Difference between revisions of "Sierrita Gas Pipeline"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) |
||
Line 22: | Line 22: | ||
=== Links === | === Links === | ||
+ | # [[EIA Natural Gas Pipeline Projects 2010 - 2014]] | ||
# [https://abarrelfull.blogspot.com/2022/12/kinder-morgan-places-sierrita-pipeline.html Kinder Morgan Places Sierrita Pipeline in Service to Provide Natural Gas to Customers in Mexico] | # [https://abarrelfull.blogspot.com/2022/12/kinder-morgan-places-sierrita-pipeline.html Kinder Morgan Places Sierrita Pipeline in Service to Provide Natural Gas to Customers in Mexico] | ||
Latest revision as of 11:24, 30 December 2022
Summary Information
- Source: Tucson, Arizona
- Destination: Sasabe, Arizona
- Ownership: Kinder Morgan
- Website: www.kindermorgan.com
- Length: kilometres (60 miles)
- Capacity: 200 million cubic feet per day
- Status: Operating
Details
- The pipeline extends from El Paso Natural Gas’ existing south mainlines near Tucson, Arizona, to the U.S.-Mexico border near Sasabe, Arizona, a distance of
approximately 60-mile
- It is a 36-inch diameter pipeline provides with approximately 200 million cubic feet per day of firm transportation capacity
- The Sierrita Pipeline interconnects via an international border crossing with a natural gas pipeline in Mexico.
History
- 2014 - The pipeline entered service
Other Information
- -