Difference between revisions of "El Musel LNG Terminal"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) (Created page with "Summary Information * Ownership: Enagas * Website: http://www.enagas.es/ * Location: Near the city of Gijon in the province of Asturias, North Coast of Spain * Capacity: mil...") |
Abarrelfull (talk | contribs) |
||
| Line 44: | Line 44: | ||
# [http://www.sener-power-process.com/ENERGIA/ProjectsI/liquified-natural-gas-terminal-to-be-located-at-el-musel-gijon/en?pag=0&agno=&area=&categoria=ENERGIA_GAS&totalperpage=5 LIQUIFIED NATURAL GAS TERMINAL TO BE LOCATED AT EL MUSEL, GIJÓN] | # [http://www.sener-power-process.com/ENERGIA/ProjectsI/liquified-natural-gas-terminal-to-be-located-at-el-musel-gijon/en?pag=0&agno=&area=&categoria=ENERGIA_GAS&totalperpage=5 LIQUIFIED NATURAL GAS TERMINAL TO BE LOCATED AT EL MUSEL, GIJÓN] | ||
# [http://killajoules.wikidot.com/archive:enagas-has-recently-awarded-ikm-testing-spain-a-new Enagas has recently awarded IKM Testing Spain a new contract] | # [http://killajoules.wikidot.com/archive:enagas-has-recently-awarded-ikm-testing-spain-a-new Enagas has recently awarded IKM Testing Spain a new contract] | ||
| + | |||
| + | [[category:LNG]] | ||
| + | [[category:Spain]] | ||
| + | [[category:Endesa]] | ||
Revision as of 14:04, 19 February 2023
Summary Information
- Ownership: Enagas
- Website: http://www.enagas.es/
- Location: Near the city of Gijon in the province of Asturias, North Coast of Spain
- Capacity: million tons/annum
- Status: Under Construction
+++ Brief Description
- A regasifiaction terminal with two large tanks and unloading facilities for the largest tankers
+++ Technical Details
- Storage capacity: two 150,000 cubic meter LNG tanks
- Unloading capacity: A jetty will allow the unloading of LNG carriers with a capacity up to 230,000 m3
- Send out capacity: 800,000 normal cubic meters/hour
- Constructor:
* **Fluor:** Detailed engineering, procurement services and construction management (EPCM) * **Sofregaz-SENER:** Basic engineering * **IKM Testing:** Pre-commissioning and commissioning contract
- Licensor:
+++ Ongoing Projects/Project Status
- The project has been postponed by order of the energy regulator
- Commissioning is expected in [[[LNG Terminals to be Completed in 2012 | 2012]]]
+++ Suppliers / Customers
- Suppliers:
- Customers: The terminal will supply the domestic gas grid and two combined cycle power stations in the Asturia province
+++ History
- 2006 - The Ministry of Industry awarded the terminal contract to Enagas
- 2008 - Fluor awarded EPC contract
- 2012 - IKM Testing awarded commissioning contract