Line 6: Line 6:
 
* Partners: PGNiG - 42.2%, ConocoPhillips 49.2%, TotalEnergies 20.2%, Vår Energi 9.1%
 
* Partners: PGNiG - 42.2%, ConocoPhillips 49.2%, TotalEnergies 20.2%, Vår Energi 9.1%
 
* Type: Oil / Gas
 
* Type: Oil / Gas
* Estimated Reserves:  
+
* Estimated Reserves: 80-180 million barrels oil equivalent
 
* Production Volume:  
 
* Production Volume:  
  
 
=== Description ===
 
=== Description ===
* The field is located on the border to the UK sector and the Norwegian share of the field is 99.57 per cent. The water depth is 75 metres. Tommeliten A was proven in 1977 and the plan for development and operation (PDO) was approved in July 2022. The field is being developed with two subsea templates tied-back to the [[Ekofisk Oil Field | Ekofisk Complex]], where a new processing module will be installed.
+
* The field is located on the border to the UK sector and the Norwegian share of the field is 99.57 per cent. The water depth is 75 metres. Tommeliten A was proven in 1977 and the plan for development and operation (PDO) was approved in July 2022.  
 +
* The development concept is a two-by-six slot subsea production system (SPS) with ten production wells and an electrically heated flowline, tied into the [[Ekofisk Oil Field | Ekofisk Complex]], including installation of a new processing module.
  
 
=== Contractors ===
 
=== Contractors ===
Line 16: Line 17:
  
 
=== History ===
 
=== History ===
 +
* 1977 - Tommeliten A discovered
 
* 2022 - PDO granted
 
* 2022 - PDO granted
  
Line 23: Line 25:
 
=== Links ===
 
=== Links ===
 
# [https://factpages.npd.no/en/field/pageview/all/40867462 NPD]
 
# [https://factpages.npd.no/en/field/pageview/all/40867462 NPD]
 +
# [https://abarrelfull.blogspot.com/2023/01/conocophillips-skandinavia-as-submits.html ConocoPhillips Skandinavia AS Submits Tommeliten A Plan for Development and Operation]
 
# [https://abarrelfull.blogspot.com/2023/01/tommeliten-plan-for-development-and.html Tommeliten A Plan for Development and Operation Approved]
 
# [https://abarrelfull.blogspot.com/2023/01/tommeliten-plan-for-development-and.html Tommeliten A Plan for Development and Operation Approved]
  

Revision as of 12:48, 10 January 2023

Summary Information

  • Operator: ConocoPhillips
  • Country: Norway
  • Location: southern part of the Norwegian sector in the North Sea
  • Production start: Expected 2024
  • Partners: PGNiG - 42.2%, ConocoPhillips 49.2%, TotalEnergies 20.2%, Vår Energi 9.1%
  • Type: Oil / Gas
  • Estimated Reserves: 80-180 million barrels oil equivalent
  • Production Volume:

Description

  • The field is located on the border to the UK sector and the Norwegian share of the field is 99.57 per cent. The water depth is 75 metres. Tommeliten A was proven in 1977 and the plan for development and operation (PDO) was approved in July 2022.
  • The development concept is a two-by-six slot subsea production system (SPS) with ten production wells and an electrically heated flowline, tied into the Ekofisk Complex, including installation of a new processing module.

Contractors

  • -

History

  • 1977 - Tommeliten A discovered
  • 2022 - PDO granted

Geology

  • The reservoir contains gas condensate and volatile oil in chalk in the Paleocene Ekofisk Formation and Upper Cretaceous Tor Formation at a depth of about 3000 metres. The reservoir qualities vary across both formations and are affected by faults and fractures

Links

  1. NPD
  2. ConocoPhillips Skandinavia AS Submits Tommeliten A Plan for Development and Operation
  3. Tommeliten A Plan for Development and Operation Approved