Difference between revisions of "Ghasha and Hail Sour Gas Fields"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) (Created page with "=== Summary Information === * Operator: ADNOC * Country: Abu Dhabi * Location: * Production start: * Partners: * Type: Oil / Gas * Estimated Reserves: * Production Volume:...") |
Abarrelfull (talk | contribs) |
||
Line 13: | Line 13: | ||
=== Contractors === | === Contractors === | ||
− | * | + | * Tecnimont, Technip Energies and Samsung Engineering: Early engineering and procurement works |
=== History === | === History === | ||
* 2018 - Eni bought a 25 percent stake the project | * 2018 - Eni bought a 25 percent stake the project | ||
+ | * 2023 - Tecnimont, Technip Energies and Samsung Engineering awarded early engineering and procurement works | ||
=== Geology === | === Geology === | ||
Line 23: | Line 24: | ||
=== Links === | === Links === | ||
# [http://killajoules.wikidot.com/archive:eni-signs-ghasha-gas-concession-with-adnoc-strengthe Eni signs Ghasha gas concession with ADNOC strengthening its presence in the United Arab Emirates] | # [http://killajoules.wikidot.com/archive:eni-signs-ghasha-gas-concession-with-adnoc-strengthe Eni signs Ghasha gas concession with ADNOC strengthening its presence in the United Arab Emirates] | ||
+ | # [https://a-barrel-full.blogspot.com/2023/01/a-jv-composed-of-tecnimont-technip.html A JV composed of Tecnimont, Technip Energies and Samsung Engineering awarded early engineering and procurement works contract for a total value of USD 80 million by ADNOC for the Hail & Ghasha Gas Development Project in Abu Dhabi] | ||
Revision as of 12:44, 22 January 2023
Summary Information
- Operator: ADNOC
- Country: Abu Dhabi
- Location:
- Production start:
- Partners:
- Type: Oil / Gas
- Estimated Reserves:
- Production Volume: Planned - 1.5 billion standard cubic feet (bscfd) of natural gas per day
Description
- The Ghasha mega-project is the world’s largest offshore sour gas development
Contractors
- Tecnimont, Technip Energies and Samsung Engineering: Early engineering and procurement works
History
- 2018 - Eni bought a 25 percent stake the project
- 2023 - Tecnimont, Technip Energies and Samsung Engineering awarded early engineering and procurement works
Geology
Links
- Eni signs Ghasha gas concession with ADNOC strengthening its presence in the United Arab Emirates
- A JV composed of Tecnimont, Technip Energies and Samsung Engineering awarded early engineering and procurement works contract for a total value of USD 80 million by ADNOC for the Hail & Ghasha Gas Development Project in Abu Dhabi