Difference between revisions of "N05-A Gas Field"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) (Created page with "=== Summary Information === * Operator: * Country: * Location: * Production start: * Partners: * Type: Oil / Gas * Estimated Reserves: * Production Volume: === Descrip...") |
Abarrelfull (talk | contribs) |
||
(4 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
=== Summary Information === | === Summary Information === | ||
− | * Operator: | + | * Operator: One Dyas |
− | * Country: | + | * Country: https://onedyas.com/ |
− | * Location: | + | * Location: North Sea, Netherlands |
− | * Production start: | + | * Production start: 2024 target |
− | * Partners: | + | * Partners: ONE-Dyas, Hansa Hydrocarbons and EBN |
− | * Type: | + | * Type: Gas |
* Estimated Reserves: | * Estimated Reserves: | ||
* Production Volume: | * Production Volume: | ||
=== Description === | === Description === | ||
− | * | + | * The largest new gas development in the Netherlands in the last 15 years. |
+ | * The expected volume to be produced from the N05-A field and surrounding prospects is 4.5 to 13 BCM | ||
+ | * The platform will be connected to an offshore windfarm, to reduce emissions. | ||
=== Contractors === | === Contractors === | ||
− | * | + | * Allseas: Pipeline installation and burial |
+ | * HSM: Platform construction | ||
+ | * Heerema Marine Contractors: Platform installation | ||
+ | * Corinth Pipeworks: Supply of High Frequency Welded (HFW) steel pipes | ||
=== History === | === History === | ||
− | * | + | * 2022 - HSM awarded platform contract |
+ | * 2023 - Final investment decision | ||
=== Geology === | === Geology === | ||
Line 22: | Line 28: | ||
=== Links === | === Links === | ||
− | # | + | # [https://abarrelfull.blogspot.com/2023/03/hsm-builds-one-dyas-first-electrified.html HSM Builds One-Dyas First Electrified N05-A Gas Platform] |
+ | # [https://abarrelfull.blogspot.com/2023/03/one-dyas-invests-in-energy-transition.html ONE-Dyas invests in energy transition together with Dutch companies] | ||
+ | # [https://abarrelfull.blogspot.com/2023/03/north-sea-gas-development-calls-for.html North Sea gas development calls for Dutch expertise] | ||
+ | # [https://a-barrel-full.blogspot.com/2023/03/corinth-pipeworks-is-awarded-contract.html Corinth Pipeworks is awarded contract for the N05-A pipeline] | ||
[[category:Field]] | [[category:Field]] | ||
[[category:Netherlands]] | [[category:Netherlands]] | ||
− | [[category: | + | [[category:One Dyas]] |
Latest revision as of 13:17, 30 March 2023
Summary Information
- Operator: One Dyas
- Country: https://onedyas.com/
- Location: North Sea, Netherlands
- Production start: 2024 target
- Partners: ONE-Dyas, Hansa Hydrocarbons and EBN
- Type: Gas
- Estimated Reserves:
- Production Volume:
Description
- The largest new gas development in the Netherlands in the last 15 years.
- The expected volume to be produced from the N05-A field and surrounding prospects is 4.5 to 13 BCM
- The platform will be connected to an offshore windfarm, to reduce emissions.
Contractors
- Allseas: Pipeline installation and burial
- HSM: Platform construction
- Heerema Marine Contractors: Platform installation
- Corinth Pipeworks: Supply of High Frequency Welded (HFW) steel pipes
History
- 2022 - HSM awarded platform contract
- 2023 - Final investment decision