Difference between revisions of "Snam Adriatic Floating LNG Terminal"
		
		
		
		
		Jump to navigation
		Jump to search
		
| Abarrelfull (talk | contribs) | Abarrelfull (talk | contribs)  | ||
| Line 18: | Line 18: | ||
| === Ongoing Projects/Project Status === | === Ongoing Projects/Project Status === | ||
| − | + | * The vessel is contracted until the second half of 2023, after which it will be transferred to Snam | |
| + | * The project is scheduled for completion in [[LNG Terminal Projects to be Completed in 2023 | 2023]] | ||
| === Suppliers / Customers === | === Suppliers / Customers === | ||
Revision as of 08:38, 21 July 2022
Contents
Summary Information
- Ownership: Snam
- Website: https://www.snam.it/
- Location: Northern Italy
- Capacity: 5 BCM/annum
- Status: Planned
Brief Description
- BW Singapore, built in 2015, has a maximum storage capacity of about 170,000 cubic metres of LNG (liquefied natural gas) and a nominal continuous regasification capacity of about 5 billion cubic metres per year.
Technical Details
- Storage capacity: 170,000 cubic metres
- Unloading capacity:
- Send out capacity: 5BCM/annum
- Constructor:
Ongoing Projects/Project Status
- The vessel is contracted until the second half of 2023, after which it will be transferred to Snam
- The project is scheduled for completion in 2023
Suppliers / Customers
- Suppliers:
- Customers:
History
- 2022 - Snam acquired the vessel from BW LNG
Other Information
-
