Difference between revisions of "Southeast Gateway Gas Pipeline"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) |
||
(2 intermediate revisions by the same user not shown) | |||
Line 13: | Line 13: | ||
* The Southeast Gateway Pipeline will originate onshore in Tuxpan, Veracruz, then proceed offshore, making landfall at Coatzacoalcos, Veracruz and Dos Bocas, Tabasco. | * The Southeast Gateway Pipeline will originate onshore in Tuxpan, Veracruz, then proceed offshore, making landfall at Coatzacoalcos, Veracruz and Dos Bocas, Tabasco. | ||
* The pipeline is scheduled for completion in 2025 | * The pipeline is scheduled for completion in 2025 | ||
+ | * The pipe was supplied by Europipe and Allseas is responsible for pipelaying. | ||
+ | * One of the anchor customers for the pipeline will be the [[Dos Bocas Olmeca Refinery]] | ||
=== History === | === History === | ||
Line 24: | Line 26: | ||
# [https://abarrelfull.blogspot.com/2023/04/tc-energy-and-mexicos-comision-federal.html TC Energy and Mexico’s Comisión Federal de Electricidad announce a first-of-its-kind strategic partnership to develop world-class energy infrastructure in Mexico] | # [https://abarrelfull.blogspot.com/2023/04/tc-energy-and-mexicos-comision-federal.html TC Energy and Mexico’s Comisión Federal de Electricidad announce a first-of-its-kind strategic partnership to develop world-class energy infrastructure in Mexico] | ||
# [https://abarrelfull.blogspot.com/2023/04/allseas-wins-contract-for-major-gas.html Allseas wins contract for major gas pipeline in Mexico] | # [https://abarrelfull.blogspot.com/2023/04/allseas-wins-contract-for-major-gas.html Allseas wins contract for major gas pipeline in Mexico] | ||
+ | # [https://abarrelfull.blogspot.com/2023/04/europipe-receives-major-order-for.html EUROPIPE receives major order for pipeline in the Gulf of Mexico] | ||
[[category:Pipeline]] | [[category:Pipeline]] | ||
[[category:Mexico]] | [[category:Mexico]] | ||
[[category:TC Energy]] | [[category:TC Energy]] |
Latest revision as of 13:49, 22 April 2023
Summary Information
- Source: Tuxpan, Veracruz
- Destination: Dos Bocas, Tabasco
- Ownership: TC Eenergy / CFE
- Website: https://www.tcenergy.com/
- Length: 715 kilometres ( miles)
- Capacity: 1.3 bcft per day
- Status: Planned
Details
- The Southeast Gateway Pipeline is a 1.3 billion cubic feet per day, 715-kilometre offshore natural gas pipeline
- The Southeast Gateway Pipeline will originate onshore in Tuxpan, Veracruz, then proceed offshore, making landfall at Coatzacoalcos, Veracruz and Dos Bocas, Tabasco.
- The pipeline is scheduled for completion in 2025
- The pipe was supplied by Europipe and Allseas is responsible for pipelaying.
- One of the anchor customers for the pipeline will be the Dos Bocas Olmeca Refinery
History
- 2022 - TC Energy and CFE sign partnership agreement
- 2022 - Allseas awarded pipelaying contract
Other Information
- -