Difference between revisions of "Tinrhert Gas Field"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) |
||
(4 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
=== Summary Information === | === Summary Information === | ||
− | * Operator: | + | * Operator: Sonatrach |
− | * Country: | + | * Country: Algeria |
− | * Location: | + | * Location: 1,500 kilometres southeast of Algiers |
− | * Production start: | + | * Production start: 2022 |
* Partners: | * Partners: | ||
− | * Type: | + | * Type: Gas |
* Estimated Reserves: | * Estimated Reserves: | ||
− | * Production Volume: | + | * Production Volume: |
=== Description === | === Description === | ||
Line 17: | Line 17: | ||
=== History === | === History === | ||
− | * | + | * 2018 - Petrofac awarded EPC contract for phase 1 |
+ | * 2022- First gas produced | ||
+ | * 2022 - Petrofac awarded EPC contract for phase 2 | ||
=== Geology === | === Geology === | ||
Line 23: | Line 25: | ||
=== Links === | === Links === | ||
− | # | + | # [https://abarrelfull.blogspot.com/2022/08/petrofac-awarded-us600-million-project.html Petrofac awarded US$600 million project in Algeria] |
− | + | # [https://a-barrel-full.blogspot.com/2022/08/first-gas-introduced-at-tinrhert-field.html First Gas introduced at Tinrhert Field Development project in Algeria] | |
+ | # [https://a-barrel-full.blogspot.com/2022/12/production-starts-at-tinrhert-field.html Production starts at Tinrhert Field Development project in Algeria] | ||
[[category:Field]] | [[category:Field]] | ||
[[category:Algeria]] | [[category:Algeria]] | ||
[[category:ENI]] | [[category:ENI]] |
Latest revision as of 10:38, 20 December 2022
Summary Information
- Operator: Sonatrach
- Country: Algeria
- Location: 1,500 kilometres southeast of Algiers
- Production start: 2022
- Partners:
- Type: Gas
- Estimated Reserves:
- Production Volume:
Description
- The development includes 36 wells in the first phase and pipeline connections to the gas processing complex at the Ohanet Gas and Condensate Field
Contractors
- Petrofac
- EPC1 : provide a new inlet separation and compression centre. Under the terms of the 36-month contract, the scope of work includes a pipeline network of approximately 400 km to connect 36 wells, along with commissioning, start-up and performance testing of facilities.
History
- 2018 - Petrofac awarded EPC contract for phase 1
- 2022- First gas produced
- 2022 - Petrofac awarded EPC contract for phase 2