| Abarrelfull (talk | contribs)  (Created page with "=== Summary Information ===  * Ownership:  * Website:  * Location:   * Capacity: million tons/annum  * Status: (In Operation / Planned / Under Construction)  === Brief Descrip...") | Abarrelfull (talk | contribs)  | ||
| (8 intermediate revisions by the same user not shown) | |||
| Line 1: | Line 1: | ||
| === Summary Information === | === Summary Information === | ||
| − | * Ownership:   | + | * Ownership: Kinder Morgan | 
| − | * Website:   | + | * Website: https://www.kindermorgan.com/ | 
| − | * Location:  | + | * Location: Jackson County, Miss | 
| − | * Capacity: million tons/annum   | + | * Capacity: 10.0 million tons/annum   | 
| − | * Status:  | + | * Status: Planned | 
| === Brief Description === | === Brief Description === | ||
| − | *  | + | * The project is the conversion of [[Gulf Pascagoula LNG Terminal]] into a liquefaction plant | 
| + | * Phase I will consist of a single liquefaction train expected to have a base LNG production capacity of approximately 5 million tonnes per annum (MTPA).   | ||
| + | * The LNG produced by this train will be stored in the terminal’s two existing LNG storage tanks which have a combined capacity of 320,000 cubic meters | ||
| + | * Phase II of the project will consist of a second liquefaction train identical in size to the first train, providing a total project base level liquefaction capacity of 10 MTPA | ||
| === Technical Details === | === Technical Details === | ||
| − | * Storage capacity: | + | * Storage capacity: 2x 160,000 M3 | 
| * Constructor: | * Constructor: | ||
| − | * Licensor: | + | ** '''KBR:''' Federal Energy Regulatory Commission (FERC) FEED engineering and FERC report pre-filing services | 
| + | * Licensor: Air Products | ||
| === Ongoing Projects/Project Status === | === Ongoing Projects/Project Status === | ||
| Line 23: | Line 27: | ||
| === History === | === History === | ||
| − | * - | + | * 2014 - Kinder Morgan became the owner after merging with El Paso | 
| === Other Information === | === Other Information === | ||
| Line 29: | Line 33: | ||
| === Relevant Links === | === Relevant Links === | ||
| − | #  | + | # [https://abarrelfull.blogspot.com/2022/01/kinder-morgan-announces-closing-of.html Kinder Morgan Announces Closing of the Merger Transactions] | 
| + | # [https://abarrelfull.blogspot.com/2022/01/kbr-wins-ferc-feed-contract-for-gulf.html KBR Wins FERC FEED Contract for Gulf LNG Liquefaction Company, LLC] | ||
Latest revision as of 14:09, 19 January 2022
Contents
Summary Information
- Ownership: Kinder Morgan
- Website: https://www.kindermorgan.com/
- Location: Jackson County, Miss
- Capacity: 10.0 million tons/annum
- Status: Planned
Brief Description
- The project is the conversion of Gulf Pascagoula LNG Terminal into a liquefaction plant
- Phase I will consist of a single liquefaction train expected to have a base LNG production capacity of approximately 5 million tonnes per annum (MTPA).
- The LNG produced by this train will be stored in the terminal’s two existing LNG storage tanks which have a combined capacity of 320,000 cubic meters
- Phase II of the project will consist of a second liquefaction train identical in size to the first train, providing a total project base level liquefaction capacity of 10 MTPA
Technical Details
- Storage capacity: 2x 160,000 M3
- Constructor:
- KBR: Federal Energy Regulatory Commission (FERC) FEED engineering and FERC report pre-filing services
 
- Licensor: Air Products
Ongoing Projects/Project Status
- Commissioning is expected in [[[LNG Terminals to be Completed in 201X | 201X]]]
Suppliers / Customers
- Suppliers:
- Customers:
History
- 2014 - Kinder Morgan became the owner after merging with El Paso
Other Information
- -