Difference between revisions of "Anning and Somerville Gas Fields"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) (→Links) |
||
| Line 29: | Line 29: | ||
[[category:Field]] | [[category:Field]] | ||
[[category:UK]] | [[category:UK]] | ||
| − | [[category: | + | [[category:Hartshead]] |
Revision as of 10:32, 5 November 2022
Summary Information
- Operator: Hartshead
- Country: UK
- Location: Southern North Sea
- Production start:
- Partners:
- Type: Gas
- Estimated Reserves:
- Production Volume:
Description
- The development concept consists of six production wells from two wireline capable Normally Unmanned Installation (NUI) platforms at Anning and Somerville.
- These platforms will then connect via a subsea pipeline to third party infrastructure for onward transportation and processing to entry into the UK gas network. A pipeline to the Leman Gas Fields is being considered
- Final Investment Decision (FID) is expected in 2023 and first gas in late 2024
Contractors
- -
History
- 2022 - Submission made to the North Sea Transition Authority