Difference between revisions of "Gulf LNG Export Terminal Project"
		
		
		
		
		Jump to navigation
		Jump to search
		
| Abarrelfull (talk | contribs)  (Created page with "=== Summary Information ===  * Ownership:  * Website:  * Location:   * Capacity: million tons/annum  * Status: (In Operation / Planned / Under Construction)  === Brief Descrip...") | Abarrelfull (talk | contribs)  | ||
| Line 8: | Line 8: | ||
| === Brief Description === | === Brief Description === | ||
| − | *  | + | * The project is the conversion of [[Gulf Pascagoula LNG Terminal]] into a liquefaction plant | 
| + | * Phase I will consist of a single liquefaction train expected to have a base LNG production capacity of approximately 5 million tonnes per annum (MTPA).   | ||
| + | * The LNG produced by this train will be stored in the terminal’s two existing LNG storage tanks which have a combined capacity of 320,000 cubic meters | ||
| === Technical Details === | === Technical Details === | ||
Revision as of 13:38, 19 January 2022
Contents
Summary Information
- Ownership:
- Website:
- Location:
- Capacity: million tons/annum
- Status: (In Operation / Planned / Under Construction)
Brief Description
- The project is the conversion of Gulf Pascagoula LNG Terminal into a liquefaction plant
- Phase I will consist of a single liquefaction train expected to have a base LNG production capacity of approximately 5 million tonnes per annum (MTPA).
- The LNG produced by this train will be stored in the terminal’s two existing LNG storage tanks which have a combined capacity of 320,000 cubic meters
Technical Details
- Storage capacity:
- Constructor:
- Licensor:
Ongoing Projects/Project Status
- Commissioning is expected in [[[LNG Terminals to be Completed in 201X | 201X]]]