Difference between revisions of "Anning and Somerville Gas Fields"

From A Barrel Full
Jump to navigation Jump to search
(Created page with "=== Summary Information === * Operator: * Country: UK * Location: Southern North Sea * Production start: * Partners: * Type: Oil / Gas * Estimated Reserves: * Production V...")
 
Line 1: Line 1:
 
=== Summary Information ===
 
=== Summary Information ===
* Operator:  
+
* Operator: Hartshead
 
* Country: UK
 
* Country: UK
 
* Location: Southern North Sea
 
* Location: Southern North Sea
 
* Production start:  
 
* Production start:  
 
* Partners:  
 
* Partners:  
* Type: Oil / Gas
+
* Type: Gas
 
* Estimated Reserves:  
 
* Estimated Reserves:  
 
* Production Volume:  
 
* Production Volume:  
Line 11: Line 11:
 
=== Description ===
 
=== Description ===
 
* The development concept consists of six production wells from two wireline capable Normally Unmanned Installation (NUI) platforms at Anning and Somerville.  
 
* The development concept consists of six production wells from two wireline capable Normally Unmanned Installation (NUI) platforms at Anning and Somerville.  
* These platforms will then connect via a subsea pipeline to third party infrastructure for onward transportation and processing to entry into the UK gas network
+
* These platforms will then connect via a subsea pipeline to third party infrastructure for onward transportation and processing to entry into the UK gas network. A pipeline to the [[Leman Gas Fields]] is being considered
 
* Final Investment Decision (FID) is expected in 2023 and first gas in late 2024
 
* Final Investment Decision (FID) is expected in 2023 and first gas in late 2024
  
Line 18: Line 18:
  
 
=== History ===
 
=== History ===
* 2022 -  
+
* 2022 - Submission made to the North Sea Transition Authority
  
 
=== Geology ===
 
=== Geology ===
Line 24: Line 24:
  
 
=== Links ===
 
=== Links ===
# [https://hartshead-resources.com.au/united-kingdom/ ]
+
# [https://hartshead-resources.com.au/united-kingdom/ Hartshead, Projects]
  
  

Revision as of 10:32, 5 November 2022

Summary Information

  • Operator: Hartshead
  • Country: UK
  • Location: Southern North Sea
  • Production start:
  • Partners:
  • Type: Gas
  • Estimated Reserves:
  • Production Volume:

Description

  • The development concept consists of six production wells from two wireline capable Normally Unmanned Installation (NUI) platforms at Anning and Somerville.
  • These platforms will then connect via a subsea pipeline to third party infrastructure for onward transportation and processing to entry into the UK gas network. A pipeline to the Leman Gas Fields is being considered
  • Final Investment Decision (FID) is expected in 2023 and first gas in late 2024

Contractors

  • -

History

  • 2022 - Submission made to the North Sea Transition Authority

Geology

Links

  1. Hartshead, Projects