=== Summary Information === | === Summary Information === | ||
| − | * Ownership: | + | * Ownership: Gasgrid |
| − | * Website: | + | * Website: https://gasgrid.fi/ |
| − | * Location: | + | * Location: Inkloo, Finland |
| − | * Capacity: million tons/annum | + | * Capacity: 3 million tons/annum (4 BCM) |
| − | * Status: | + | * Status: In operation |
| + | |||
=== Brief Description === | === Brief Description === | ||
| − | + | * The floating storage and regasification unit (FSRU) Exemplar is 291 meters long and 43 meters wide. | |
| + | * It has a volume of approximately 151,000 cubic meters, corresponding to approximately 68,000 tonnes of LNG, liquefied natural gas, when fully loaded. | ||
| + | * This means approximately 1,050 GWh of energy content. | ||
=== Technical Details === | === Technical Details === | ||
| − | * Storage capacity: | + | * Storage capacity: 151,000 cubic meters |
| − | * Unloading capacity: | + | * Unloading capacity: |
| − | * Send out capacity: | + | * Send out capacity: 140 GWh/day |
* Constructor: | * Constructor: | ||
=== Ongoing Projects/Project Status === | === Ongoing Projects/Project Status === | ||
| − | + | * The project was completed by the end of [[LNG Terminal Projects to be Completed in 2022 | 2022]], and commercial operations began in 2023 | |
=== Suppliers / Customers === | === Suppliers / Customers === | ||
| Line 23: | Line 26: | ||
* Suppliers: | * Suppliers: | ||
* Customers: | * Customers: | ||
| + | ** The port is well situated about 1.5 km from the [[Balticconnector]] natural gas pipeline that unites the Finnish and Baltic countries’ gas markets. | ||
=== History === | === History === | ||
| − | * | + | * 2022 - Agreement signed between Gasgrid Finland and Fortum |
| + | * 2022 - FSRU delivered to Inkoo | ||
| + | * 2023 - Eesti gas bought capacity to supply Estonia | ||
| + | * 2023 - Vitol delivers the first cargo | ||
=== Other Information === | === Other Information === | ||
| Line 32: | Line 39: | ||
- | - | ||
=== Links === | === Links === | ||
| − | # | + | # [https://lng-news.blogspot.com/2022/06/finlands-first-floating-lng-terminal-to.html Finland’s first floating LNG terminal to be placed in Fortum’s Inkoo port] |
| + | # [https://lng-news.blogspot.com/2022/09/gasgrid-finland-and-fortum-have.html Gasgrid Finland and Fortum have completed negotiations – LNG terminal vessel project progresses to plan] | ||
| + | # [https://lng-news.blogspot.com/2022/12/excelerate-energy-delivers-fsru.html Excelerate Energy Delivers FSRU Exemplar to Finland with Commissioning Cargo] | ||
| + | # [https://lng-news.blogspot.com/2023/02/eesti-gaas-has-agreements-for-receiving.html Eesti Gaas has agreements for receiving ten LNG cargos] | ||
| + | # [https://lng-news.blogspot.com/2023/04/vitol-delivers-first-lng-cargo-into.html Vitol delivers first LNG cargo into Finland’s new Inkoo terminal] | ||
[[category:LNG]] | [[category:LNG]] | ||
[[category:Finland]] | [[category:Finland]] | ||
Latest revision as of 15:46, 10 April 2023
Contents
Summary Information
- Ownership: Gasgrid
- Website: https://gasgrid.fi/
- Location: Inkloo, Finland
- Capacity: 3 million tons/annum (4 BCM)
- Status: In operation
Brief Description
- The floating storage and regasification unit (FSRU) Exemplar is 291 meters long and 43 meters wide.
- It has a volume of approximately 151,000 cubic meters, corresponding to approximately 68,000 tonnes of LNG, liquefied natural gas, when fully loaded.
- This means approximately 1,050 GWh of energy content.
Technical Details
- Storage capacity: 151,000 cubic meters
- Unloading capacity:
- Send out capacity: 140 GWh/day
- Constructor:
Ongoing Projects/Project Status
- The project was completed by the end of 2022, and commercial operations began in 2023
Suppliers / Customers
- Suppliers:
- Customers:
- The port is well situated about 1.5 km from the Balticconnector natural gas pipeline that unites the Finnish and Baltic countries’ gas markets.
History
- 2022 - Agreement signed between Gasgrid Finland and Fortum
- 2022 - FSRU delivered to Inkoo
- 2023 - Eesti gas bought capacity to supply Estonia
- 2023 - Vitol delivers the first cargo
Other Information
-
Links
- Finland’s first floating LNG terminal to be placed in Fortum’s Inkoo port
- Gasgrid Finland and Fortum have completed negotiations – LNG terminal vessel project progresses to plan
- Excelerate Energy Delivers FSRU Exemplar to Finland with Commissioning Cargo
- Eesti Gaas has agreements for receiving ten LNG cargos
- Vitol delivers first LNG cargo into Finland’s new Inkoo terminal