Difference between revisions of "Sergipe LNG Terminal"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) |
||
Line 9: | Line 9: | ||
=== Brief Description === | === Brief Description === | ||
* The terminal utilises the Golar Nanook Floating Storage and Regasification Unit (FSRU) located 8.5km off the coast | * The terminal utilises the Golar Nanook Floating Storage and Regasification Unit (FSRU) located 8.5km off the coast | ||
+ | * Golar LNG is the operator of the FSRU | ||
=== Technical Details === | === Technical Details === |
Revision as of 08:58, 18 January 2022
Contents
Summary Information
- Ownership: New Fortress Energy
- Website: https://www.newfortressenergy.com/
- Location: Port of Sergipe, Brazil
- Capacity: 3.6 million tons/annum
- Status: In Operation
Brief Description
- The terminal utilises the Golar Nanook Floating Storage and Regasification Unit (FSRU) located 8.5km off the coast
- Golar LNG is the operator of the FSRU
Technical Details
- Storage capacity: 170,000 m3
- Unloading capacity:
- Send out capacity:
- Constructor:
Ongoing Projects/Project Status
- The terminal was commissioned in 2020
Suppliers / Customers
- Suppliers:
- Customers: The FRSU is connected by pipeline to CELSE’s Usina Termoelétrica (UTE) Porto de Sergipe I combined-cycle gas-fired power plant
History
- 2018 - Financial closure for the project
- 2020 - The terminal was commissioned
- 2021 - New Fortress Energy acquires the terminal
Other Information
-