Difference between revisions of "Tommeliten A Oil and Gas Field"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) |
||
| Line 6: | Line 6: | ||
* Partners: PGNiG - 42.2%, ConocoPhillips 49.2%, TotalEnergies 20.2%, Vår Energi 9.1% | * Partners: PGNiG - 42.2%, ConocoPhillips 49.2%, TotalEnergies 20.2%, Vår Energi 9.1% | ||
* Type: Oil / Gas | * Type: Oil / Gas | ||
| − | * Estimated Reserves: | + | * Estimated Reserves: 80-180 million barrels oil equivalent |
* Production Volume: | * Production Volume: | ||
=== Description === | === Description === | ||
| − | * The field is located on the border to the UK sector and the Norwegian share of the field is 99.57 per cent. The water depth is 75 metres. Tommeliten A was proven in 1977 and the plan for development and operation (PDO) was approved in July 2022. The | + | * The field is located on the border to the UK sector and the Norwegian share of the field is 99.57 per cent. The water depth is 75 metres. Tommeliten A was proven in 1977 and the plan for development and operation (PDO) was approved in July 2022. |
| + | * The development concept is a two-by-six slot subsea production system (SPS) with ten production wells and an electrically heated flowline, tied into the [[Ekofisk Oil Field | Ekofisk Complex]], including installation of a new processing module. | ||
=== Contractors === | === Contractors === | ||
| Line 16: | Line 17: | ||
=== History === | === History === | ||
| + | * 1977 - Tommeliten A discovered | ||
* 2022 - PDO granted | * 2022 - PDO granted | ||
| Line 23: | Line 25: | ||
=== Links === | === Links === | ||
# [https://factpages.npd.no/en/field/pageview/all/40867462 NPD] | # [https://factpages.npd.no/en/field/pageview/all/40867462 NPD] | ||
| + | # [https://abarrelfull.blogspot.com/2023/01/conocophillips-skandinavia-as-submits.html ConocoPhillips Skandinavia AS Submits Tommeliten A Plan for Development and Operation] | ||
# [https://abarrelfull.blogspot.com/2023/01/tommeliten-plan-for-development-and.html Tommeliten A Plan for Development and Operation Approved] | # [https://abarrelfull.blogspot.com/2023/01/tommeliten-plan-for-development-and.html Tommeliten A Plan for Development and Operation Approved] | ||
Revision as of 12:48, 10 January 2023
Summary Information
- Operator: ConocoPhillips
- Country: Norway
- Location: southern part of the Norwegian sector in the North Sea
- Production start: Expected 2024
- Partners: PGNiG - 42.2%, ConocoPhillips 49.2%, TotalEnergies 20.2%, Vår Energi 9.1%
- Type: Oil / Gas
- Estimated Reserves: 80-180 million barrels oil equivalent
- Production Volume:
Description
- The field is located on the border to the UK sector and the Norwegian share of the field is 99.57 per cent. The water depth is 75 metres. Tommeliten A was proven in 1977 and the plan for development and operation (PDO) was approved in July 2022.
- The development concept is a two-by-six slot subsea production system (SPS) with ten production wells and an electrically heated flowline, tied into the Ekofisk Complex, including installation of a new processing module.
Contractors
- -
History
- 1977 - Tommeliten A discovered
- 2022 - PDO granted
Geology
- The reservoir contains gas condensate and volatile oil in chalk in the Paleocene Ekofisk Formation and Upper Cretaceous Tor Formation at a depth of about 3000 metres. The reservoir qualities vary across both formations and are affected by faults and fractures