation, with nearly 2 billion barrels of oil in place and expected reserves of more than 250 million barrels of oil. Both formations yield heavy oil of around 12 to 14 API. | ||
− | + | === Links === | |
# [http://killajoules.wikidot.com/archive:hydro-acquires-interests-in-uk-heavy-oil-fields Hydro acquires interests in UK heavy oil fields] | # [http://killajoules.wikidot.com/archive:hydro-acquires-interests-in-uk-heavy-oil-fields Hydro acquires interests in UK heavy oil fields] | ||
# [http://killajoules.wikidot.com/blog:1035 Aker Solutions to conduct FEED study for Statoil's Mariner field] | # [http://killajoules.wikidot.com/blog:1035 Aker Solutions to conduct FEED study for Statoil's Mariner field] | ||
Line 57: | Line 60: | ||
# [http://killajoules.wikidot.com/blog:5641 Aker Solutions Wins Hook-Up and Commissioning Contract for Mariner Development] | # [http://killajoules.wikidot.com/blog:5641 Aker Solutions Wins Hook-Up and Commissioning Contract for Mariner Development] | ||
# [http://killajoules.wikidot.com/blog:5662 Statoil awards Mariner drilling and well services contract to Schlumberger Oilfield UK] | # [http://killajoules.wikidot.com/blog:5662 Statoil awards Mariner drilling and well services contract to Schlumberger Oilfield UK] | ||
+ | # [https://abarrelfull.blogspot.com/2023/03/mariner-on-stream.html Mariner on stream] | ||
+ | # [https://abarrelfull.blogspot.com/2023/03/acquisition-of-jx-nippon-exploration.html Acquisition of JX Nippon Exploration and Production (U.K.) Limited] | ||
+ | # [https://abarrelfull.blogspot.com/2023/07/completion-of-acquisition-of-siccar.html Completion of Acquisition of Siccar Point Energy] | ||
+ | |||
+ | [[category:Field]] | ||
+ | [[category:Equinor]] | ||
+ | [[category:UK]] |
Latest revision as of 09:45, 17 July 2023
Summary Information
- Operator: Equinor
- Country: UK
- Location: East Shetland Platform of the UK North Sea
- Production start: Expected 2017
- Partners: Equinor (65.11%), NEO (20%), Siccar Point (8.89%) and ONE-Dyas (6%)
- Type: Oil
- Estimated Reserves:
- Production Volume:
Description
- The field was developed with a production, drilling and quarters (PDQ) platform, based on a steel jacket, with 50 active well slots, and a floating storage unit (FSU) of 850,000 bbls capacity. In addition a jack-up rig will be used for the first 4 - 5 years.
- The field is estimated to produce for 30 years, with average production of around 55,000 barrels of oil per day over the plateau period
Contractors
- **Aker Solutions:**
- The topside FEED (front-end engineering and design)
- Delivery of a drilling equipment package for the production platform
- Engineering, construction and commissioning services for the hook-up phase
- **Dragados Offshore:** Engineering, procurement and construction (EPC) of the steel jacket
- **Daewoo Shipbuilding & Marine Engineering:** Contract award for the topside
- **CB&I:** Detailed engineering design services for the Mariner Topsides
- **Odfjell Drilling:** Drilling services, maintenance of the drilling facility and drill pipe logistics
- **Noble:** Drilling services
- **EMAS AMC:** Transport and floater installation contract
- **ABB:** Internal and external telecommunication systems
- **Schlumberger:** Drilling, completion, electrical submersible pumps (ESPs), cement and fluids
History
- 1981 - The Mariner field was discovered
- 2007 - Statoil entered the license as operator
- 2011 - Aker awarded topside FEED
- 2012 - JX Nippon acquires a stake from ENI
- 2012 - Statoil makes investment decision for the project
- 2013 - CB&I awarded Topsides detailed engineering contract
- 2013 - DECC approves Mariner field development plan
- 2019 - The field came on stream
- 2022 - NEO acquired a stake from JX Nippon
- 2022 - Ithaca became a partner after acquiring Siccar Point Energy
Geology
- The Mariner Field consists of two shallow reservoirs, the Maureen Formation and the Heimdal Sandstones of the Lista Formation, with nearly 2 billion barrels of oil in place and expected reserves of more than 250 million barrels of oil. Both formations yield heavy oil of around 12 to 14 API.
Links
- Hydro acquires interests in UK heavy oil fields
- Aker Solutions to conduct FEED study for Statoil's Mariner field
- Major asset acquisition in the UKCS
- Statoil makes investment decision for the Mariner project
- CB&I Announces Offshore Award
- Mariner field opens new chapter in UK oil and gas development
- Odfjell Drilling to provide platform drilling on Mariner
- Loan for Acquisition of Interests and Development of Oil Fields in British North Sea
- Noble Corporation has been awarded the drilling services for Mariner project
- Aker Solutions to deliver drilling equipment package for Mariner platform
- Ezra’s Subsea Services division awarded US$126 million floater installation contract from Statoil
- Statoil on track with Mariner field development project
- ABB wins $60 million telecom contracts for Statoil platforms
- Statoil awards Mariner contracts to UK suppliers
- Aker Solutions Wins Hook-Up and Commissioning Contract for Mariner Development
- Statoil awards Mariner drilling and well services contract to Schlumberger Oilfield UK
- Mariner on stream
- Acquisition of JX Nippon Exploration and Production (U.K.) Limited
- Completion of Acquisition of Siccar Point Energy