Difference between revisions of "Southeast Gateway Gas Pipeline"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) (Created page with "=== Summary Information === * Source: * Destination: * Ownership: * Website: * Length: kilometres ( miles) * Capacity: per day * Status: (Operating/Planned/Under Cons...") |
Abarrelfull (talk | contribs) |
||
Line 1: | Line 1: | ||
=== Summary Information === | === Summary Information === | ||
− | * Source: | + | * Source: Tuxpan, Veracruz |
− | * Destination: | + | * Destination: Dos Bocas, Tabasco |
− | * Ownership: | + | * Ownership: TC Eenergy / CFE |
− | * Website: | + | * Website: https://www.tcenergy.com/ |
− | * Length: | + | * Length: 715 kilometres ( miles) |
− | * Capacity: per day | + | * Capacity: 1.3 bcft per day |
− | * Status: | + | * Status: Planned |
=== Details === | === Details === | ||
− | * - | + | * The Southeast Gateway Pipeline is a 1.3 billion cubic feet per day, 715-kilometre offshore natural gas pipeline |
+ | * The Southeast Gateway Pipeline will originate onshore in Tuxpan, Veracruz, then proceed offshore, making landfall at Coatzacoalcos, Veracruz and Dos Bocas, Tabasco. | ||
+ | * The pipeline is scheduled for completion in 2025 | ||
=== History === | === History === | ||
− | * - | + | * 2022 - TC Energy and CFE sign partnership agreement |
=== Other Information === | === Other Information === | ||
Line 19: | Line 21: | ||
=== Links === | === Links === | ||
− | # [] | + | # [https://abarrelfull.blogspot.com/2023/04/tc-energy-and-mexicos-comision-federal.html TC Energy and Mexico’s Comisión Federal de Electricidad announce a first-of-its-kind strategic partnership to develop world-class energy infrastructure in Mexico] |
[[category:Pipeline]] | [[category:Pipeline]] | ||
[[category:Mexico]] | [[category:Mexico]] | ||
[[category:TC Energy]] | [[category:TC Energy]] |
Revision as of 13:04, 21 April 2023
Summary Information
- Source: Tuxpan, Veracruz
- Destination: Dos Bocas, Tabasco
- Ownership: TC Eenergy / CFE
- Website: https://www.tcenergy.com/
- Length: 715 kilometres ( miles)
- Capacity: 1.3 bcft per day
- Status: Planned
Details
- The Southeast Gateway Pipeline is a 1.3 billion cubic feet per day, 715-kilometre offshore natural gas pipeline
- The Southeast Gateway Pipeline will originate onshore in Tuxpan, Veracruz, then proceed offshore, making landfall at Coatzacoalcos, Veracruz and Dos Bocas, Tabasco.
- The pipeline is scheduled for completion in 2025
History
- 2022 - TC Energy and CFE sign partnership agreement
Other Information
- -