Difference between revisions of "LNG Terminal Projects to be Completed in 2026"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) |
||
| Line 1: | Line 1: | ||
| + | === Introduction === | ||
| + | * We only expect a large number of new export terminals to enter operation in 2026, bringing as much as 90 million tons of capacity | ||
| − | + | ==== Export Terminals ==== | |
# [[Delfin LNG Export Terminal Project]] | # [[Delfin LNG Export Terminal Project]] | ||
# [[Malaysia Sabah FLNG Terminal]] | # [[Malaysia Sabah FLNG Terminal]] | ||
# [[Pluto LNG Terminal]] - Phase 2 | # [[Pluto LNG Terminal]] - Phase 2 | ||
| + | |||
| + | ==== Import Terminals ==== | ||
Revision as of 17:18, 31 October 2022
Introduction
- We only expect a large number of new export terminals to enter operation in 2026, bringing as much as 90 million tons of capacity