Difference between revisions of "Bay du Nord Oil and Gas Field"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) |
||
Line 19: | Line 19: | ||
* 2013 - Statoil discovered the Bay du Nord field | * 2013 - Statoil discovered the Bay du Nord field | ||
* 2016 - Statoil completes drilling campaign | * 2016 - Statoil completes drilling campaign | ||
+ | * 2022 - The project was awarded environmental permits | ||
* 2023 - KBR awarded FPSO contract | * 2023 - KBR awarded FPSO contract | ||
Line 26: | Line 27: | ||
=== Links === | === Links === | ||
# [https://www.equinor.com/where-we-are/canada-bay-du-nord The Bay du Nord project, Equinor] | # [https://www.equinor.com/where-we-are/canada-bay-du-nord The Bay du Nord project, Equinor] | ||
+ | # [https://iaac-aeic.gc.ca/050/evaluations/document/143500?culture=en-CA Environmental statement decision] | ||
# [https://abarrelfull.blogspot.com/2023/04/statoil-completes-efficient-exploration.html Statoil completes efficient exploration drilling campaign offshore Newfoundland] | # [https://abarrelfull.blogspot.com/2023/04/statoil-completes-efficient-exploration.html Statoil completes efficient exploration drilling campaign offshore Newfoundland] | ||
# [https://a-barrel-full.blogspot.com/2023/04/kbr-awarded-front-end-engineering.html KBR Awarded Front End Engineering Design Contract for Equinor Bay du Nord FPSO Project] | # [https://a-barrel-full.blogspot.com/2023/04/kbr-awarded-front-end-engineering.html KBR Awarded Front End Engineering Design Contract for Equinor Bay du Nord FPSO Project] |
Latest revision as of 06:50, 4 April 2023
Summary Information
- Operator: Equinor
- Country: Canada
- Location: offshore Newfoundland
- Production start:
- Partners: BP
- Type: Oil & Gas
- Estimated Reserves:
- Production Volume:
Description
- The Bay du Nord project (BdN) consist of several oil discoveries in the Flemish Pass basin, some 500 km northeast of St. John’s in Newfoundland and Labrador, Canada
- Equinor is developing the Bay du Nord field using a floating production unit for storage and offshore offloading (FPSO)
Contractors
- KBR: front-end engineering design (FEED) of the topside facilities and pre-FEED engineering
History
- 2013 - Statoil discovered the Bay du Nord field
- 2016 - Statoil completes drilling campaign
- 2022 - The project was awarded environmental permits
- 2023 - KBR awarded FPSO contract