Difference between revisions of "Huelva LNG Terminal"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) |
||
Line 1: | Line 1: | ||
− | Summary Information | + | === Summary Information === |
* Ownership: Enagas | * Ownership: Enagas | ||
Line 7: | Line 7: | ||
* Status: In Operation | * Status: In Operation | ||
− | + | === Brief Description === | |
* A large regasification terminal | * A large regasification terminal | ||
− | + | === Technical Details === | |
* Storage capacity: 60,000 m3 + 105,000 m3 + 2 * 150,000 m3 | * Storage capacity: 60,000 m3 + 105,000 m3 + 2 * 150,000 m3 | ||
* Unloading capacity: | * Unloading capacity: | ||
* Send out capacity: | * Send out capacity: | ||
* Constructor: | * Constructor: | ||
− | + | ** Expansion: | |
− | + | ** **Foster Wheeler** - Detailed engineering, equipment and material procurement, and construction supervision | |
− | + | ** **Freyssinet:** Pre-stressing for LNG tanks 3,4 &5 | |
− | + | ** **Saipem:** Construction of tanks 3 & 4 | |
− | + | === Ongoing Projects/Project Status === | |
* A fifth tank of capacity 150.000 m3 is under construction | * A fifth tank of capacity 150.000 m3 is under construction | ||
− | + | === Suppliers / Customers === | |
* Suppliers: | * Suppliers: | ||
* Customers: | * Customers: | ||
− | + | === History === | |
* 1988 - Terminal commences operations with a single tank of 60,000 m3 | * 1988 - Terminal commences operations with a single tank of 60,000 m3 | ||
* 1992 - The second tank (105,000 m3) came into operation | * 1992 - The second tank (105,000 m3) came into operation | ||
Line 36: | Line 36: | ||
* 2006 - The fourth tank (150,000 m3) came into operation | * 2006 - The fourth tank (150,000 m3) came into operation | ||
− | + | === Other Information | |
* - | * - | ||
− | + | === Links === | |
# [http://www.enagas.es/cs/Satellite?cid=1142417697959&language=en&pagename=ENAGAS%2FPage%2FENAG_pintarContenidoFinal Terminal Webpage] | # [http://www.enagas.es/cs/Satellite?cid=1142417697959&language=en&pagename=ENAGAS%2FPage%2FENAG_pintarContenidoFinal Terminal Webpage] | ||
− | # | + | # [[Freyssinet LNG Tank References]] |
− | # | + | # [[Saipem LNG References]] |
# [http://killajoules.wikidot.com/archive:foster-wheeler-iberia-wins-two-lng-terminal-expansio Foster Wheeler Iberia Wins Two LNG Terminal Expansion Projects in Spain] | # [http://killajoules.wikidot.com/archive:foster-wheeler-iberia-wins-two-lng-terminal-expansio Foster Wheeler Iberia Wins Two LNG Terminal Expansion Projects in Spain] | ||
Latest revision as of 14:24, 19 February 2023
Contents
Summary Information
- Ownership: Enagas
- Website: http://www.enagas.es/
- Location: The plant is located at the mouth of the rivers Tinto and Odiel, Huelva
- Capacity: million tons/annum
- Status: In Operation
Brief Description
- A large regasification terminal
Technical Details
- Storage capacity: 60,000 m3 + 105,000 m3 + 2 * 150,000 m3
- Unloading capacity:
- Send out capacity:
- Constructor:
- Expansion:
- **Foster Wheeler** - Detailed engineering, equipment and material procurement, and construction supervision
- **Freyssinet:** Pre-stressing for LNG tanks 3,4 &5
- **Saipem:** Construction of tanks 3 & 4
Ongoing Projects/Project Status
- A fifth tank of capacity 150.000 m3 is under construction
Suppliers / Customers
- Suppliers:
- Customers:
History
- 1988 - Terminal commences operations with a single tank of 60,000 m3
- 1992 - The second tank (105,000 m3) came into operation
- 2002 - Foster Wheeler awarded detailed engineering, equipment and material procurement, and construction supervision for expansion
- 2004 - The third tank (150,000 m3) came into operation
- 2006 - The fourth tank (150,000 m3) came into operation
=== Other Information
- -