* Location: offshore Newfoundland | * Location: offshore Newfoundland | ||
* Production start: | * Production start: | ||
− | * Partners: | + | * Partners: BP |
* Type: Oil & Gas | * Type: Oil & Gas | ||
* Estimated Reserves: | * Estimated Reserves: | ||
Line 10: | Line 10: | ||
=== Description === | === Description === | ||
− | * | + | * The Bay du Nord project (BdN) consist of several oil discoveries in the Flemish Pass basin, some 500 km northeast of St. John’s in Newfoundland and Labrador, Canada |
+ | * Equinor is developing the Bay du Nord field using a floating production unit for storage and offshore offloading (FPSO) | ||
=== Contractors === | === Contractors === | ||
Line 16: | Line 17: | ||
=== History === | === History === | ||
+ | * 2013 - Statoil discovered the Bay du Nord field | ||
+ | * 2016 - Statoil completes drilling campaign | ||
+ | * 2022 - The project was awarded environmental permits | ||
* 2023 - KBR awarded FPSO contract | * 2023 - KBR awarded FPSO contract | ||
Line 23: | Line 27: | ||
=== Links === | === Links === | ||
# [https://www.equinor.com/where-we-are/canada-bay-du-nord The Bay du Nord project, Equinor] | # [https://www.equinor.com/where-we-are/canada-bay-du-nord The Bay du Nord project, Equinor] | ||
+ | # [https://iaac-aeic.gc.ca/050/evaluations/document/143500?culture=en-CA Environmental statement decision] | ||
+ | # [https://abarrelfull.blogspot.com/2023/04/statoil-completes-efficient-exploration.html Statoil completes efficient exploration drilling campaign offshore Newfoundland] | ||
# [https://a-barrel-full.blogspot.com/2023/04/kbr-awarded-front-end-engineering.html KBR Awarded Front End Engineering Design Contract for Equinor Bay du Nord FPSO Project] | # [https://a-barrel-full.blogspot.com/2023/04/kbr-awarded-front-end-engineering.html KBR Awarded Front End Engineering Design Contract for Equinor Bay du Nord FPSO Project] | ||
Latest revision as of 06:50, 4 April 2023
Summary Information
- Operator: Equinor
- Country: Canada
- Location: offshore Newfoundland
- Production start:
- Partners: BP
- Type: Oil & Gas
- Estimated Reserves:
- Production Volume:
Description
- The Bay du Nord project (BdN) consist of several oil discoveries in the Flemish Pass basin, some 500 km northeast of St. John’s in Newfoundland and Labrador, Canada
- Equinor is developing the Bay du Nord field using a floating production unit for storage and offshore offloading (FPSO)
Contractors
- KBR: front-end engineering design (FEED) of the topside facilities and pre-FEED engineering
History
- 2013 - Statoil discovered the Bay du Nord field
- 2016 - Statoil completes drilling campaign
- 2022 - The project was awarded environmental permits
- 2023 - KBR awarded FPSO contract